# Reporting # Introduction With the step-by-step development of society, reporting is no longer rare. When writing a report, you should pay attention to covering the basic elements of the report. The following is the report of building self-examination and self-correction, welcome to read!

1. Building self-inspection and self-correction report

According to the requirements of the Land and Resources Construction Bureau of xx High-tech Zone and the spirit of the Notice of the Housing and Urban-Rural Development Bureau on Printing and Distributing the Work Plan of Quality and Safety of Construction Projects and Supervision, Law Enforcement and Inspection of Construction Market in the whole city, the new hospital construction preparation office of xx Maternal and Child Health Hospital conducted a serious self-inspection activity on the new hospital construction project. The relevant information is now reported as follows: 1. Basic information of the project:

The relocation and expansion project of xx Maternal and Child Health Hospital (Children's Hospital) is located in xx. Covering an area of xx square meters, the building area is xx square meters, the construction investment is about xx billion yuan, and the construction period is 3 years. The construction is divided into two phases, the first phase is about xx square meters. There are xx beds, mainly including outpatient medical technology complex building, health care building, inpatient building (pediatric ward building)No./kloc-0, inpatient building No.2, logistics building and infection building, with a total of six units. Some places have corridor connections, and some places have basements. The first phase of the project is divided into two blocks, the first block has a construction area of xx square meters, and the second block has a construction area of xx square meters.

Second, the current project progress:

At present, the construction of the new hospital has completed all the procedures before the project construction. Organized and implemented general construction contract (the first bid is xx Group Co., Ltd., and the second bid is xx Co., Ltd.), engineering supervision (xx Xing supervision company), follow-up audit (X audit company, xx joint audit company) and wall construction bidding (X construction company). At present, xx Company in the first bid section has completed the leveling of the construction site, the construction of office and living quarters, and improved the engineering construction procedures. 654381October 23rd. At present, 70% of the earthwork of outpatient medical technology building has been completed, and 40% of buildings 1 and 2/have been completed respectively. Completed the filing of tower crane foundation, and now the tower foundation is being poured. In the second bid section, Company X completed the construction of temporary housing, and basically completed the work of three links and one leveling. The south courtyard wall has completed the rubble foundation construction, and the north courtyard wall is digging the foundation.

Third, the overall situation of self-examination:

Under the unified organization and leadership of the new hospital construction headquarters, the preparatory office took the lead in inspecting the project. As the project has just started, the engineering quantity is very small, and the inspection contents mainly include: engineering quality, safe production and civilized construction, and market behavior of all parties. Judging from the inspection, the basic procedures of the project construction are in line with the specifications, the project quality is under control, the safety production measures are basically implemented, and the market behavior is standardized.

1, can seriously implement the laws and regulations, normative documents and mandatory standards of engineering quality and safety management. All kinds of bidding are carried out in full accordance with the bidding procedures, all construction procedures are complete, construction permits are complete, and security and quality inspection procedures are put on record. The hospital preparation office has formulated various rules and regulations, defined the division of labor, and posted the system on the wall; Construction and supervision units have a strong sense of quality and safety. According to the standards for establishing demonstration projects, a quality and safety assurance system was established, which beautified the construction environment. The survey, design, supervision and construction units all have corresponding qualifications, and the project management personnel are employed according to all the tender documents. There is no affiliation, subcontracting and illegal subcontracting.

2. The project construction parties have established the project quality assurance system and can operate effectively, and the construction drawing review is completed in time. Project quality assurance measures are formulated and followed up in time, and the overall quality of the project is good. Engineering quality control data, engineering safety and function test data are relatively complete and standardized.

3. The responsibility for production safety on the construction site has been put in place, and the management network for production safety has basically taken shape. Various special safety plans can be formulated and implemented in time, and the lifting equipment on the construction site has been put on record and is under construction, with a good level of civilized construction. No potential safety hazards were found during the inspection.

Fourth, the existing problems:

First, the project manager is not on duty in time. Second, the on-site records of supervisors are incomplete. Third, the supervision unit failed to carry out compulsory supervision on relevant safety production standards.

Verb (abbreviation for verb) Subsequent steps:

In the future, we should focus on four aspects of work. First, strictly implement capital construction procedures, further strengthen supervision and management services, and intensify inspections. The second is to strengthen the construction of honesty and standardize market behavior. Resolutely stop linking, subcontracting and illegal subcontracting. The third is to deepen the management of construction site and push the project quality management to a new level. The fourth is to comprehensively implement the comprehensive management of construction safety production. Really put the responsibility of production safety into every link, every post and every employee.

2. Building self-examination and self-correction report

According to the spirit of Yan Jianfa [20xx] No.8 document, in order to further strengthen and improve the safety work of the project department, effectively guarantee the safety of employees' lives and property, and ensure the normal construction order of the project, combined with the actual situation of the project department, the project department, together with the supervisor and the construction unit, carefully inspected the safety work on the construction site and carried out the investigation and management activities of hidden dangers on the construction site. The summary of self-examination and self-correction is as follows: 1. Site construction safety.

1, safe use of electricity

The electrical equipment on the construction site should be "one machine, one brake and one leakage" to ensure the safety of electricity use; Power supply equipment should have warning signs, primary and secondary distribution boxes should be placed neatly, and protective accessories should be in place; The protective zero line of the metal distribution box shell is intact, the leakage protection device is intact, the signs of the distribution box are clear, and the direction of the distribution line is clear.

2. Special equipment

The structures of all parts of the construction material hoist and electric hanging basket are not deformed, the connecting bolts are not loose, the wire ropes and pulleys are not abnormally worn, the wire ropes of all parts are well fixed, and the working scope is barrier-free. The oil level of each gear box and hydraulic oil tank meets the requirements, the power cable is not damaged, the limiting device is in place and the function is in good condition.

3, fire management

(1), construction area and other power distribution facilities, mechanical vehicles, warehouses and other parts are equipped with fire-fighting equipment and fire-fighting facilities, and the fire extinguishers work normally and have good performance. Classified storage in the warehouse, the electrical appliances in the warehouse operate normally, and wires and electrical appliances are not pulled randomly.

(2) The storage of oxygen acetylene conforms to safety regulations.

(3) power cord, socket, etc. The temporary lighting in the office area and canteen has been re-inspected and tested, and everything works normally without exception.

(4) There are no inflammable and explosive articles around the welding operation on the construction site.

4, safety protection facilities

The mouth of the cave and dangerous parts set up protective facilities and obvious signs; Set up safety fences at the edge and airport surface, install protective devices such as protective covers on small equipment on site, and equip fire-fighting facilities around power-consuming parts and inflammable and easy-to-package articles.

Second, the problems existing in the inspection

1, the layout of construction power lines is chaotic, and individual lines are not merged, which needs further improvement.

2. Regular inspection of equipment and improvement of various systems, but the inspection data of the equipment itself are incomplete and need to be further improved.

3. Individual safety protection facilities can't keep up with the construction progress because of crossover operation, which leads to the lag of safety protection during construction and needs to be strengthened.

Third, the corrective measures taken

In order to ensure the construction safety just now and eliminate all kinds of potential safety hazards, the project department puts forward the following rectification measures in view of the main problems existing in the self-inspection process:

1. Pay attention to the problem of construction electricity consumption, and the project department will make mandatory rectification for the lines that do not meet the requirements of safe electricity consumption on site.

2, improve and perfect the system at all levels, make the comprehensive safety management work rules-based, put in place, in strict accordance with the responsibility system for production safety to implement the responsibilities of all levels and departments.

3. To strengthen the management of all kinds of protective facilities, it is necessary to ensure that all kinds of protective facilities are synchronized with the construction progress.

In a word, some drawbacks and omissions were found through this inspection, and the project department made timely rectification, which made it effectively controlled and ensured the safe construction on site. However, safety work is a long-term work. The project department will continue to strictly grasp safety, pay close attention to safety, consolidate the basic work of safety management, improve employees' safety awareness, better implement various tasks and requirements of safety management, further enhance employees' safety responsibility awareness, clarify their respective responsibilities, and provide safety guarantee for the smooth progress of project construction.

3. Building self-examination and self-correction report

I. Preface 1. This report is aimed at the 27# building project in Lidao Mid-Levels.

2. This report is based on the information obtained by our company's Lidao Mid-Levels Washington Project Department that has passed the inspection and evaluation of all inspection lots of this project, based on the daily inspection, on-site inspection, witness sampling, parallel inspection, recheck and data review of the supervision engineer, and combined with the inspection and evaluation results of this project organized by our company.

Second, the project overview

1, project name:

Construction unit: xx

2. Design features:

Building 27 of Lidao Mid-Levels Huafu is located in Hangzhou West Road, Huangshi City. There are three main parts of energy saving in engineering buildings, namely, wall insulation system, roof insulation system and door and window system. The wall insulation system adopts external wall insulation, and the insulation thickness is 25mm. The main materials are rubber powder polystyrene particles, and the main construction techniques are interface mortar, rubber powder polystyrene particle construction, galvanized steel wire mesh (or glass fiber mesh) paving (steel wire mesh is fixed on the wall with expansion bolts) and anti-crack mortar layer. Roof insulation system is divided into inclined roof and flat roof, and the insulation layer adopts extruded polystyrene insulation board; The door and window system adopts colored aluminum alloy profiles, 50 series casement windows, 80 series sliding doors and windows, and the glass is 5+6+5 insulating glass.

Three. Basis for construction, inspection, evaluation and acceptance

1, design documents and design construction drawings.

2, construction and installation engineering quality inspection and evaluation standards, construction acceptance specifications and the corresponding national and regional current standards.

3. Technical standards, procedures and specifications followed in the test and detection.

4. National, regional and current laws and regulations on quality management of construction projects.

5. The project quality control objectives agreed in the construction contract.

Fourth, the quality control in the process of construction

1. External wall thermal insulation and energy-saving project: thermal insulation construction is divided into four steps: interface treatment, polystyrene particle construction, galvanized steel wire mesh paving, anti-crack mortar plastering and glass fiber mesh paving. First, carry out interface treatment, clean up the wall surface, remove the protrusions on the wall surface greater than or equal to 10mm, then roughen the concrete wall surface to achieve all the rough surfaces of the concrete wall surface, and then apply polystyrene particle mortar. The coating thickness meets the requirements, and the surface is smooth without hollowing, cracking and falling off. After the insulation layer is cured and dried, the next working procedure can be carried out. When fixing and laying galvanized steel wire mesh, the distance between anchor expansion bolts should not be greater than 50cm, and the lap length of the mesh edge should be greater than 40mm, and the doors and windows should be reinforced. Anti-crack mortar is completed in two times. Rub the surface layer on the galvanized steel wire mesh with a wooden brush to provide the corresponding interface for the connection of the next layer. Press the second layer of anti-crack mortar into the glass fiber grid cloth, and the glass fiber grid cloth will be laid flat without wrinkles and exposed bars. The anti-crack mortar shall be smooth, vertical and square.

2. Roof energy-saving project: SBS coiled material waterproof roof and extruded polystyrene insulation board are adopted in this project. Before waterproof engineering construction, the base must be clean and dry, and the nodes and roof drainage places (roof rainwater pipe joints, cornices, gutter, eaves gutter, roof corners, etc.). ) should be processed first, and the waterproof layer should be painted in layers to ensure that the molding thickness meets the design requirements. After waterproofing is completed, conduct 24-hour irrigation test, and lay insulation layer after no leakage. The insulation layer shall be constructed in sections and blocks, and the thickness and slope shall be strictly controlled. When laying, the thickness of two adjacent plates should be consistent, and the plates should be laid tightly, smoothly, stably and firmly.

3. Doors and windows engineering: This project adopts colored aluminum frames and insulating glass. The installation of external windows shall be in strict accordance with the requirements of design specifications of drawings, the hole shall be clean and dry, the installation of accessories shall conform to the requirements of specifications, the foaming agent shall be fully molded at one time, and the waterproof glue on the outer side of the door window frame shall be even and flat with the same width. Air tightness, water tightness, wind pressure resistance, heat transfer coefficient, glass shading coefficient, visible light transmittance and other technical indicators all meet the design specification requirements. After the doors and windows are installed, the water spraying test shall be carried out, and the water spraying test time and other matters shall be implemented according to relevant specifications. No water seepage was found, which met the acceptance criteria.

4. Building self-examination and self-correction report

According to the requirements of the Land and Resources Construction Bureau of xx High-tech Zone and the spirit of the Notice of the Housing and Urban-Rural Development Bureau on Printing and Distributing the Work Plan of Quality and Safety of Construction Projects and Supervision, Law Enforcement and Inspection of Construction Market in the whole city, the new hospital construction preparation office of xx Maternal and Child Health Hospital conducted a serious self-inspection activity on the new hospital construction project. The relevant information is now reported as follows: 1. Basic information of the project:

The relocation and expansion project of xx Maternal and Child Health Hospital (Children's Hospital) is located in xx. Covering an area of xx square meters, the building area is xx square meters, the construction investment is about xx billion yuan, and the construction period is 3 years. The construction is divided into two phases, the first phase is about xx square meters.

There are xx beds, mainly including outpatient medical technology complex building, health care building, inpatient building (pediatric ward building)No./kloc-0, inpatient building No.2, logistics building and infection building, with a total of six units. Some places have corridor connections, and some places have basements. The first phase of the project is divided into two blocks, the first block has a construction area of xx square meters, and the second block has a construction area of xx square meters.

Second, the current project progress:

At present, the construction of the new hospital has completed all the procedures before the project construction. Organized and implemented the construction general contracting (the first bid is xx Group Co., Ltd., and the second bid is xx Co., Ltd.), engineering supervision (xx Xing supervision enterprise), follow-up audit (X audit enterprise, xx joint audit enterprise) and wall construction bidding (X construction enterprise). Now, the xx enterprise in the first bid section has completed the leveling of the construction site, the construction of office and living quarters, and improved the procedures for the project construction.

654381October 23rd. At present, 70% of the earthwork of outpatient medical technology building has been completed, and 40% of buildings 1 and 2/have been completed respectively. Completed the filing of tower crane foundation, and now the tower foundation is being poured. Enterprise X in the second bid section completed the construction of temporary housing, and basically completed the work of three links and one leveling. The south courtyard wall has completed the rubble foundation construction, and the north courtyard wall is digging the foundation.

Third, the overall situation of self-examination:

Under the unified organization and leadership of the new hospital construction headquarters, the preparatory office took the lead in inspecting the project. As the project has just started, the engineering quantity is very small, and the inspection contents mainly include: engineering quality, safe production and civilized construction, and market behavior of all parties. Judging from the inspection, the basic procedures of the project construction are in line with the specifications, the project quality is under control, the safety production measures are basically implemented, and the market behavior is standardized.

1, can seriously implement the laws, regulations, normative documents and mandatory standards of engineering quality and safety management. All kinds of bidding are carried out in full accordance with the bidding procedures, all construction procedures are complete, construction permits are complete, and security and quality inspection procedures are put on record. The hospital preparation office has formulated various rules and regulations, defined the division of labor of staff and posted them on the wall. Construction and supervision units have a strong sense of quality and safety. According to the standards for establishing demonstration projects, a quality and safety assurance system was established, which beautified the construction environment. The survey, design, supervision and construction units all have corresponding qualifications, and the project management personnel are employed according to all the tender documents. There is no affiliation, subcontracting and illegal subcontracting.

2. The project construction parties have established the project quality assurance system and can operate effectively, and the construction drawing review is completed in time. The project quality assurance measures are formulated and followed up in time, and the overall quality of the project is good. Engineering quality control data, engineering safety and function test data are relatively complete and standardized.

3. The responsibility for production safety on the construction site has been put in place, and the management network for production safety has basically taken shape. Various special safety plans can be formulated and implemented in time, and the lifting equipment on the construction site has been put on record and is under construction, with a good level of civilized construction. No potential safety hazards were found during the inspection.

Fourth, the existing problems:

First, the project manager is not on duty in time. Second, the on-site records of supervisors are incomplete. Third, the supervision unit failed to carry out compulsory supervision on relevant safety production standards.

Verb (abbreviation for verb) Subsequent steps:

In the future, we should focus on four aspects of work. First, strictly implement capital construction procedures, further strengthen supervision and management services, and intensify inspections. The second is to strengthen the construction of honesty and standardize market behavior. Resolutely stop linking, subcontracting and illegal subcontracting. The third is to deepen the management of construction site and push the project quality management to a new level. The fourth is to comprehensively implement the comprehensive management of construction safety production. Really put the responsibility of production safety into every link, every post and every employee.

5. Building self-examination and self-correction report

In recent years, our city has launched a large number of national special investment construction projects, such as ecological migration, poverty alleviation migration, compulsory education, sand source control, returning farmland to forests, and grazing prohibition. With the national capital investment in our city increasing year by year, the concrete implementation of these projects has effectively accelerated the pace of infrastructure construction and poverty alleviation of farmers and herdsmen in our city. Ensuring the rational use of funds and the quality of the project is a major event related to the investment reputation of our city and the fundamental interests of the broad masses of the people. However, in some areas and departments, there are still some violations in the implementation of capital construction procedures, project quality, fund management and use. In this regard, governments at all levels, relevant departments and project units must attach great importance to it and strictly manage it from the perspective of safeguarding the fundamental interests of the country and farmers and herdsmen.

In order to strengthen project management, improve the quality of engineering construction and the efficiency of capital use, all counties and districts should conduct a strict and serious self-examination and self-correction of all construction projects. The relevant matters concerning self-examination and self-correction are hereby notified as follows:

First, the key content of self-examination and self-correction

(a) ecological migration and ex situ poverty alleviation relocation project.

(two) the compulsory education project and the renovation project of dangerous houses in primary and secondary schools.

(3) Returning farmland to forest (grass) project.

(4) Drinking water project for people and animals.

(5) Closing hillsides for grazing prohibition.

(6) Sand source control project.

(7) Other agriculture-related projects.

Second, self-examination and self-correction requirements

(a) mainly from the project's capital construction approval procedures, investment plan and fund allocation, funds in place and use, bidding, project progress and survival rate, etc., whether the project is strictly fulfilled, and whether it is completed in time and passed the acceptance as required; Whether there are unauthorized changes to the construction site and construction content, whether there are unauthorized expansion and contraction of the construction scale, whether the project quality meets the relevant standards, whether the project is used according to the specified purposes, whether the original accounting vouchers are complete, whether the financial accounts are clear, whether the project management fees are retained and used according to regulations, and so on.

(2) This self-examination and self-correction, the Qixian district government should organize relevant departments to strictly conduct self-examination on the project item by item, formulate rectification measures for the problems found in self-examination, and make rectification within a time limit. If the circumstances are serious, the relevant responsible person shall be investigated for responsibility. At the same time, combined with the implementation of rectification measures, strictly implement the project fund management system, fully implement the project material procurement system, strengthen the inspection discipline and accountability system, and resolutely put an end to violations in construction projects and fund management.

(III) All counties and districts must form a special report on the problems existing in self-examination and rectification measures before July 25th, and report it to the Municipal Supervision Bureau and the administrative office.

In order to do a good job in self-examination and self-correction, the municipal government decided that the Municipal Supervision Bureau would take the lead in organizing the Development and Reform Commission, Agriculture and Animal Husbandry Bureau, Education Bureau, Civil Affairs Bureau, Water Conservancy Bureau, Poverty Alleviation Office, Audit Bureau, Finance Bureau and other relevant units to conduct spot checks on the self-examination and rectification of counties and districts from August 2. Anyone who does not carefully check and rectify, leaving hidden dangers and causing serious consequences, once verified, will seriously investigate the responsibility of the relevant personnel and responsible persons.