Situation in the reservoir area of Datengxia Water Control Project

The investigation results of physical indicators of inundation in the protected reservoir area are as follows: 9882 people were affected by inundation; All kinds of houses cover an area of 355,000 m; Flooded all kinds of land 1 13693 mu, including 70566 mu of cultivated land, 9225 mu of garden land, 70 mu of woodland 19552 mu of grassland, 223 mu of fish pond and 7 mu of unused land. The second-class highway is 24.62km, and the third-class highway15.95km; : 220kV transmission line12.38km, 00kV transmission line165438+38.73km, etc.

The rural immigrants in the reservoir area adopt the initial resettlement plan based on large-scale agriculture and adjustment of cultivated land. The population to be relocated and resettled in the planning level year is 2035 1.

The project permanently covers an area of 4 1 19 mu, including 22 15 mu of cultivated land; Temporary construction area 17526 mu, including 4334 mu of cultivated land; The project covers an area of 4,050 people and the housing area is182,300 square meters. ..