What are the requirements for qualifications for water conservancy and hydropower projects?
What are the requirements for qualifications for water conservancy and hydropower projects? Water conservancy and hydropower management standards First-level qualification standards: 1. Corporate assets
Net assets of more than 100 million yuan.
2. Key personnel of the enterprise
(1) No less than 15 first-class registered construction engineers specializing in water conservancy and hydropower engineering.
(2) The technical person in charge has more than 10 years of experience in engineering construction technology management, and has a senior professional title in water conservancy and hydropower engineering related majors; there are no less than 60 people with intermediate or above professional titles in water conservancy and hydropower engineering related majors .
(3) There should be no less than 50 construction site management personnel holding job certificates, and there should be complete construction personnel, quality personnel, safety personnel, material personnel, and document personnel.
(4) There will be no less than 70 skilled workers at intermediate level or above who have passed the assessment or training.
3. Enterprise project performance
In the past 10 years, it has undertaken general construction contracting or main project contracting for 3 of the following 7 categories of projects, including at least 1 category 1 to 2. Category 3~5 at least 1, the project quality is qualified.
(1) Two reservoirs and hydropower station dams with a storage capacity of more than 50 million cubic meters and a dam height of more than 15 meters or a storage capacity of more than 10 million cubic meters and a dam height of more than 50 meters;
(2) 4 sluices with a gate flow of ≥500 cubic meters/second (excluding rubber dams, etc.);
(3) 2 hydropower stations with a total installed capacity of more than 100MW;
(4) 2 pumping stations with a total installed capacity of 5MW or more (or flow rate ≥ 25 cubic meters/second);
(5) Hole diameter ≥ 6 meters (or other types with equal cross-sectional area) and length 4 hydraulic tunnels ≥500 meters;
(6) Complete more than 500,000 cubic meters of hydraulic concrete pouring or more than 1.2 million cubic meters of dam body earth and stone filling or more than 120,000 meters of grouting or waterproofing completed annually. The seepage wall is more than 80,000 square meters;
(7) Water conservancy and hydropower projects with a single contract value of more than 100 million yuan.
Second-level qualification standards:
1. Corporate assets
Net assets of more than 40 million yuan.
2. Key personnel of the enterprise
(1) There should be no less than 15 registered construction engineers specializing in water conservancy and hydropower engineering, including no less than 6 first-class registered construction engineers.
(2) The technical person in charge has more than 8 years of experience in engineering construction technology management, and has a senior professional title in water conservancy and hydropower engineering or a first-level registered construction engineer qualification in water conservancy and hydropower engineering; water conservancy and hydropower engineering There should be no less than 30 people with intermediate professional titles or above in engineering-related majors.
(3) There should be no less than 30 construction site management personnel holding job certificates, and there should be complete construction personnel, quality personnel, safety personnel, materials personnel, document personnel, etc.
(4) There will be no less than 40 skilled workers above intermediate level who have passed the assessment or training.
3. Enterprise project performance
In the past 10 years, it has undertaken general construction contracting or main project contracting for 3 of the following 7 categories of projects, including at least 1 category 1 to 2. Category 3~5 at least 1, the project quality is qualified.
(1) Two reservoirs and hydropower station dams with a storage capacity of more than 5 million cubic meters and a dam height of more than 15 meters or a storage capacity of more than 100,000 cubic meters and a dam height of more than 30 meters;
(2) 4 sluices with a flow rate of 60 cubic meters/second (excluding rubber dams, etc.);
(3) 2 hydropower stations with a total installed capacity of more than 10MW;
(4) 2 pumping stations with a total installed capacity of 500KW (or flow rate ≥ 8 cubic meters/second);
(5) Hole diameter ≥ 4 meters (or other types with equal cross-sectional area) and length ≥ 3 200-meter hydraulic tunnels;
(6) Annual completion of more than 200,000 cubic meters of hydraulic concrete pouring or more than 600,000 cubic meters of dam body earthwork filling or more than 60,000 meters of grouting or anti-seepage The wall area is more than 40,000 square meters;
(7) Water conservancy and hydropower projects with a single contract value of more than 50 million yuan.
Level 3 qualification standards:
1. Corporate assets
Net assets of more than 8 million yuan.
2. Key personnel of the enterprise
(1) No less than 8 registered construction engineers specializing in water conservancy and hydropower engineering.
(2) The technical person in charge has more than 5 years of experience in engineering construction technology management, and has an intermediate professional title or above in water conservancy and hydropower engineering or a registered construction engineer qualification in water conservancy and hydropower engineering; water conservancy and hydropower engineering related There should be no less than 10 professionals with intermediate or above professional titles.
(3) There should be no less than 15 construction site management personnel holding job certificates, and there should be complete construction personnel, quality personnel, safety personnel, materials personnel, document personnel, etc.
(4) There should be no less than 20 skilled workers above intermediate level who have passed the assessment or training.
(5) The technical person in charge (or registered construction engineer) has presided over no less than 2 projects that have completed the requirements of Level 2 or above for this category of qualifications.
Scope of contracted projects:
Special-level enterprises:
1. Enterprises that have obtained special-level qualifications for general construction contracting can undertake general contracting and design of projects of all levels in this category and carry out general engineering contracting and project management business;
2. Obtain any one special-level construction general contracting qualification in housing construction, highways, railways, municipal utilities, ports and waterways, water conservancy and hydropower, and other majors and 2 of them With the first-level construction general contracting qualification, you can undertake the construction general contracting, project general contracting and project management business of the above-mentioned professional projects, and carry out construction drawing design business with corresponding design leading professionals.
3. Those who have obtained any one of the special-grade construction general contracting qualifications and two of the first-class construction general contracting qualifications in the majors of housing construction, mining, smelting, petrochemical industry, electric power, etc. can undertake the above-mentioned professional projects. It provides general construction contracting, general engineering contracting and project management services, as well as construction drawing design services with corresponding design leading professionals.
4. Enterprises with special qualifications are limited to housing construction projects with a single contract value of more than 60 million yuan.
First-level enterprises: can undertake the construction of various types of water conservancy and hydropower projects.
Second-level enterprises: can undertake the construction of water conservancy and hydropower projects below medium-sized projects and hydraulic structures below level 3, but the scale of the following projects is limited to the following range: dam height below 70 meters, The total installed capacity of the hydropower station is less than 150MW, the diameter of the hydraulic tunnel is less than 8 meters (or other types with equal cross-sectional area) and the length is less than 1,000 meters, and the embankment level is less than level 2.
Third-level enterprises: can undertake the construction of the following water conservancy and hydropower projects with a single contract value of less than 60 million yuan: small (1) and below water conservancy and hydropower projects and construction of hydraulic buildings below the building level 4 General contracting, but the following projects are limited to the following scope: dam height is less than 40 meters, total installed capacity of hydropower station is less than 20MW, total installed capacity of pumping station is less than 800KW, hydraulic tunnel diameter is less than 6 meters (or other types with equal cross-sectional area) And the length is less than 500 meters, and the embankment level is below level 3.
Note: 1. Water conservancy and hydropower projects refer to various types of projects (including supporting and ancillary projects) for the purpose of flood control, irrigation, power generation, water supply, waterlogging control, water environment management, etc. The main project contents include : Construction of hydraulic structures (dams, embankments, sluices, spillways, hydraulic tunnels, culverts and culverts, water intake buildings, river regulation buildings, canal systems, navigation, wood crossings, fish crossing buildings, foundation treatment) , hydropower station construction, water pump station construction, hydraulic machinery installation, hydraulic metal structure manufacturing and installation, electrical device installation, automated information systems, environmental protection project construction, soil and water conservation project construction, land consolidation project construction, and roads related to flood control and drought relief , bridges, communications, hydrology, well-drilling and other engineering construction, as well as the construction of management buildings and ancillary engineering related to the above-mentioned projects, etc. For details, please refer to the "Technical Terminology Standard for Water Conservancy and Hydropower Engineering" (SL26-2012).
2. The grade of water conservancy and hydropower projects is determined in accordance with the "Grading of Water Conservancy and Hydropower Projects and Flood Standards" (SL252-2000).
3. Professional titles related to water conservancy and hydropower engineering include water conservancy and hydropower engineering construction, water conservancy engineering construction, farmland water conservancy engineering, hydropower station power devices, power systems and automation, hydraulics and river dynamics, hydrology and water resources, Professional titles related to water conservancy and hydropower such as engineering geology, hydrogeology, water conservancy machinery, etc.
Professional contracting qualifications for water conservancy, hydropower and electrical installation projects are divided into level one, level two and level three. To apply for qualifications for the first time, you need to start with the third-level qualification, and you need to meet the qualification standards in terms of corporate funds and corporate personnel.
First, the company’s net assets must be more than 4 million yuan.
Second, the main personnel of the company meet the third-level qualification requirements for professional contracting of water conservancy, hydropower and electrical installation projects.
(1) The total number of registered construction engineers specializing in water conservancy and hydropower engineering and mechanical and electrical engineering shall be no less than 5, among which there shall be no less than 3 registered construction engineers specializing in water conservancy and hydropower engineering.
(2) The technical person in charge has more than 5 years of experience in engineering construction technology management, and has an intermediate professional title or above in water conservancy and hydropower engineering related majors or a registered construction engineer qualification in water conservancy and hydropower engineering; water turbines, water turbines There are no less than 8 people with intermediate or above professional titles in generators, electrical, welding, debugging, lifting and other majors, and they have a complete range of majors.
(3) There are no less than 10 construction site management personnel holding job certificates, and there are complete construction personnel, quality personnel, safety personnel, materials personnel, and document personnel.
(4) There should be no less than 15 skilled workers with intermediate-level or above qualifications who have passed the assessment or training.
(4) The technical person in charge (or registered construction engineer) has presided over and completed no less than 2 projects that meet the requirements of Level 2 or above for this category of qualifications.
The new qualification standard for water conservancy and hydropower has been combined with mechanical and electrical installation to become: professional contracting qualification for water conservancy, hydroelectric and electrical installation projects. Qualifications are divided into level one, level two and level three. Starting from Level 3:
Requires net assets of 4 million; 3 water conservancy and hydropower construction engineers and 2 mechanical and electrical engineering construction engineers. Level 2 builders available.
There are 8 intermediate engineers, and they are fully equipped in hydraulic turbine, hydraulic generator, electrical, welding, debugging, lifting and other majors.
On-site management personnel: 10 construction workers, quality workers, safety workers, material workers, and data workers. How to apply for the third-level qualification of water conservancy and hydropower projects
Water conservancy and hydropower qualifications are subject to dual-department approval. It is difficult to handle. To apply for qualifications, we are more specialized in handling the requirements for the third-level general contracting qualification of water conservancy and hydropower project construction
Qualification standards for general contracting of water conservancy and hydropower project construction
Third-level qualification standards
1 Corporate assets
Net assets of more than 8 million yuan.
2 Key personnel of the enterprise
(1) There should be no less than 8 registered construction engineers specializing in water conservancy and hydropower engineering.
(2) The technical person in charge has more than 5 years of experience in engineering construction technology management, and has an intermediate professional title or above in water conservancy and hydropower engineering or a registered construction engineer qualification in water conservancy and hydropower engineering; water conservancy and hydropower engineering related There should be no less than 10 people with professional intermediate or above professional titles.
(3) There should be no less than 15 construction site management personnel holding job certificates, and there should be complete construction personnel, quality personnel, safety personnel, materials personnel, document personnel, etc.
(4) There should be no less than 20 skilled workers above intermediate level who have passed the assessment or training.
(5) The technical person in charge (or registered construction engineer) has presided over and completed no less than 2 projects that meet the requirements of Level 2 or above for this category of qualifications. How to apply for the third-level qualification for water conservancy and hydropower project construction?
Main personnel of the enterprise:?
(1) There should be no less than 12 first-level registered construction engineers in the municipal public engineering profession. ?
(2) The technical person in charge has more than 10 years of experience in engineering construction technology management, and has a high-level professional title in municipal engineering related industries; there are no less than ? 30 people, with complete professional skills. ?
(3) There should be no less than 50 construction site management personnel holding job certificates, and there should be complete construction personnel, quality personnel, safety personnel, mechanics, cost personnel, labor personnel, etc.
(4) There will be no less than 150 skilled workers above intermediate level who have passed the assessment or training.
Henan Hanming is the first choice for Henan qualification agency! How to apply for the third-level water conservancy and hydropower engineering qualification?
Level 3 water conservancy and hydropower qualification standards:
1. Corporate assets
Net assets of more than 8 million yuan.
2. Key personnel of the enterprise
(1) There should be no less than 8 registered construction engineers specializing in water conservancy and hydropower engineering. (Affiliated personnel are looking for Sichuan New Direction)
(2) The technical person in charge has more than 5 years of experience in engineering construction technology management, and has an intermediate professional title or above in water conservancy and hydropower engineering related majors or a registered construction professional in water conservancy and hydropower engineering Qualification of practicing engineer; no less than 10 persons with intermediate professional titles or above in water conservancy and hydropower engineering related majors.
(3) There should be no less than 15 construction site management personnel holding job certificates, and there should be complete construction personnel, quality personnel, safety personnel, materials personnel, document personnel, etc.
(4) There should be no less than 20 skilled workers above intermediate level who have passed the assessment or training.
(5) The technical person in charge (or registered construction engineer) has presided over no less than 2 projects that have completed the requirements of Level 2 or above for this category of qualifications.
If you meet the above water conservancy and hydropower qualification standards, you can submit materials to apply for qualifications. The qualification agency can find Sichuan New Directions. You will know it by Baidu. We hope you will adopt it! How to apply for the second-level qualification for water conservancy and hydropower project construction
Second-level qualification standards
Enterprise assets: net assets of more than 40 million yuan.
Key personnel of the enterprise:
(1) There should be no less than 15 registered construction engineers specializing in water conservancy and hydropower engineering, including no less than 6 first-level registered construction engineers.
(2) The technical person in charge has more than 8 years of experience in technical management, and has a senior professional title in water conservancy and hydropower engineering or a first-level registered construction engineer qualification in water conservancy and hydropower engineering; water conservancy and hydropower engineering related There should be no less than 30 professionals with intermediate or above professional titles.
(3) There should be no less than 30 construction site management personnel holding job certificates, and there should be complete construction personnel, quality personnel, safety personnel, materials personnel, document personnel, etc.
(4) There will be no less than 40 skilled workers above intermediate level who have passed the assessment or training.
Enterprise project performance:
In the past 10 years, it has undertaken general construction contracting or main project contracting for 3 of the following 7 categories of projects, of which at least 1 category 1 to 2 category, 3 categories ~At least 1 category of 5, and the project quality is qualified.
(1) Two reservoirs and hydropower station dams with a storage capacity of more than 5 million cubic meters and a dam height of more than 15 meters or a storage capacity of more than 100,000 cubic meters and a dam height of more than 30 meters;
(2) 4 sluices with a flow rate of 60 cubic meters/second (excluding rubber dams, etc.);
(3) 2 hydropower stations with a total installed capacity of more than 10MW;
(4) 2 pumping stations with a total installed capacity of 500KW (or flow rate ≥ 8 cubic meters/second);
(5) Hole diameter ≥ 4 meters (or other types with equal cross-sectional area) and length ≥ 3 200-meter hydraulic tunnels;
(6) Complete hydraulic concrete pouring of more than 200,000 cubic meters or earth and rock filling of the dam body of more than 600,000 cubic meters or grouting of more than 60,000 meters or anti-seepage Walls of more than 40,000 square meters;
(7) Water conservancy and hydropower projects with a single contract value of more than 50 million yuan. What are the quality inspection devices for water conservancy and hydropower projects?
The quality inspection devices mainly include universal testing machines, sand and stone screens, slump cylinders, ring knives, balances, electronic scales, ovens, and woks. What are the information on water conservancy and hydropower project supervision?
List of audit materials provided by water conservancy supervision:
1. Qualification certificate of supervision unit (original or photocopy)
2. Establishment of supervision organization and on-site supervision personnel Files such as division of responsibilities;
3. On-site supervision personnel qualification certificates, job certificates, director qualification certificates and job certificates (original or photocopy);
4. Supervision planning and supervision implementation Detailed rules, supervision rules and regulations, etc.;
5. Commencement orders, supervision notices, monthly supervision reports, supervision briefings, supervision diaries and side station records, etc.;
7. Units and divisions Original data for project quality assessment (the construction unit inspection and supervision sampling inspection data should be provided);
8. Concealed project supervision station records, concealed project joint visa information;
9. Branch project acceptance visa and other information;
10. All project quantity visas and project payment information;
11. Unit price audit information for projects outside the contract;
12. All other supervision information related to project construction.
- Previous article:The beautiful hometown of the second grade composition is Miluo Yuchi Township.
- Next article:What's interesting about New Zealand?
- Related articles
- Brief introduction of Kaixian industrial park in Chongqing
- Method for estimating compensation amount
- Can I only go to Russia in Chinese?
- My uncle runs a company in Palau (a small continent controlled by the United States) and intends to take my account there. Then I asked our teacher a few days ago and said it was not very good. Yes
- Blind date needs immigration.
- Is it difficult to immigrate to Germany?
- Chengdu study abroad agency ranks in the top ten.
- Is Shan Hai Huang Qingxuan dubbing himself?
- Why didn't Jewish refugees in Shanghai need visas during World War II?
- The legend of Zuma Pavilion in Mill is wrong. How to get back to the fifth floor?