Job Recruitment Website - Immigration policy - Measures for the administration of water conservancy projects

Measures for the administration of water conservancy projects

(1) The management scope of dikes in river courses and flood detention areas starts from the toe of the dike, and the dike body is 5 meters to 2 meters.

0 meters, 10 meters to 30 meters outside the dike; The safety protection range is 50m to 100 outside the embankment foot.

rice.

The management scope of dike river course includes the waters between dikes on both sides of the strait and the beaches owned by the state.

The management scope of the dike and the land on both sides; The management scope of rivers without dikes shall be subject to the historical maximum flood.

Determination of water level or design flood level. The management scope of Fuyang River without dike in urban area is the river center.

30 meters to 40 meters on both sides of the line.

(two) the management scope of the reservoir area is the normal water level or the resettlement line or land acquisition around the reservoir.

The area below the line; The scope of safety protection is to check that the flood level line extends 20 meters up the hillside to 1.

00 meters.

The management scope of the dam is 30 meters to 300 meters at the downstream dam foot, and the left and right banks are excavation lines.

30 meters to 300 meters away; The safety protection range is100m to 300m outside the management scope.

.

The management scope of both sides of the discharge building and other buildings is 20 meters outside the outer line of the building.

To 50 meters; The safety protection range is100m to 200m beyond the management scope.

(three) the scope of management of dike channels is waters, ditches, dikes and

Canal protection land; The management scope of non-dike rivers includes waters, canal edges and canal protection land.

The protection scope of the canal is: from the toe of the outer dike to the outside with dike, and from the top of the canal without dike.

From the edge outward, the main canal is 2 to 5 meters, and the branch canal 1 to 2 meters; Channels with traffic demand,

The scope of management can be appropriately relaxed. The scope of safety protection is 20 meters to 50 meters outside the management scope.

(4) The management scope of the water conveyance tunnel is10m outside the outer line of the entrance and exit buildings and shafts.

To 30 meters; The safety protection scope is 50m to100m outside the management scope, on both sides of the roof.

(5) The management scope of sluice culvert, irrigation and drainage station and hydropower station is the edge of the building10m.

30 meters; The safety protection range is from 50m to100m beyond the management scope.

Article 7 Water conservancy projects shall be managed by the state, and the land and the attachments on the land within its scope shall be managed.

Belong to the whole people, the right to use belongs to the project management unit; Collectively owned land must be used.

Obey the unified management of water conservancy project management units; The ownership of the land within the scope of safety protection remains unchanged and continues to be used.

When shall not endanger the safety of water conservancy projects.

Eighth collectives and individuals approved by the water administrative department to build ponds, pools, irrigation and drainage.

Stations, canals, wells and other small water conservancy projects, by the township (town) people's government according to the actual needs, overall planning.

Set the scope of management and safety protection, and no unit or individual may occupy or destroy it without authorization.

Ninth in the construction of various buildings and facilities within the scope of water conservancy project management, the construction unit will

The project construction plan shall be submitted to the water administrative department for examination and approval before the capital construction can be examined and approved.

Continued, and by the water administrative department to participate in the construction supervision and acceptance. It is forbidden to breed within the scope of safety protection.

Building buildings and facilities that endanger the safety of water conservancy projects.

Tenth historical production and living facilities within the scope of water conservancy project management and

Other buildings in dangerous areas or seriously affecting the safety of water conservancy projects should be demolished within a time limit; Elsewhere

Section, should be combined with engineering transformation, urban construction and land development and utilization planning, by stages.

Except ... The specific implementation measures shall be formulated by the Municipal People's government.

Eleventh towns along the river in the preparation and review of urban construction and development planning, should be approved in advance.

Solicit the opinions of the river department. The utilization of river shoreline should be subject to river regulation planning.

Twelfth without the approval of the water administrative department, no unit or individual may change the river course without authorization.

Trend, not filling and occupying old rivers.

Thirteenth occupation of agricultural irrigation water sources, irrigation and drainage engineering facilities, should be compensated. exploit

Mining units or construction units that cause losses to water conservancy projects due to mineral deposits or underground projects.

Remedial measures should be taken to compensate for the loss.

Article 14 The development and utilization of reservoir water surface shall meet the needs of reservoir safety management.

Approved by the water administrative department and signed an agreement with the water conservancy project management unit.

Fifteenth rivers, dikes, dams, reservoirs, irrigation areas and other water conservancy projects and their construction.

, should obey the river basin and above urban water conservancy construction planning, in accordance with the classification management authority of water conservancy projects, strict

Implement approval, supervision and acceptance procedures.

Sixteenth county (city) and township (town) people's governments shall strengthen the construction of small-scale irrigation and water conservancy projects.

Facilities management, regular inspection, repair and maintenance, to ensure the needs of farmland irrigation and flood control and drainage.

Yes

Seventeenth to strengthen the management of wells, and gradually improve the protection facilities of wells. National and collective prosperity

Depreciation expenses shall be used for the maintenance and renewal of wells and shall not be misappropriated.

New wells must be uniformly planned and rationally laid out, and drilling construction units must hold "technical data".

Cross-examination ","construction permit "and" business license "shall be in accordance with the water administration of the people's governments at or above the county level.

Construction of water intake permit location approved by the competent department.

Eighteenth water supply management in accordance with the principle of unified deployment and hierarchical management, the implementation of planned water use.

Scientific water use, water conservation and paid water supply.

In case of flood and drought disasters, the water supply project management unit shall take emergency engineering measures and necessary measures.

Control means to ensure the basic water consumption of urban life and key enterprises, the increased cost, by the city

After the approval of the government, it shall be borne by the beneficiary unit.

Nineteenth city and county people's governments shall, according to the national flood control standards, formulate flood control plans for river basins.

Engineering conditions, formulate flood control plans, and the competent department of flood control projects shall formulate flood season dispatching and transportation plans.

Plans shall be reported to the people's government at a higher level and the competent department at a higher level for approval, and to the people's government at a higher level.

Flood control department for the record.

Management units of water conservancy projects and other flood control projects must strictly implement flood prevention plans and adjustment plans.

Use the pre-plan to organize pre-flood inspections of various flood control projects, and find problems that affect flood control safety.

Treatment within a time limit shall not delay flood control and flood fighting.

Water conservancy project management units shall use water storage workers under the premise of ensuring the safety of water conservancy projects in flood season.

The camera increases the water storage capacity.

Twentieth one of the following acts, by the water administrative department of the people's government at or above the county level

Shall be ordered to correct the illegal act, take remedial measures within a time limit, compensate for the losses, confiscate the illegal income, and

According to the seriousness of the case, a fine of 10000 yuan may be imposed; Violation of public security regulations, in accordance with

Regulations of the People's Republic of China on Administrative Penalties for Public Security; If the case constitutes a crime, it shall be investigated according to law.

Investigate criminal responsibility:

(a) the destruction of dikes, dams, hydropower stations, channels, culverts, wells and other water conservancy projects and

Its ancillary facilities;

(two) occupation, destruction of communications, flood reporting lines, stations, power supply facilities and other hydrological and

Engineering monitoring facilities, water conservancy materials and flood control equipment;

(3) Blasting, frying fish and burning kilns within the scope of water conservancy project management and safety protection.

, mining, quarrying, drilling, digging fish ponds and other acts endangering the safety of the project;

(four) unauthorized construction of water conveyance, water retaining and water storage projects in border rivers and canals, which damages the adjacent areas.

Interest project; Upstream dam break, sluice to expand drainage or increase water diversion, and downstream resistance.

Water may reduce the cross-section and water capacity of rivers and canals.

Twenty-first one of the following acts, by the water administrative department of the people's government at or above the county level

The door shall be ordered to correct the illegal act, remove obstacles within a time limit or take other remedial measures to compensate for the losses,

Confiscation of illegal income, according to the seriousness of the case, may impose a fine of 5000 yuan:

(a) the occupation of land and land attachments within the scope of water conservancy project management;

(2) Reclaiming land or building water-blocking structures at will in flood-flooded areas, flood discharge areas, flood storage and detention areas and reservoir areas.

Architecture;

(3) Reclaiming land on the floodplain without the approval of the water administrative department of the people's government at or above the county level.

Yes;

(four) moving slope protection gravel and deforestation and illegal felling of trees on dikes, dams and canal slopes;

(five) in rivers, canals, reservoirs and dikes, dams, slopes, embankments set up obstacles that hinder safety.

Management of buildings and obstacles;

(six) without the consent of the water administrative department of the people's government at or above the county level, in rivers, reservoirs,

Setting or expanding sewage outlets in ponds and other waters without authorization.

Twenty-second one of the following acts, by the water administrative department of the people's government at or above the county level

The door shall be ordered to correct the illegal acts, take remedial measures and compensate for the losses, and may be merged according to the seriousness of the case.

The fine shall not exceed 500 yuan;

(a) the construction of water blocking, harmful diversion, water diversion projects and planting water blocking projects in rivers and canals.

Of things or trees;

(2) Reclaiming, grazing and shoveling grass on dams and canal slopes, which is harmful to the project;

(three) vehicles that endanger the safety of the project and are overweight when driving on the dam crest, dam crest and sluice traffic bridge.

Driving tracked tractors, hard-wheeled vehicles and muddy vehicles after rain without the approval of the project management unit.

Twenty-third one of the following acts, by the water administrative department of the people's government at or above the county level

The door shall be ordered to correct the illegal acts, take remedial measures and compensate for the losses, and may be merged according to the seriousness of the case.

Warning, and impose a fine of 100 yuan to 1000 yuan; The relevant responsible personnel, by their units or

The competent department at a higher level shall give administrative sanctions; Violation of public security regulations, in accordance with the "China people * * * and

China's Regulations on Administrative Penalties for Public Security stipulates that:

(a) interception or occupation of water sources, disrupting the order of water supply and use;

(two) interfere with or obstruct the project management personnel to perform their duties;

(3) Non-engineering management personnel operate gates and various equipment.

Article 24 Those who dig sand and borrow soil within the management scope and safety protection scope of water conservancy projects,

The water administrative department of the people's government at or above the county level shall order it to correct the illegal act and take remedial measures within a time limit.

Measures, and can be fined according to the calculation of 20 yuan to 60 yuan per cubic meter.

Twenty-fifth dumping garbage, sand and slag into reservoirs, rivers, channels and flood discharge ditches.

Coal ash and tailings shall be ordered by the water administrative department of the people's government at or above the county level to be removed within a time limit.

And may be fined according to the calculation from 30 yuan to 70 yuan per cubic meter. If it is not cleared within the time limit, it shall be handled by the water administrative department.

The competent department shall organize the cleaning, and the responsible person shall bear all the cleaning expenses.