Job Recruitment Website - Immigration policy - 2021June 28th What hydropower station?
2021June 28th What hydropower station?
From March 20 1 1 year, migrant cadres at all levels sank into the front line of the storage area and took part in the resettlement work of Baihetan Hydropower Station, which lasted for1year and successfully completed the task in March 20021year, making an important contribution to the construction of a big country.
Geographical location:
Baihetan Hydropower Station is located in the lower reaches of Jinsha River, at the junction of Dazhai Town, Qiaojia County, Yunnan Province and ningnan county Town, Liangshan Yi Autonomous Prefecture, Sichuan Province. The upstream is connected with Wudongde cascade hydropower station, and the downstream tail water is connected with Xiluodu cascade hydropower station.
It is the second stage of the four-stage development of the lower reaches of Jinsha River (Yalong River mouth to Yibin), about 22 kilometers away from Ningnan County.
Reference to the above content: Baidu Encyclopedia-Baihetan Hydropower Station
- Previous article:What are the specific conditions for handling Shanghai hukou now?
- Next article:Immigrants do foreign trade.
- Related articles
- Brief introduction of Sucun township
- Xinmatai immigrants
- Which countries are the safest and cheapest to study abroad?
- Immigrants who quit the circle
- Projects invested by Li Ka-shing and Britain
- What are the latest immigration policies and conditions in Canada?
- Who are the famous horses in history?
- How to apply for an American green card? My sister is an American citizen and my mother holds a green card. How soon can I apply for a green card? I am married, over 2 1 year old.
- Is there a direct flight from Zhengzhou to Thailand at present?
- Let London children immigrate to school