Job Recruitment Website - Immigration policy - 2021June 28th What hydropower station?

2021June 28th What hydropower station?

Baihetan hydropower station. On June 28th, 20021year, the first unit of Baihetan Hydropower Station in Jinsha River was put into operation. At this moment, China people have been looking forward to it for more than 60 years. Behind this, countless builders have paid their lives and made selfless contributions; More than 50,000 immigrants from Yunnan reservoir area bid farewell to their former residences to support the construction of hydropower stations.

From March 20 1 1 year, migrant cadres at all levels sank into the front line of the storage area and took part in the resettlement work of Baihetan Hydropower Station, which lasted for1year and successfully completed the task in March 20021year, making an important contribution to the construction of a big country.

Geographical location:

Baihetan Hydropower Station is located in the lower reaches of Jinsha River, at the junction of Dazhai Town, Qiaojia County, Yunnan Province and ningnan county Town, Liangshan Yi Autonomous Prefecture, Sichuan Province. The upstream is connected with Wudongde cascade hydropower station, and the downstream tail water is connected with Xiluodu cascade hydropower station.

It is the second stage of the four-stage development of the lower reaches of Jinsha River (Yalong River mouth to Yibin), about 22 kilometers away from Ningnan County.

Reference to the above content: Baidu Encyclopedia-Baihetan Hydropower Station