The joint operation of Zaoshi Reservoir, Jiangya Reservoir (built) and Yichongqiao Reservoir (to be built), together with the overall flood control of Lishui River Basin, has raised the flood control standard in Song Li area below Shimen to once every 20 years in the near future, once every 50 years in the long term, and once every 50 years in areas above Shimen.
The survey and design work of Zaoshi Reservoir began in 1950s, from 1959 to 196 1 stop, and the project planning work was carried out again after 1998 flood. In 2000, the project proposal was approved by the state, and the project officially started in February 2004. In September of the same year, the river closure was successful, and in 2007.
- Previous article:Is Bruce Lee from China?
- Next article:What is Zhang's genealogy? Why does a generation have two words and a generation has three words?
- Related articles
- Welfare of Australian immigrants
- Hot mom movies that immigrate to the United States
- What are the rare surnames?
- How many years has Zhao Benshan quit CCTV? ,
- Wanzhou scenic spot
- What are the traditional settlements in Taiwan Province Province?
- How to get from Tangyin to Linzhou Hongqi Canal?
- Who are the celebrities from Shanghai University of Finance and Economics?
- Ni Ping and Ju Ping are two famous mouths in the same box. Although the age difference is not big, but the spirit is really different.
- How long does it take to express my passport?