Installation method of integrated ceiling 1. Screw installation:
1, according to the measured size, screw the expansion pipe screw into the brick hole on the ceiling, pay attention to the height between the ceiling and the roof not less than 25cm, the screw must be vertical to the ceiling, and fixed firmly, and the six screws remain parallel.
2. Punch holes in the ceiling at six points with an electric hammer (do not affect the installation of electrical appliances). Measure the distance from the top to the corner line, intercept the screw that is 8- 10cm shorter than the actual distance, while screwing a nut and an expansion screw (the screw is exposed by about 3 mm), and screw the nut on the other side, put on the main keel hanger and screw a nut to fix it.
3. Knock the joint between the expansion screw and the screw into the hole, connect the large ceiling with the screw with a diameter of 6mm, screw the nut into the screw, then insert the large hanger, screw the nut, and so on.
Installation method of integrated ceiling II. Keel installation:
1. Compare the sizes of each hanger, clamp the main keel on the hanger, cut out the required size, and keep the main keel parallel after clamping.
2. Put the triangular hanger into the triangular keel and fix it on the main keel in turn. Before fixing the triangular keels, adjust the distance between the keels to 300mm ... Arrange the exhaust pipe of the range hood in front of the gusset plate. If you don't have a range hood, you don't need it
3. The specific method is: subtract 5mm from the installation length, and then cut off the required triangular keel. After the triangular hanger is inserted into the triangular keel, the triangular hanger is stuck on the main keel. Pay attention to the same triangular keel hanger stuck on the main keel, and the clamping direction should be opposite, so that it will not swing when the installation continues.
Installation method 3 of integrated ceiling. Installation of gusset plate:
1. First, insert the connector into the fixed triangular keel, cut out the required length and insert it into the other end of the connector, and connect it by plug.
2. Install the gusset. First, lift the film on the four sides of the pinch plate and install it in the direction of the arrow on the film. The installation of the first row of gusset plates is generally cut with a utility knife, and attention should be paid to beauty and symmetry, with the cutting opening facing the wall.
3. Fix the cut gusset plate on the triangular keel, put the cutting surface on the edge strip, pull out the corners of the edge strip and fix the gusset plate. Take this as an example to install the first row of gusset plates.
4. Control the spacing of gusset plates in the first row, so that the spacing of gusset plates is 0, the four corners are cruciform, and the height of gusset plates should be consistent. The installation quality of the first gusset plate directly determines the installation quality of the rear gusset plate.
Installation method 4 of integrated ceiling. Electrical installation
1. Insert one side of the clamp spring into the round hole on the cabinet mounting clamp spring, and insert the machine screw into the round hole on the electrical cabinet and lock it. Put the box with clamp spring on the keel, press the open slots of the four clamp springs in turn, aim at the triangular keel, and lock the electrical box firmly on the triangular keel.
2. Next, open the junction box, connect it according to the corresponding function according to the wiring label, then install a switch to test whether it is electrified, and cover the junction box after it is electrified.
3. Finally, check whether the gusset plate is flat and whether the electrical appliances can be used normally. The installation of the integrated ceiling is basically completed here.
The above is the installation method of integrated ceiling brought by Bian Xiao. The whole content of integrated ceiling installation method.
- Related articles
- Which department is responsible for property management in Wuqing District?
- Is Zhengzhou Business Tourism Vocational College a junior college?
- Tianjin Shenghuinaqi Trading Co., Ltd. recruitment information, how about Tianjin Shenghuinaqi Trading Co., Ltd.?
- If you want to be an actor, you have to start with a walk-on, but how to find those audition opportunities? What are the main film and television bases?
- Street division in Wucheng District of Jinhua City
- Criteria for filing contract fraud
- How to charge for parking in Longgang 228 Industrial Zone?
- What is the current situation of Shenzhen Saiwei Company?
- Summary of subway and bus outage information during the Nanjing epidemic in July 221
- What school can I go to about 300 points in the senior high school entrance examination?