What are the procedures for building an aerated brick factory?

Aerated concrete blocks are made of fly ash, tailings, steel slag and waste machine-made sand. Aerated concrete block is a building material promoted by the government. Therefore, the approval procedure of aerated concrete block production enterprises is more convenient.

Aerated concrete block factory must first have the right to use the land, and the establishment of the factory is the establishment of an enterprise, which needs to be registered with the industrial and commercial bureau and the tax bureau and audited by the environmental protection department.

Our company (Zhengzhou Xinhai Machinery Manufacturing Co., Ltd.) is engaged in the manufacture of aerated concrete block production equipment, with an annual output of 200,000-300,000 cubic meters of complete equipment for aerated concrete block production.