Spider-Man exterior wall construction plan?

technical reserve

1. Spider-Man construction belongs to aerial work. When selecting construction workers, we should select young workers who are skilled, healthy, free from bad habits such as alcoholism and suffering from acrophobia, heart disease, hypertension and other diseases to undertake construction tasks such as cleaning and repairing external walls. 2. Before construction, carefully study the drawings, specifications and Party A's requirements, and ensure that the technicians and constructors are clear about the construction tasks and objectives.

3. Clean and surface treat the silo according to the drawing requirements. 3.3 Personnel Preparation In addition to the above-mentioned construction personnel, this project also needs the following personnel:

1. Technician: Familiar with construction drawings and construction specifications, with experience in quality inspection and acceptance of cleaning and repairing construction. 2. Safety supervision: responsible for supervising the inspection of material safety and the inspection of safety belts and safety ropes to ensure that this work is in a safe and controllable state.

3.4 Operating conditions

1, fasten the construction rope.

2. Before the formal construction, it is required to make a model wall according to the design requirements. After the quality is confirmed by the supervisor to meet the design requirements and construction specifications, large-scale construction can be carried out.

3. The environmental temperature of the construction site shall not be lower than 5℃, nor shall it be constructed in rainy days.