Job Recruitment Website - Job seeking and recruitment - Frequently asked questions in water supply and drainage interview
Frequently asked questions in water supply and drainage interview
Water supply and drainage science and engineering is one of the engineering disciplines, referred to as water supply and drainage. The following are the frequently asked questions of water supply and drainage interview that I sorted out, hoping to help you.
Frequently Asked Questions in Water Supply and Drainage Interview 1 Frequently Asked Questions in Water Supply and Drainage Interview:
Question 1: Why did you leave your present position?
A. Other colleagues think that I am the red man in front of the boss, so they crowd me out everywhere.
B: I'm disappointed with the result of salary adjustment, which is completely out of proportion to my efforts.
C. the boss is unwilling to authorize, and his work is limited everywhere, making it difficult to do things with one's hands tied.
D. the company's operating conditions are not good, and everyone is worried.
Answer: More than half of the personnel directors choose C, followed by D. The answer to C can show that the candidate is ambitious, capable and wants to be given more responsibilities. Choosing D is an objective external factor that individuals can't change because of resignation reasons. Therefore, the interviewer will not have too many doubts about personal abilities or worksheets.
Question 2: How much do you know about our company?
A. Your company was the king of stocks for eight months last year.
B. Your company has been selected as the first "enterprise that job seekers want to enter" by XX magazine for three consecutive years.
C. I'm not sure Can you give me some information?
D. Your company intends to change its strategy and strengthen OEM cooperation with foreign manufacturers, and the part of its own brand will go through overseas distributors.
Answer: Most of them are D for the simple reason. They want job seekers to have a real understanding of the job they are applying for, not just to come here.
Question 3: What is the most important consideration when you are looking for a job?
A. the company's vision and product competitiveness.
B. The company attaches importance to employee career planning and humanized management.
C. Whether the nature of work can make me develop my strengths and grow continuously.
D. the reasonable treatment and management style of the supervisor.
Answer: C is the majority, because the company is looking for people who have good work performance and can really contribute, not people who are purely interested in profit.
Question 4: Why should I admit you?
A. Because I am convinced that I am better than others.
Because I have a strong desire to grow with your company.
C. You can clearly see my all-out work attitude from the objective data presented by my past work performance.
D. I have worked in this industry for 8 years, and my rich contacts are my greatest wealth.
Answer: the ideal answer to this question is C. How do you let the other person see your goodness? It is difficult to convince each other by eloquence alone. Therefore, judging from the content of the resume or the previous answers, it is the most ideal answer if it can be supplemented by objective figures and specific work results.
Question 5: Please talk about your greatest personal characteristics.
A. I am very popular and have been a welfare committee member for three years in a row.
B. I have a high degree of persistence, and I will never give up until things have a satisfactory result.
C.i am very punctual. I have never been late since I started working.
D. I have an easy-going personality and am recognized as a good gentleman.
Answer: The ideal answer to this question is B. Although A, C and D all show the personal advantages of the applicant, only the advantages and characteristics that can best be combined with work and performance are the answers that the interviewer is interested in.
Question 6: "Please introduce yourself".
Thinking: 1, which is a required question in the interview.
2. The introduction content should be consistent with the resume.
3. Try to be colloquial in expression.
4. Go straight to the subject and don't say irrelevant and useless content.
5. The organization should be clear and the level should be clear. 6. It is best to recite it in the form of words in advance.
Question 7: "Tell me about your family"
Thinking: 1, the situation plays a certain role in understanding the personality, concept and mentality of the candidate, which is also the main reason why the recruiting unit asks this question.
2. Briefly list the family population.
3. Warm and harmonious family atmosphere should be emphasized.
It should be emphasized that parents attach importance to their education.
It is appropriate to emphasize the good condition of each family member.
It is appropriate to emphasize the support of family members for their work.
7. You should emphasize your sense of responsibility for your family.
Question 8: "Do you have any hobbies?"
Thinking: 1. Hobbies can reflect the personality, thoughts and mentality of candidates to a certain extent, which is also the main reason why employers ask this question.
It's best not to say that you have no hobbies.
Don't say that you have those vulgar and unpleasant hobbies.
4. It is best not to say that it is limited to reading, listening to music and surfing the Internet, otherwise the interviewer may suspect that the candidate is withdrawn.
It is best to have some outdoor hobbies to "embellish" your image.
Frequently asked questions in water supply and drainage interviews 2. General situation of the project
The construction unit of the Asian Games Source Building Project is Guangzhou Fu Bio-industry Development Co., Ltd.; The design unit is Guangzhou University Architectural Design and Research Institute; The supervision unit is Guangzhou Hi-Tech Engineering Consulting Co., Ltd.; The survey unit is Guangdong Geological and Architectural Engineering Survey Institute; The general contractor is Gina Group Limited. ..
The Asian Games Source Building project is located on the west side of South Asian Games Source Road, Panyu District, Guangzhou, with a total land area of 69,703 ㎡, which is divided into Phase I and Phase II. The main buildings in the first phase are 4 main buildings, 2 podium buildings and 1 basement. The land area is 33047㎡.
The ground elevation around the foundation pit of basement excavation is 6.60 ~ 8.30 m, and the excavation depth of foundation pit is
5.50m ~ 6.80m. The total area of foundation pit excavation is about 33 162m2, and the total length of foundation pit perimeter is 721m.. The north of the excavation site will occupy the second phase of land, and the west will occupy the site outside the red line.
Second, the site drainage conditions
1. On the east side of the site, the distance from the top line of the basement foundation pit slope to the fence is 1.5m, which can only be used as a safety guardrail and a pedestrian inspection passage, so it is impossible to arrange the site drainage ditch, and there is no reasonable rainwater outlet for municipal pipelines to discharge rainwater.
2. There are places where drainage ditches can be laid on the south, west and north sides of the site, but the west will occupy the site outside the red line and the north will occupy the land for the second phase.
The adjacent building red line in the south is Huamuchang, and the terrain elevation is 1~2m lower than that of the building site, so rainwater cannot be directly discharged.
The building line adjacent to the west is a vegetable field in the local countryside, and the terrain elevation is lower than that of the construction site.
1~2m, and rainwater cannot be directly discharged.
The north is the land for the second phase of the project, which can directly drain rainwater, but the drainage distance is long.
Three. Site drainage scheme
1, East Drainage Design
Set a drainage ditch between the fence of the construction site and Nanyuan Road. The drainage ditch is 400mm×300mm in size and adopts C 15 concrete structure. For details, please refer to the profile diagram of East Drainage Ditch.
The drainage ditch is about 500m long and drains from north to south. It is discharged into the south drainage ditch in the south and into the municipal rainwater pipeline of South Asian Games Road in the north to ensure that the site water does not flow into the first-phase foundation pit.
See the site drainage layout for details.
2. South drainage design
A drainage ditch shall be set at 2m from the top line of the foundation pit within the south fence. The size of the drainage ditch is 500mm×500mm, the bottom plate is C 15 concrete, and the side wall is brick. For details, please refer to the profile of South Drainage Ditch.
The length of the drainage ditch is about 175m, and it drains to the west, and then drains to the drainage ditch outside the site from the west to ensure that the site water in the first phase does not flow into the foundation pit.
See the site drainage layout for details.
3. Western drainage design
A drainage ditch shall be set at 2m of the top line of the foundation pit of the west fence. The size of the drainage ditch is 500mm×500mm, the bottom plate is C 15 concrete, and the side wall is brick.
For details, please refer to the sketch map of the west drainage ditch section. The length of the drainage ditch is about 208m, and it drains to the north, and then from the west drainage ditch to the drainage ditch outside the site, so as to ensure that the site water does not flow into the first-phase foundation pit.
See the site drainage layout for details.
4. North drainage design
On the north side of the concrete construction road, a drainage ditch is set at 6m from the top line of the foundation pit slope. The size of the drainage ditch is 600mm×500mm, the bottom plate is C 15 concrete, and the side wall is brick. For details, please refer to the schematic diagram of the north drainage ditch section.
The length of the drainage ditch is about 168m, and it drains to the west, and then to the drainage ditch outside the site, so as to ensure that the site water does not flow into the first-phase foundation pit.
See the site drainage layout for details.
Four. Offsite drainage scheme
East of the site is Nanyuan Road, a planned road. Without reasonable drainage pipes, rainwater cannot be directly discharged. South is the flower and wood field, with low terrain, and the rainwater cannot be discharged directly; There is a vegetable field in the local countryside in the west, and the rainwater cannot be drained directly. However, there is a permanent irrigation and drainage canal about 500 meters away from the construction site, and there is an irregular drainage ditch between the irrigation and drainage canal and the construction site, which can be rationally utilized through vegetable fields. The north is the land for the second phase of the project, and the rainwater can be directly discharged, but the terrain is higher and the drainage distance is longer, so there is no reasonable way out.
To sum up, according to the actual site topography and surrounding environment, the site drainage outlet is arranged on the west side, and the site water on the east, south and north sides is led to the west drainage ditch through the drainage ditch, and then to the permanent drainage ditch from the west drainage ditch.
On the basis of the original muddy drainage ditch, the excavator is used to dredge and reinforce the drainage ditch from the water outlet on the west side of the site to the permanent irrigation and drainage ditch, so as to ensure that the surrounding flowers and trees and farmland are not flooded by rain and avoid conflicts and disputes with local villagers.
;
- Related articles
- Present situation of Jianghan Oilfield
- What should college students do in summer vacation?
- How about Baoding Chiao Audi 4s store?
- Where is Ningyue East Garden in Songjiang, Qinzhou?
- Can I go to Dingbian County Fifth Primary School as a teacher after graduating from three schools?
- Is Dana Education Reliable? Is it true?/You don't say.
- Ask for the rest time of nurses in Anqing municipal hospital in day shift, early shift, big night shift and small night shift. thank you
- How about working in Caidian Grain and Noodle Industry?
- Is Shandong Haifeng's container ship very tired?
- What should I do if the electricity bill in Morph apartment is too expensive?