Job Recruitment Website - Job seeking and recruitment - Wanzhou Second high-speed railway station Planning

Wanzhou Second high-speed railway station Planning

Legal analysis: Wanzhou North Station has 3 sets of 7 lines, the building area of the station building is 14985 square meters, and the designed maximum gathering number is 3,000 people. At present, Wanzhou North Station is only connected with Chongqing-Wanzhou Intercity Railway and Zhengzhou-Wan High-speed Railway which will be opened soon. In the future, there will be a number of high-speed rail lines connected to Wanzhou North Station, and the existing three seven-line and1.5000 square meters station buildings are totally unsatisfied! Wanzhou North Station once planned to expand. The original design scale of the station building was only 6000 square meters, but it was later revised to1.5000 square meters.

Legal basis: Article 39 of People's Republic of China (PRC) Railway Law. After a railway is completed, it must pass the acceptance inspection in accordance with the national capital construction procedures before it can be delivered to the official operation.