I want to open a barreled water plant and a mineral water plant. What qualifications do I need?

First, start the water plant process.

1, provided that you have a plan for what you want to do.

2. Have sufficient funds.

3. Dig a deep well.

4, put into production water machine, filling and packaging equipment.

5. Buy a water truck.

6. Recruiting personnel.

Two, run a water plant must obtain the following "license"

1, "Production License", "SC Certification" (formerly known as "QS") Bureau of Quality and Technical Supervision.

2. Employee Health Certificate of Health Bureau.

You can apply for the following documents:

1, Business License of Administration for Industry and Commerce.

2. Tax Registration Certificate of the Inland Revenue Department.

Third, the factory building requirements

Based on the evaluation report of natural mineral water and pure water approved by the drinking water experts of the competent department and appraised by the geological and mineral departments, it is absolutely forbidden to blindly sign a contract to build a factory.

1. Never build a factory far away from water sources (wells or springs). The best solution is to keep the factory closest to the water source.

2. The scale of the factory should depend on the exploitable reserves of mineral water and purified water, the source of resources, the production capacity of pure water plant equipment and mineral water plant equipment and the degree of financial guarantee.

Fourth, the factory building decoration requirements

The scale of the workshop depends on the requirements of the workshop, but it must be based on the principle of making the workshop spacious and comfortable as far as possible while accommodating filling equipment. Generally, medium-sized enterprises are 20-50m long and10-15m wide. In this range, it is divided into bottle washing, filling and water treatment. Workshop requirements must be terrazzo clean dust-free floor, smooth drainage, no water, wall tiles, etc. The workshop should be closed and aluminum alloy doors and windows should be used. Cleaning, filling and sealing parts can be specially made into closed workshops.

Five, water plant equipment:

It must be a "RO" secondary reverse osmosis pure water production equipment approved by the relevant Ministry of Health.

1, water plant equipment can choose a little more pure water output (at least 2 tons/hour water production equipment, 150 barrels/hour barrel filling machine, barrel brushing machine, sealing machine, aseptic workshop).

2. The equipment for running a water supply station can be smaller (1 ton/hour, about 400 barrels/day).

Intransitive verb fund:

At least 65,438+00-65,438+05,000 yuan (excluding the factory building) should be set up as a water plant.

1. Go to the Industrial and Commercial Bureau to apply for a business license.

2, to the tax bureau for tax registration certificate.

3. Go to the Technical Supervision Bureau for the production license, that is, SC certification (formerly known as "QS").