Annual work summary of electromechanical workshop
The annual work summary of electromechanical workshop is 1 xx years. With the care of the factory leaders and the help of my colleagues, I successfully completed all the tasks. The summary is as follows:
First, personal ideological study and quality improvement.
In the first half of xx, under the circumstances of tight coal situation and national economic downturn, each of us' economic income and career expectations were affected to varying degrees. In the second half of the year, the coal situation suddenly improved and the pressure on production increased sharply. Such ups and downs are a good test for each of our young people who are rooted in the coal sea. Faced with such a test, I constantly adjust my mentality, learn advanced concepts and theories, learn the struggles of well-known enterprises such as Haier Group and Huawei, and establish the belief of being practical and steady and growing together with enterprises.
Be strict with yourself at work, persist in learning, be flexible and innovative, and always be close to where leaders and colleagues need it most. Participate in the economic and technological innovation training of employees organized by the group company, the quality improvement training of part-time teachers, and the teaching competition of full-time and part-time training teachers held by the center. , constantly improve their business and skills, based on the production site, the courage to think and innovate.
Second, the main work completed
(1) Training work
1. Complete all work arranged by superior departments and leaders in time. At the same time, according to the annual secondary training plan of the factory, * * * organized 23 lectures throughout the year, including 7 safety courses (mainly combining the risk and control management system, the training content covers system implementation, comprehensive emergency plan for safety production, special emergency plan, common sense of emergency rescue, hazard identification, risk pre-control knowledge, occupational health knowledge, fire safety knowledge and accidents). 5 other process technologies and 5 electrical technologies; 5 items of mechanical technology, special training for skill improvement 1 item.
2. Under the guidance of the competent leader, be responsible for the contact, implementation and arrangement of various training work in the factory, mainly including secondary training, employee out-of-town training, pre-job training, team training, etc. , and regularly update employee training files and various employee certificate ledgers. Flexible use of various training methods, active use of WeChat group, WeChat platform and other online self-media methods, organization of standardized workflow and other training work, so that our training work has been supported by employees and affirmed by leaders.
3. Actively participate in various activities organized by the Group and the Center to make a good start for employees, and won the third prize in the first teaching competition of full-time and part-time training teachers in the counterpart coal center held by the Center.
(1) mechanical and electrical engineering
1, responsible for the contact with superior departments in electromechanical aspects, and regularly reporting monthly maintenance plans, equipment three-rate reports, large spare parts and spare equipment reports, various maintenance applications, etc. , and do a good job of liaison between the leadership arrangement and the on-site maintenance of employees.
2. Make great efforts to do a good job in electromechanical foundation, update the production equipment account and standby equipment (bulky items) account under the guidance of the competent leader, recheck the number of factory maintenance personnel and equipment, formulate statistical summary tables of various main and auxiliary equipment, and design and establish the factory bearing (seal) account. Standardize the equipment inspection records, equipment planned maintenance records, chute inspection records, pressure vessel inspection records, equipment lubrication records and team material use records in the daily work of the locksmith team. Reorganized the technical files of major mechanical and electrical equipment.
2. For the key link in the production of one-throat equipment, it is necessary to sort out the standby situation of one-throat equipment and its main components in the production system again, and the competent leader and fitter monitor should cooperate with each other to standardize the storage and custody of large materials in the warehouse. Centralized cleaning of mechanical and electrical equipment warehouses, maintenance workshops and equipment storage sites (or temporary storage sites), and centralized identification by region according to types.
3. According to the maintenance plan of key equipment in the factory, the corresponding safety technical measures were compiled and implemented, and the scraper, chain, slideway and bottom horizontal medium tube of 308 shallow tank separator were replaced by locksmith maintenance personnel. 10 1, 343 belt conveyor belt replacement; Replace the exciter on the motor side of 307 desliming screen; 3 12: Replacement of filter screen of interface cylinder. 225-230, 826-83 1 coal feeder belt replacement; 30 1 Maintenance items such as replacement of reducer of raw coal belt conveyor.
4. In the technical transformation work, actively discuss the transformation scheme with leaders and colleagues, map and process drawings, and coordinate the transformation materials. We participated in the transformation of small belt chute and coal hopper grate in coal yard, the transformation of chute in front of 330/33 1 high frequency screen, the optimization of iron remover and unloading mode of gangue crushing system in lump coal yard, the transformation of belt conveyor driving part of lump coal products, the transformation of unloading point of 806 belt conveyor and the transformation of 852 lump coal loading hopper.
65438+ 10 May, August-June, participated in the preparation of material quota standard of coal blending center, and completed the comprehensive budget of material cost in the plant for 20** years. In addition, organize material plan and inventory count every quarter, grasp the reserve situation of production and maintenance materials, and analyze and compile the material quota data table of the branch factory regularly.
Third, deficiencies and improvements
1, personal professional level and work experience still have a lot of room for improvement. We should constantly learn new and old knowledge of the industry, learn from leaders and predecessors, and learn practical experience at the production site.
2. Facing the objective factors in my work, I lack the confidence to take the initiative to overcome and change. I will learn more from outstanding party member scholars in the future.
3. There is a lack of communication with leaders at work, so we should improve more in the future.
Fourth, the direction of efforts.
1, continue to improve all kinds of mechanical and electrical basic data such as technical data files of main equipment.
2. Learn the advanced functions of office tools such as excel, excavate efficient data processing methods in the office, make time, put more time into on-site maintenance and technical transformation, think positively and put forward more effective rationalization suggestions.
4. Assist leaders to arrange the implementation of planned maintenance projects;
5. Do a good job in contacting, arranging and implementing the specific work related to employee training, brainstorm and innovate training methods to make our training work better!
Annual Work Summary of No.2 Electromechanical Workshop Under the correct leadership of the company, Zishan Lake 12 project has been carried out in an orderly manner, and the following work summary is made on this year's design and electromechanical installation work.
I. Project Overview and XX Design Completion Workload:
1, project overview this year:
Projects under construction: 1, plot 5#, plot 6#, plot 2, shopping center, plot 3, Zishan Lake Hotel, plot 4, cable entering the ground.
Projects under construction: 1, Zihuwan Mansion, 2, Theme Shopping Area, 3, Clubhouse, 4, Tuanshan Road, 5, Huanhu Road, 6, Jiefang Road.
Finishing project: Jianingna Square
2, this year's design and construction design:
Remarks: The construction area under construction is 325,496.18m2; The total length of road construction is 5145.28 m; The designed construction area is 1648576.57 m2. ..
This year's Zishan Lake design (department) management design content:
Under the comprehensive organization of General Manager Zhang and Manager Fan, the main work is as follows:
1. Complete the master plan of Zishan Lake and the design management of detailed plans No.5 and No.6. The construction application has basically passed, and No.6 can be used for further design.
1. Complete the design and management of the regulatory detailed planning of Zishan Lake, and apply to the Planning Bureau for construction.
3. Complete the preliminary scheme of Zishan Lake sewage main pipe, which will be used for general layout control in the future and become the main drainage pipe of the land it passes through.
4. Complete the overall planning and design management of a-2# and 8#, and report to the Planning Bureau years ago.
5. Complete the planning and design of the shopping center and its construction drawing scheme, expand the initial design management, and complete the construction drawing design years later.
6. Complete the design modification and construction drawing change management of the theme shopping area.
5. Complete the planning and design of 5 mu of new land, and complete the management of construction drawing design.
6. Complete the fine decoration design of the clubhouse, and modify and manage the construction drawing design.
7. Complete the design and management of West Road.
8. Complete the planning and design of roads around the lake, and basically complete the management of construction drawing design.
9. Complete the preliminary scheme design and management of the general layout of the ecological park.
10, and completed the design and management of 1 10kv high-voltage line grounding.
1 1. Complete the design and management of 2# ground power supply line.
Second, the planning and design work:
1. Manage relevant units to complete surveying and mapping. The main contents are as follows: lofting, measuring and controlling lofting of roads around the lake; West side road setting-out, control setting-out, current earthwork mapping; Tuanshan Road controls the release point; Huziwan control point, line inspection, outdoor handover earthwork surveying and mapping, control points of additional projects (new villa, central garage, t 17, etc.). ); Inspection of control points and lines of shopping avenue; Shopping center surveying and mapping, lofting and so on.
2. Manage relevant units to complete geological exploration work such as preliminary survey, detailed survey and t 17 supplementary exploration of roads around the lake.
Third, the design site cooperation:
1. Command and arrange site changes, such as Zihuwan residence, Sanjiao road, shopping avenue and square sculpture.
2. Organize and manage the technical disclosure of start-up projects such as central garage, shopping avenue and Tuanshan Road.
3. Review the technical scheme of building engineering and its deepening design, such as deepening the details of residential doors and windows, intelligent weak current of residential buildings, etc.
4. Site design and technical guidance, such as the model room and its lobby.
Fourth, cooperation with various departments:
1. directly participate in and arrange personnel to cooperate with the strategic development department in the construction application, such as: the drawing review of shopping avenue, the expert review of shopping center, the fire protection application materials of Zihuwan, the construction application planning of 5 mu of land, etc.
2. Directly participate in and arrange personnel to cooperate with the marketing planning department for sales, such as: regional mapping of shopping malls, communication of various design schemes and design requirements, and 2 1 decoration scheme for the first floor of shopping malls and shops.
3. Cooperate with other departments of the company, such as: cooperate with the human resources department to recruit engineering personnel and answer questions about bidding technology and contract-related projects of property houses and supporting facilities.
Verb (abbreviation for verb) Installation in construction:
On-site installation in Huziwan is mainly yellow operation. Check the doubtful points, difficulties and key points of installation technology.
1. Draft, improve and review the technical tender for equipment, such as ground power supply equipment No.2, air conditioning equipment of the clubhouse, swimming pool equipment, etc.
2. Technical review of equipment contracts, such as elevators.
3. On-site technical guidance, such as the location and wiring of the smart home control box in Zihuwan, the problem of the on-site drainage pipe, the water and electricity in the shopping center, etc.
Six, internal organization and management:
1, formulate design management system.
2. Training new employees at work.
3. Strengthen team building and carry out collective activities.
The following aspects should be completed within XX years:
1. Design cooperation, on-site installation technical guidance and related work of Zihuwan residence, shopping avenue, shopping center, No.3 road, cable incoming line and No.6 site phase I project.
2. Complete the planning and design of plots a-2# and 8# and the construction drawing design of plot 8#, complete the planning of ecological park, and basically complete the main construction drawing design.
3. Improve and implement the design management system, and comprehensively manage the design progress, quality and investment.
4. Strengthen the training of Zishan Lake engineering (design) technicians.
Work and suggestions for future adjustment and improvement:
65438+ With the expansion of the project, there are more mailboxes, and many times of reimbursement can't play an effective role. Suggestion: the working capital of e-mail is XX yuan, which will be reimbursed regularly by the clerk.
2. In order to further improve the design management and comprehensively manage the progress, quality and investment, the current progress is directly managed by us, and the drawing review center conducts quality review on the specifications. This year, the control and management of design investment is not strong enough (contract control of design investment is ex post facto control). With the expansion of future projects, it is suggested that we find another design consulting agency with design quality and investment, and we will examine and approve this.
3. At present, there are general contracting units for surveying, mapping, exploration and construction. On the one hand, we reduced a lot of repetitive work such as signing contracts and increased the effectiveness of our work. On the other hand, its progress and quality have certain constraints (the other party thinks it is a monopoly). It is suggested to increase the general contracting of surveying and mapping exploration and increase our initiative. In addition, for the deepening of the design, the construction party can not complete it, and the design consulting agency can complete it.
4. According to the design contact situation this year, in order to reduce the contact between different projects and the same design institute, according to the strong matrix management mode, it is suggested that the design increase personnel (reported to the Human Resources Department), especially those who install technology in all directions. The personnel with professional management experience of Party A are becoming more and more important.
At present, the company's electromechanical installation is relatively backward in all aspects. Suggestions are as follows: ① Increase the management personnel of Party A with experience in site management of hydropower; (2) Establish a management system for mechanical and electrical equipment installation; (3) mechanical and electrical equipment installation equipment material plan and procurement plan.
- Related articles
- Why did Shanghai Bell Tianjin Branch change its name?
- What punishment decision did the CSRC make on the insider case of Hengkang Medical?
- How about Foshan Tu Mei Shoes Co., Ltd.
- What types of drawer slides are there?
- What is the work intensity of Guannan Rural Commercial Bank?
- May day activity plan
- Registration fee for recruitment of institutions in Wenshan Prefecture, Yunnan Province in 2023
- What does Zhucheng Kerry electronic male worker do?
- Is Guolian Securities a state-owned enterprise?
- How about Zhiyuan Plastic Products (Huizhou) Co., Ltd.?