Job Recruitment Website - Job seeking and recruitment - The consumption standard of construction projects in Hunan Province in 2006 shall be implemented, and the related expenses shall be calculated according to the documents after Xiang Jian Jia Price [20

The consumption standard of construction projects in Hunan Province in 2006 shall be implemented, and the related expenses shall be calculated according to the documents after Xiang Jian Jia Price [20

The consumption standard of construction projects in Hunan Province in 2006 shall be implemented, and the related expenses shall be calculated according to the documents after Xiang Jian Jia Price [2009] No.406. How to calculate this? Kneel and beg The quota budget of construction projects in Zhejiang Province (hereinafter referred to as "quota") is determined in the revision of 1994 and 1993 for the whole province to meet the needs of the development of socialist market economy and the dynamic management of project cost.

Secondly, there are two kinds of quotas:

Structural engineering in books

The second book decoration engineering

Thirdly, the fixed base price EDS is adopted according to the form and ease of use of control quantity, guiding price and "quantity and price" reform guide. Quantitative standard of quota part Our province has completed the benchmark price of labor, materials and construction machinery consumption of some unit products, and implemented the relevant provisions of unified benchmark price adjustment and dynamic management in the whole province.

The province's construction quota budget and benchmark price are based on the bidding quotation of construction enterprises. It is suitable for new construction and expansion projects of general industrial and civil buildings, but not for professional projects such as architecture, national defense, scientific research and other projects with special requirements.

Pricing does not apply to the prices of various building component products that have been implemented.

Compile fixed and universal construction projects, construction acceptance, quality evaluation standards and safety regulations. Under reasonable construction organization and normal construction conditions, unless otherwise specified in the context, they shall not be adjusted and fixed at will due to different operation methods.

, quota work content, briefly introduce the main process, the secondary process has not been listed, but it has been calculated as quota.

Ding Ajan is not included in the quota project: all the quotas are unified, supplemented by the regional quotas compiled by the local city (state) Ding Ajan Station, and approved as provincial-level construction; Before one-time use, the temporary quota operator (decision) shall, according to the design requirements, combine the actual situation and follow the principle of quota and one-time supplementary quota, prepare quota, pre-calculate, verify and audit and report to the local building for the record; Antique buildings in general construction projects can apply for provincial-level antique buildings and landscape engineering budget quota unit valuation table.

Nine. Description and regulation of fixed manual

Ergonomics quota is based on national unified labor quota 1985 and additional labor quota 1987. Considering the need to increase the direct labor range difference, the next book is about the unified national fixed budget for building decoration projects, and everyone works eight hours.

2. The labor quota includes the over-distance of materials, industrial circle, safety and quality inspection, and direct production labor such as temporary water and power cuts.

3. If the cost of operating machinery is offset by manpower instead of machinery, the fixed base price will remain unchanged.

4. The average daily salary is fixed at the unit price, and the whole album is calculated by 16.5 yuan, including basic salary, salary subsidies, wages of auxiliary production workers, employee welfare expenses and labor protection expenses of production workers.

10 directives and regulations on building materials, finished products and semi-finished products.

The budget price of material quota 1 is based on the budget price of building and installation materials in Zhejiang Province (1994), which is uniformly compiled and implemented in the whole province.

Ordered materials, finished products and semi-finished products are all qualified. Name, specification and affordable price of materials in Appendix (d).

3. Materials, finished products and semi-finished products, including on-site transportation loss and construction operation loss, loss rate appendix (III), off-site transportation loss and warehouse storage loss, have been included in the budget price of materials and will not be calculated separately.

4. Materials, finished products and semi-finished products, unless otherwise specified, include all awnings fixed in the on-site storage places or on-site processing places, as well as vertical transportation and horizontal building positions within 20 meters.

5, yellow sand hair; A certain proportion of expenses and loss blushing considered in the budget price quota of sand cushion concrete macadam materials shall not be increased in other ways when compiling the budget.

6, fixed leaching lime plaster 750 kg per cubic meter, lime unified stocking, unified implementation in the province.

7. Fixed wood types are classified as follows:

Category: Pinus densiflora, Pinus koraiensis and Pinus sylvestris var. mongolica.

Two types: white pine (cedar, Chinese fir), Chinese fir, poplar, willow and basswood.

Three categories: pine, Pinus ponderosa, Qiu Zi, Azadirachta indica, Pinus massoniana, Northeast Elm, Cypress, Catalpa bungeana,? Pineapple, Toona sinensis, nanmu, teak, camphor tree.

Four categories: Lycopodium, Oak (Oak), Ebony Sophora japonica, Masu (held by Quercus acutissima), Schima superba, Fraxinus mandshurica, Birch and Ulmus pumila.

8. The analysis quantity of tire wax semi-materials for secondary analysis materials, mortar and concrete (including the quantity of similar materials in the single fixed list) has been included in the basic price.

No.9 did not list the quota items of secondary sporadic materials, but were included in the application for other material fees, so the quota items were not adjusted.

1 1, about the establishment of mechanical machine-team quota.

1, fixed machinery machine-team, is the establishment of construction and installation 1985, the province unified labor quota and revised supplementary definition, and the work system every eight hours, which is different from other direct production machinery.

Clarify and standardize the normal construction and rational allocation of all kinds of construction machinery, combine the comprehensive consideration of machinery of construction enterprises in the whole province, and fix and adjust the quota at will instead of actually using machinery except the special requirements or fixed design specified by other regulations.

3. Unit price calculation of fixed machinery machine-team "The national unified construction machinery machine-team quota fee is 1994 and the provincial supplementary machinery machine-team quota fee is uniformly implemented in the whole province, but the fuel and electricity price difference fee is adjusted according to Articles 3 and 20 of this specification.

4. Fixed vertical transportation is based on the metal frame of crane with high eaves below 20 meters, in which the tower crane used for vertical transportation and the increased cost of vertical transportation of tower crane shall be calculated according to the following provisions:

For buildings with a eaves height of less than 20 meters, the added part is 4.0 yuan per square meter with a total construction area;

The awning of high-rise buildings exceeding 20m will be increased to per square meter 14.5 yuan. The increase of its ultra-high part cost, coupled with the increase of ultra-high construction cost.

The above-mentioned increased vertical transportation cost of tower crane does not include the walking workshop and demolition cost of tower crane, as well as the transportation cost and installation and demolition cost outside the tower crane yard, which should be calculated separately.

5. Fixed small-scale sporadic machinery and other machinery fees not listed shall not be fixed and adjusted.

12, extra-high construction cost increases.

The height of the eaves building is more than 20 meters, and the ultra-high part is increased according to the table.

The extra-high building area will increase the cost per 100 square meter.

Unit: (RMB)

Project building cornice height (m)

20? 30 20? 40 20? 50 20? 60 20? 70

Total 4383 5,548,651,680,398,870.

The vertical transportation fee increased by 1, 229, 174, 7 18, 262, 456 2597.

Scaffolding cost increased 1, 667, 20 1, 726, 243, 0 123403.

Other expenses increased 1 487,178,420,662, 5 172870.

continue

Unit: (RMB)

Project building cornice height (m)

20? 80 20? 90 20? 100 20? 1 10 20? 120

Total101021482126,031,378,614,879.

Increase the vertical transportation fee by 28143,516,394,344,464,859.

Scaffolding costs increased by 4126,451549,075,297,5690.

Other increased expenses 31623,451,375,340,434,330.

1, the height of the same super high-rise building is different, so it is necessary to apply for quota. This part should not be counted as part of the increase in ultra-high fees.

2, high-rise building area calculation

Peripheral horizontal area? The area above the foot? The exterior wall of high-rise building is a single-storey building with eaves more than 20 meters high and multi-storey buildings. The super-high part of the building height (the height of the first floor of outdoor ground design) exceeding 20 meters is calculated as the construction area.

3. The vertical plane of the scaffold enclosure structure has been included in the superelevation increase rate, and will not be calculated separately.

4. The vertical transportation of machinery increases the cost, including the given combination of various machinery. No matter what kind of machinery is adjusted during construction.

5. Extra-high mark-up fee for secondary decoration works shall be calculated separately.

13. The second moving expenses of building materials, and the increased amount of winter and rainy season expenses have been included in the fixed expenses and will not be calculated separately.

14, fix the cornice height at the high end of the building cornice, and evaluate the elevator machine room protruding the roof on the spot in the design room. Excluding the height between the attic and the roof water tank (but it can be calculated according to the area of high-rise building);

The floor of a building is the height of the first floor design (floor).

XV is fixed below, in which "XX" includes itself, including those marked with "XX" or "above XX" outside, excluding itself.

Fixed in the case of two or more factors or even multiplication.

Ding Ayuan is responsible for the interpretation and management of the quota construction in Zhejiang Province.

Rules for calculation of building area

First, calculate the scope of the building area.

Whether the height of a single-storey building is higher than the previous floor or not, its construction area is calculated. For single-storey buildings on some floors, the construction area shall be calculated according to the horizontal area above the external wall of the building.

2. The horizontal calculation area of a single-story building with associated span, when the high span straddles the city wall, the horizontal length above the footrest on the gable between its two ends is multiplied by the width of the outer line on the skirting board of the building area to cross the high level of the column; The horizontal width of the column except the high intersection line in the construction area is multiplied by the horizontal length between the two ends of the mountain on the upper foundation wall.

3. Multi-storey building, the sum of construction area and construction area, and the calculation of its basic peripheral horizontal area? What is the horizontal area of the external wall, second floor and above of the building? external wall

Basement, semi-basement, underground workshop, warehouse, shop, underground headquarters and corresponding construction area? Horizontal calculation of the external area of the entrance, the upper external wall lighting well, the moistureproof layer and its protective wall (excluding).

The height of the underground overhead floor of the deep foundation to be used exceeds 2.2 meters, and half of the horizontal area outside the overhead floor is calculated as the construction area.

As an overhead floor, the hanging feet of sloping buildings have a height of more than 2.2 meters, and the level of envelope area outside the building area shall prevail.

7. For buildings with empty passages, the foyer and foyer of the building, regardless of their height, should be calculated as one floor. Part of the hall, its horizontal projection area is? Building area.

8. Calculation of the stack area of the library.

9. In the elevator shaft, the natural layer well, garbage passage and oil well pipe of the extract are calculated according to the construction area.

10, horizontal area of stage lighting control room? The actual building area of the insulation layer of the envelope is multiplied by.

1 1 Building, if the height exceeds 2.2m, the construction area shall be calculated.

12 horizontal area of the periphery of platform column canopy column? Building area, half the area of independent column awning? Horizontal projection on the building area of the roof.

13, what is the horizontal area around the train shed, freight shed and website post? Building area, half of the horizontal projection area of single-row columns? Roof, independent column carport, cargo shed, on-site construction area.

14, the building envelope of stairwell, water tank, elevator machine room, calculate the area of the outer wall of the door bucket protruding from the wall.

15 The external wall area of the door hopper outside the protruding wall is the elevation calculated by the construction area.

16, closed balcony, corridor, building area, according to its own horizontal projection area. Concave balcony, half of the horizontal projection area of the balcony.

17, the horizontal area outside the column line of the building exterior wall, roof and column is calculated as the construction area. Pillarless corridors, eaves galleries, half of their projected area? Calculate the building area.

18? The projected area is the area of the corridor between two buildings and the ceiling overhead. Half the projected area of an overhead corridor without a roof? Building area.

19 projected area of each floor of the main passage of outdoor evacuation stairs? Building area, half of the total horizontal projection area of stairs outside the stairs.

20. The horizontal projection area of the overhead single-storey structure spanning other buildings is calculated according to the construction area and multi-storey. .

, do not calculate the scope of the construction area.

Components and accessories protruding outside the wall and decorative arts, such as columns, piles, horizontal bases and pillar-free awnings.

2. Maintenance, fire fighting and other outdoor stairs.

Figure 3? The technical floor is 2.2 meters high.

Structure, such as: independent chimney, flue, oil tank, water tower, oil storage tank (water), silo, silo, underground air defense dry production line.

5. Use the building space to carry out the internal and external construction of the operation platform, the feeding platform and the box-placing platform.

6. Roof water tank without enclosure structure. Curtains are hung in the background of the stage, the background overpass, and the platform is selected.

7. The independent room is located in a single-story control room, that is, a single-story room in the instrument room.

8-story underground overhead floor, the height is less than 2.2m, and the inclined building has an overhead floor with hanging feet.

Third, others.

According to the calculation of the construction area, except for the above circumstances, the light treatment in the above provisions shall be followed.

supplementary provision

First, calculate the scope of the building area.

1, using the roof space of the upstairs building, the highest point in the room (the ceiling at the end of the ceiling, the ceiling operator at the bottom of the purlin) is higher than 2.2 meters. What is the calculated area? A quarter of the area? External level.

2, the use of attic space flat-topped stairs, the first quarter area? Construction area of peripheral floors.

Three residential units, protruding roof, building envelope, single-slope staircase safety entrance, one quarter of the area in the peripheral wall, calculate the construction area grade.

4. Do shops and outdoor display their surrounding areas? Calculate the building area.

5. Choose stairs with open platform, and the construction area shall be calculated according to half of its horizontal projection area.

Outdoor platforms, feeding platforms, plant retaining walls and their surroundings? Calculate the building area.

7. Calculation of the construction area of supporting buildings located on one side of the natural floor between elevator shaft, industrial workshop and supporting buildings, extraction shaft and garbage pipeline supporting buildings.

Fences (such as police dog houses and pigsty) and single-storey houses with bicycle sheds, which are less than 2.2 meters high along the edge, shall be calculated as half of their peripheral area.

9. If the height of the bicycle parking garage of the first-floor multi-storey residential building is less than 2.2m, it shall be calculated as half of its peripheral area? .

10, choose the corridor at the bottom of the reservoir, choose the balcony platform, choose the corridor and choose half of the horizontal projection area of the balcony to calculate the construction area.

Do not calculate the building area range.

1, chimney and garbage chute are attached to the outer wall.

2. The elevation of underground corridor and platform is equivalent to the designed outdoor ground (the elevation difference is less than 10 cm).

3 outdoor metal fire escape or concrete cantilever flat step stairs.

4, through the street building downstairs, municipal buildings and public * * * channel.

The next book describes

Quota budget (hereinafter referred to as quota) mainly includes acid, heat, structures and twelfth building ancillary works according to the building structure.

Turnover materials are the amortization amount of fixed formwork and scaffolding listed.

The transportation cost in different places, the transfer of formwork and scaffold materials between stations in the same city, the maintenance cost of steel formwork library and the transportation cost of prestressed thick steel bars in different places have been included in the corresponding fixing, and will not be calculated separately.

, specific instructions and requirements,

1, fixed at the strength grade of concrete and the maximum particle size of crushed stone. The design and compilation of concrete strength grade are determined at the same time, and the maximum particle size of stone should be determined again without adjustment.

2. Considering the specific fine sand in the quota unit price department, 50%, the preparation of gravel concrete should be carried out uniformly in the whole province except Ningbo, Wenzhou and Zhoushan, with a fixed cement dosage and a concrete mixture ratio of 2.5%; Pebble concrete, the strength grade of concrete is above C 15 and C 15. Compared with the corresponding macadam concrete, the multiplication coefficient is 0.975, and the rest work is not easy to carry out.

The early strength agent for concrete members is mixed, and the quota has been taken into account, so it will not be calculated separately.

For concrete components, such as steam curing, the number of components that are actually steam cured in a factory prefabricated cubic meter of 4 1 yuan 90 kg (including coal), and the on-site steam curing fee is calculated according to the actual situation.

5. The calculation of precast concrete and reinforced concrete projects should be added to the net loss calculation of the construction drawing in the following table:

Table of precast loss rate of concrete and reinforced concrete

Component name production scrap rate

(%) Dynamic input, which can be superimposed.

Loss rate (%) Installation and piling

Loss rate (%) Total loss rate

(%)

Except all kinds of precast piles 0.2 0.8 0.5 1.5.

Precast reinforced concrete pile 0. 1.4

The calculation formula is as follows:

Net drawing of reinforced concrete precast concrete construction ×( 1+ total loss rate)

, steel, iron calculation rules and instructions

1, when fixing the reinforcement and embedded parts of concrete members, the budget and final accounts or benchmark price shall be adjusted according to the theoretical weight unit compared with the fixed content, and meet the following requirements.

The construction plan (including steel joints) plus the net loss of fixed prescription dose is used to calculate the construction drawings. The calculation formula is as follows:

Adjustment amount of steel bars and iron pieces = net consumption of construction drawings (1+ loss rate)-fixed amount (loss rate, see appendix 3).

Calculate the difference between rebar, rebar elongation and cold drawing processing cost.

At present, it is difficult to fix concrete members, regardless of embedded iron pieces. If the design needs to apply for fixing iron parts, it will change.

Template fixed iron sheet (refers to the amortization amount of template used for flat iron, iron tongs and steel pipes) has not been adjusted.

2. Provisions on the calculation of net construction drawing:

(1) The application components of standard atlas are calculated according to the amount of steel bars (ironware) in standard drawings;

(2) The length of reinforcement in the construction drawing is 25 mm on each side of the protective layer, and the steel hook of the wheel is added with 6.25D(d is the diameter of reinforcement, the same below);

(3) Strengthen the size of Sarah's length icon, and there is no separate circle construction scheme. If the vertical component of the floor is stipulated in the design, the price will be increased according to the natural layers, and Sarah;

(4) Without stirrup length, the section perimeter of the member with double-limb stirrup length, the stirrup length of two double-limb stirrup bars without hook on the same section, and the calculated hook of 44h2.7 billion members (width of height b of H member); Other stirrup tools are calculated according to the design length and hook;

(5) The length of the spindle, regardless of the increased length of each hypotenuse of the over-bending angle, the height (or thickness) of the beam is multiplied by 0.40;

(6) According to the design requirements and regulations, the thickness of steel plate per square meter of foundation slab reinforcement support is calculated as ×2 plus 1 m, and the length of wallboard ruler is calculated as ×2 plus 0. 1 0.25 square meter.

3. Considering the manual binding, welding and spot welding, the actual construction of reinforced joints, reinforced joints are not buckled, plus other expenses.

4. Except for the threaded round steel fixed on prestressed thick steel bars and low alloy steel, the rest are ordinary steel bars, cold-drawn steel wires and round steel. In fact, the fixed proportions are different, and they will remain the same. In the actual situation of steel grade, the fixation and propagation should be adjusted, not the prestressed steel wire. The price of low-alloy thread propagation thread round steel MINUS the price of low-alloy steel wire is low-alloy thread round steel, not round steel, and the unit price of low-alloy thread round steel MINUS the unit price of round steel is scattered all over the world. Adjust and strengthen the norm of quota price difference, and the ratio should be the price of cold-drawn steel wire and the processing fee of cold-drawn steel wire (per ton 150 USD), but excluding the processing loss of cold-drawn steel wire (3%).

5. Note 6 mm diameter round steel in the construction drawing. If the actual supply is 6.5 mm, the theoretical weight of 6.5 mm diameter round steel (purchased).

6, the theoretical weight of low alloy steel bar, calculated according to the actual amount.

Off-site transportation cost, demolition cost and crane track laying cost of large machinery are another item.

The cost of piling, hanging pillow and laying (or dike box) has been included in the quota and will not be calculated separately.

The fixed price is enclosed in square brackets: first, the incomplete benchmark price, benchmark price and priceless materials are enclosed in brackets; Secondly, the benchmark price, whether the benchmark price is enclosed in brackets, the material design and translation enclosed in brackets are different.