Job Recruitment Website - Job seeking and recruitment - What does a bidding expert do?

What does a bidding expert do?

The bid inviting Commissioner is the post personnel responsible for bidding and completing the bidding task.

Bidding refers to the behavior of bidders to submit bidding documents to the tenderer within the specified time limit at the invitation of the tenderer in accordance with the conditions stipulated in the tender announcement or tender sheet.

The job of a bidding expert is to bid. Its job responsibilities include:

Obtain the tender documents, carefully analyze and study the tender documents (on-the-spot investigation), and prepare the tender documents (typesetting, printing, copying, binding, sealing and stamping, etc.). ), submit the tender, participate in the bid opening, pay attention to the bid-winning results, and receive the bid-winning notice.

A tender is a valid quotation before the specified bid opening date or the preparation of the preliminary organization and implementation plan. The content must be very clear, including all the important contents that should be included in signing a contract with the tenderer after winning the bid. During the validity period, the bid shall not be withdrawn, the bid quotation changed or the bid content substantially modified.

Extended data:

Problems that the Bid Commissioner should pay attention to when submitting the tender:

1. Submit the tender on time. Article 28 of the Bidding Law stipulates that a bidder shall deliver the bid documents to the bidding place before the deadline for submission of bid documents. Tender documents delivered after the deadline for submission of tender documents required by the tender documents shall be rejected by the tenderer.

2. Submission of bid documents. The bidder must submit the bid documents within the specified time according to the place specified in the bidding documents. The best way to deliver the tender is to deliver it directly or through an agency, so as to obtain the receipt that the tendering agency has received the tender.

Tender documents usually contain the time and place of submission of tenders. A bidder shall not send the bidding documents to a place other than the place specified in the bidding documents. If the bidder delays the bidding time due to the wrong place to submit the tender, it will be regarded as invalid and rejected.

If mailing is adopted, the bidder must set aside mailing time to ensure that the bidding documents can reach the place designated by the tenderer before the deadline. Not "postmark". Bidding documents delivered after the deadline, that is, the bid validity period has passed, the tenderer shall return them intact and shall not enter the bid opening stage.

Baidu encyclopedia-bidding