Decoration subcontract contract
Decoration subcontracting contract template
With the strengthening of people’s legal awareness, the binding force of contracts on us cannot be ignored more and more. It is also the link to achieve professional cooperation. So do you know how to write a legal contract? Below is a sample decoration subcontracting contract that I compiled. You are welcome to share it.
Decoration Subcontract 1
Party A:
Party B:
In accordance with the "Contract Law of the People's Republic of China" , "Construction Law of the People's Republic of China" and other relevant laws, administrative regulations, the principles of voluntariness, fairness and good faith, both parties reached consensus on the construction project of this construction project and entered into this contract in order to keep their trust.
Article 1. Project Overview
1. Project name: Decoration project of the outpatient and inpatient complex of Kaijiang County Rehabilitation Hospital.
2. Project location: Jiushikan Community, Pu'an Town, Kaijiang County.
3. Engineering quantity: The engineering quantity marked on the drawings and determined through negotiation between both parties (the actual engineering quantity signed and certified by Party A when the engineering quantity changes).
4. Types and methods of subcontracting work: All that should be done shall be contracted without including materials.
Article 2. Construction period
1. Construction start date: 20xx year month day
2. Completion date: 20xx year month day
3. Total project time: 110 days
Article 3. List price
Article 4. Project quality
1. The decoration quality of this project is as follows: Decoration industry standards are enforced.
2. The acceptance criteria for all yin/yang angles are horizontal and vertical.
Article 5. Rights and Obligations of Party A and Party B
1. Rights and Obligations of Party A
1. Provide the construction conditions for the process and assist Party B to handle various construction procedures .
2. Party A is responsible for providing water and power sources for Party B’s use.
3. Party A is responsible for coordinating the relationship between the decorator and the neighbors; assisting Party B in on-site security, fire protection, garbage disposal, etc.
2. Rights and Obligations of Party B
1. Party B shall not subcontract the project to other construction units after signing the contract with Party A.
2. Complete the project as scheduled according to the construction period and quality.
3. Responsible for on-site fire prevention and safety responsibilities.
4. When the project is delivered, indoor and outdoor materials and garbage must be cleaned up.
Article 6. Civilized Construction
1. Construction materials should be stacked neatly.
2. Maintain on-site hygiene.
Article 7, Safe Construction
Party B shall provide safety education to its employees and construct in strict accordance with safe construction rules. If any safety accident occurs to Party B’s employees, the medical expenses shall be borne by Party B within 3,000 yuan. Party B shall be responsible for it, and Party B shall bear 30% of the excess amount above 3,000.
Article 8. Project acceptance
1. The project shall be based on the drawings provided by Party A and opinions confirmed on site, relevant construction specifications and Based on quality requirements.
2. For concealed project construction, Party B must notify Party A of stage acceptance and make acceptance records.
3. Two days before the completion of the project, Party B shall notify Party A for acceptance and sign for confirmation within 7 days after completion.
4. If the quality does not meet the requirements of Party A’s specifications, Party B will make additional repairs or repairs within the agreed period before accepting the product until it meets the requirements.
5. The final acceptance is the qualified completion period.
Article 9. Construction Period
1. If the construction period is delayed due to the following reasons, upon confirmation by Party A, the construction period will be postponed accordingly:
1. Changes in project quantity or Design changes;
2. Force majeure natural factors;
3. Other circumstances in which Party A agrees to postpone the construction period.
2. The construction period will not be postponed due to Party B’s failure to start work on schedule or stop work without reason; if there are problems with the project quality due to Party B’s fault, the rework costs and material costs will be borne by Party B, and the construction period will not be postponed.
Article 10. Responsibility for project delay
1. The construction period will be completed on time, and there will be no rewards or penalties if the qualified standards are met.
2. For every day the construction period is delayed, Party A will fine Party B 300 yuan per day.
3. The fine will be directly deducted from the completed project payment
Article 11. Payment method
1. 70% of the completed project amount per month % payment;
2. After passing the completion acceptance, 95% of the final settlement amount will be paid, and the remaining 5% will be used as a warranty deposit, which shall be paid within 7 working days after the expiration of the one-year warranty period.
3. Party B’s payment to employees must be subject to the supervision and control of Party A and the supervisor.
Article 12. Other Agreed Terms
Materials shall be used in a reasonable manner, and the loss shall not exceed 3%. The excess shall be borne by Party B.
Article 13. Liability for breach of contract
Party B of this contract pays Party A a contract performance deposit, which will take effect after both parties sign (the contract performance guarantee is in yuan, without interest) and neither party may change it without authorization. Or terminate the contract, otherwise the breaching party will pay the other party 3% of the project price as liquidated damages and bear the resulting economic losses; if Party B breaches the contract, Party A will not return the contract performance deposit to Party B; if Party A breaches the contract, Party A will unconditionally refund Party B the contract performance deposit Deposit; the contract performance deposit will be refunded to Party B (without interest) 7 working days after the project is completed and accepted.
1. Party A’s Responsibilities
If the project is not accepted and Party A uses it in advance and quality problems occur, Party A shall bear full responsibility, and Party B shall not bear any direct or indirect losses.
2. Party B’s Responsibilities
1. All construction workers must wear safety tools, and Party B will be solely responsible for any resulting safety accidents.
2. If the contract quality standards are not met, Party B shall pay Party A a liquidated damages of 3% of the price of the same project and be responsible for free repairs.
Article 14. Dispute Resolution Methods
If a dispute occurs, the two parties shall negotiate and resolve it first. If the negotiation fails, a lawsuit shall be filed with the arbitration committee or the people's court where the project is located.
Article 15
This contract will take effect after being signed by both parties. It is made in two copies, one for each Party A and Party B; the contract construction details and acceptance record form are attached.
Party A (official seal): _________
Legal representative (signature): _________
_______year____month____day
Party B (official seal): _________
Legal representative (signature): _________
______Decoration Subcontract 2 on _________month_____________
p>Party A:
Party B:
According to the "Contract Law of the People's Republic of China", "Construction Law of the People's Republic of China", " "Shandong Province Construction Market Management Regulations" and relevant laws and regulations, following the principles of equality, voluntariness, fairness and good faith, combined with the actual situation of this project, in order to clarify the responsibilities, rights and obligations of both parties, this document is entered into by Party A and Party B through consensus. contract.
Article 1 Project Overview
1.1 Project Name:
1.2 Project Location:
1.3 Contracting Scope and Content:
1.4 Contracting method:
Article 2 Contract Duration
Contract Duration: This project will start from 20XX to 20XX
Article 2 Quality
The quality level of this project is: qualified project, which meets the requirements of design and acceptance specifications.
Article 3 Contract Price Calculation Agreement
Article 4 Project Payment:
Proportion and Time
4.1 Payment upon entering the construction site
Article 5 Party A’s Work
5.1 Party A shall make a general explanation of the personnel entering the venue when Party B’s team enters the venue. The contents of the disclosure are:
a) The quality objectives, safety production and civilized construction objectives, and other creation objectives of this project;
b) Relevant management systems involving Party A’s on-site construction;
c) What is the relationship between this project and this project? Legal and regulatory requirements, technical standards, and specification requirements related to project construction;
d) Key procedures, special processes, important environmental factors, major hazard sources, and control requirements of this project.
5.2 Party A’s representative shall exercise the power of Party A’s representative and perform the duties of Party A’s representative in accordance with the provisions of this contract.
5.3 Representatives of Party A shall guide and urge Party B to organize construction in accordance with Party A’s standards for site management and fully comply with current national and local laws and regulations on environmental protection, occupational health and safety. Implement management standards such as construction organization design management requirements and on-site safety and civilization standardized management requirements formulated by Party A.
5.4 Party A shall organize Party B and the design unit to conduct relevant drawing review and design disclosure before the start of construction.
5.5 During the construction period, coordinate the relationship between Party B and other units.
Article 6 Party B’s Work
6.1 Party B shall organize the construction strictly in accordance with the construction drawings, construction plans and construction specifications to ensure the project quality, construction period, safety and civilization, and complete all tasks as agreed in the contract obligation.
6.2 Party B shall cooperate with Party A and the owner in all work according to Party A’s requirements. And responsible for construction site safety and security.
6.3 Comply with current national and local laws and regulations on environmental protection, occupational health and safety. Party B shall strictly control the impact of construction noise and dust on the surrounding environment during the construction process, organize the construction in accordance with Party A's current integrated management system procedures and documents, and assume the educational responsibility for Party B's employees, so as to achieve quality, environmental and environmental protection within the construction scope. Occupational health and safety goals (indicators) meet specified requirements.
6.4 Before the completed project is delivered to the owner, Party B is responsible for the protection of the finished product. If any damage occurs during this period, Party B will repair it at its own expense.
6.5 Clean the site in a timely manner.
6.6 If Party B causes project, property and personal injuries, Party B shall bear all the responsibilities and expenses incurred.
6.7 Handle the temporary residence procedures for local construction workers by themselves.
Article 7. Liability for breach of contract
Party B shall be responsible for all responsibilities caused by quality problems. Any material waste caused by man-made damage during construction shall be borne by Party B. Party A shall bear the consequences of failure to pay on time. Party A will bear the delay in the construction period and Party B's losses. For every day of delay in the construction period, a penalty of 5% of the total contract price will be deducted.
Article 8, other agreements
8.1 Submit to Party A and the construction party’s management and relevant regulations
8.2 The quotation for this project includes labor costs, machinery costs, Various expenses such as consumable expenses, temporary equipment expenses, various insurance premiums, living expenses, travel expenses, etc.
8.3 Matters not covered in this contract shall be resolved through negotiation between the two parties. If another agreement is reached, other means shall be adopted without affecting the progress of the project.
8.4 There are two original copies of this contract, with each party holding one copy.
8.5 This contract will come into effect upon signature by Party A and Party B.
8.6 This contract will automatically terminate upon completion.
8.7 The dispute between Party A and Party B shall be settled in Jinan City Court as stated in the law.
Party A (official seal): _________
Legal representative (signature): _________
_______year____month____day
Party B (official seal): _________
Legal representative (signature): _________
Decoration subcontract of _________year____month____day 3 p>
Party A:
Party B:
As agreed by both parties, the relevant projects in Party A’s project are now handed over to Party B for construction. The specific implementation is as follows:
1. Construction content:
2. Contracting method:
3. Contract period:
From XX, XX, XX to XX, XX XX day of month.
4. Labor payment method:
For each project, Party A pays Party B according to the project progress on the 5th of each month. The payment amount is 50% of the completed and accepted qualified project quantity. , after the customer has paid the settlement payment or within one month after the customer has passed the overall acceptance, Party A will pay 95% of the project price to Party B, and 5% will be paid to Party B after the one-year warranty expires.
5. Responsibilities of both parties:
1. Party A hires Party B to carry out the production and construction of the interior decoration project on a contract basis, and Party B organizes and manages the relevant production personnel, and Party B takes care of the production tools itself. , the specific construction content and unit price can be found in the "Team Labor Quotation Form". Party A will cooperate in providing the construction site surface to Party B.
2. Party B must comply with Party A's production and construction regulations during the production process. Rules and regulations, construction work specifications, acceptance specifications, and shall be managed by Party A’s personnel.
3. During the construction and production process, Party B must strictly follow the operating procedures for safe production and do a good job in fire safety. Smoking is strictly prohibited at the construction site. If there are work-related injuries or other injuries caused by violation of the operating procedures for safe production, Party B is fully responsible for safety accidents.
4. Party B is prohibited from having disputes with customers during the construction process, and must conduct civilized construction and treat customers politely. If there is a conflict with the customer for any reason, Party A has the right to change the construction team and the completed part will reach If the project is qualified, 70% of the total project price will be calculated. If a major dispute occurs and causes economic losses to Party A, Party B must bear financial responsibility.
5. During the construction period of Party B’s company, Party B and its employees will purchase their own personal and social insurance, and Party A is not responsible.
6. During construction, Party B’s team should take protective measures for its own and other teams’ products and materials. If the completed products, semi-finished products or materials cause pollution or loss due to failure to take protective measures, Party B will be responsible for Responsible for compensation.
7. Party B must abide by the "Project Quality Acceptance Standards and Process Requirements" and "Project Management Measures" set by Party A to carry out construction. If the quality acceptance requirements are not met or the project management measures are violated It shall be reworked unconditionally and losses caused by construction reasons or violation of project management measures shall be borne.
8. Party B must abide by the "On-site Construction Safety and Civilized Construction Management Rules" set by Party A, and organize workers to study carefully. If there is any violation of the corresponding management regulations, Party B will be punished according to the "Team and Group Agreement" signed by both parties. "Safe Construction Responsibility Letter" assumes its responsibility; if Party B fails to comply with the "On-site Construction Safety and Civilized Construction Management Rules" and causes corresponding safety accidents, Party B shall be responsible for it.
9. The projects constructed by Party B must pass Party A’s internal acceptance. Those that fail must be reworked until they meet the requirements, and Party A should be compensated for the material costs.
10. Party B shall be responsible for the construction progress of its team. If the construction period is delayed due to Party B's fault, Party B shall bear the loss and be fined 1,000 yuan per day.
11. If the construction content undertaken by Party B and the quality problems that occur during the warranty period specified by Party A belong to the construction technology, Party B shall rework it unconditionally.
12. The two parties will hold daily meetings to discuss improvements in various parts and cooperate with the construction site.
13. Unfinished matters shall be resolved through negotiation between the two parties.
Party A (official seal): _________
Legal representative (signature): _________
_______year____month____day
Party B (official seal): _________
Legal representative (signature): _________
_________year____month____day;
- Related articles
- How is the treatment of Huayou Cobalt in Tongxiang, Zhejiang Province going to Africa?
- Teachers' recruitment examination subjects and questions
- What about Luoyang Second Hospital of Traditional Chinese Medicine?
- Seven lessons shared by Zexi investment stock experts
- Beijing bus station tour guide treatment
- What about Nanyang Ceramic Network Technology Co., Ltd.?
- Why does Lin Qingxuan recruit shopping guides all the year round?
- Does the School of Management of Zhongnan University of Economics and Law have a quota for graduate students in Selected Graduates?
- Top Ten Good Cars in China.
- Beifu recruitment