Job Recruitment Website - Job seeking and recruitment - What procedures and certificates are needed to open a water plant?
What procedures and certificates are needed to open a water plant?
1. Process of opening a water plant
1. The prerequisite is to have a plan for what you want to do.
2. Have sufficient funds.
3. Drill deep wells.
4. Machines for water production and filling and packaging equipment.
5. Buy a car that delivers water.
6. Recruiting personnel.
2. To operate a water plant, you must obtain the following "licenses"
1. "Production License" and "SC Certification" (originally called "QS") from the Bureau of Quality and Technical Supervision.
2. "Employee Health Certificate" Health Bureau.
You can apply for the following documents:
1. "Business License" Industrial and Commercial Bureau.
2. "Tax Registration Certificate" tax bureau.
3. Factory building requirements
Evaluation reports of natural mineral water, pure water, etc. approved by the drinking water experts of the competent department and authenticated by the geological and mineral department will be used as the basis for feasibility assessment , must not blindly sign and blindly build factories.
1. Never build a factory far away from a water source (well, spring). The best solution is to keep the factory building and the water source as close as possible.
2. The size of the factory should depend on the mineable reserves of mineral water and purified water, resource sources, purified water plant equipment, mineral water plant equipment production capacity and financial guarantee, etc.
IV. Factory decoration requirements
The scale of the factory is based on the factory construction requirements, but it must be as spacious and comfortable as possible while accommodating filling and other equipment. Generally, medium-sized enterprises are 20-50 meters long and 10-15 meters wide. Within this range, different purposes are divided into bottle washing, filling, water treatment, etc. The requirements in the workshop must be clean and dust-free with terrazzo floors, smooth drainage, and no accumulation of water. The walls should be tiled, etc. The factory building should be airtight, and aluminum alloy doors and windows should be mostly used. The washing, filling and capping parts can be specially made into closed workshops.
5. Water plant equipment:
It must be "RO" secondary reverse osmosis pure water production equipment that has obtained the "water-related approval document" approved by the relevant Ministry of Health. Henan Wanda Environmental Protection Engineering Co., Ltd., water-related approval number (Yu) Wei Shui Zi (2014) No. 0066
1. Water plant equipment can be selected with a larger pure water output (at least 2 tons/hour) Water equipment, barrel filling machines with a capacity of more than 150 barrels/hour, barrel brushing machines, sealing machines, aseptic workshops).
2. The water supply station equipment can be smaller (1 ton/hour, about 400 barrels/day).
6. Funds:
A minimum of 100,000-150,000 yuan (excluding factory buildings) is required to run a water plant.
1. Go to the Industrial and Commercial Bureau to apply for a business license.
2. Go to the tax bureau to apply for a tax registration certificate.
3. Go to the Technical Supervision Bureau to apply for a production license, which is SC certification (originally called "QS").
7. Laboratory is indispensable
Quality inspection is an important part of the credibility of the company's product quality, if quality is the life of the company. Quality inspection is to check the microbial indicators. The specific indicators are the total number of bacteria, E. coli, etc.
- Previous article:Jinan Century Huaying School is far from Gildo.
- Next article:How long will it take for Yin Jian's physical examination to come out?
- Related articles
- Excuse me, is there a foreign pharmaceutical factory in Nanchang, Jiangxi?
- Where does Qianxi high-speed railway station register for recruitment?
- Tongchuan Vocational and Technical College 2023 Admission Line
- What's delicious in Caitang Square in Xiamen?
- Yiwu Longhui Racing Park Business Hours
- What happened to Zhenjiang accountant misappropriating 8.9 million reward female anchors?
- Where is the first loading and unloading vehicle in Guangzhou Hualong distribution station?
- Baoding Great Wall or Sailing Boat?
- Is Huaxin Experimental School in Fenghuang County, Xiangxi Private or Public?
- What grade is yogurt cow?