Cost of Leshan City New Bridge

Leshan Wutongchengnan Bridge was completed and opened to traffic on July 1, 2009. The bridge started construction in January 2008 and was completed on June 30, 2009. It has a total length of 258.8 meters and a width of 18 meters. The design load is highway level I (auto-super 20, trailer-120), two-way four lanes, and designed flood frequency. It is a once-in-a-hundred-year event, and the earthquake resistance is 7 degrees on the basic seismic intensity. The estimated total investment of the project is 17.6 million yuan, and the construction and installation cost of the project is more than 12 million yuan. It will be constructed by Sichuan Daxinxi Engineering Construction and Development Co., Ltd.