Job Recruitment Website - Job seeking and recruitment - What is the general process for home decoration? What should I pay attention to?
What is the general process for home decoration? What should I pay attention to?
What are the general decoration processes, and what matters should be paid attention to during decoration?
The decoration process is:
1. Preliminary design? --?2. Main body demolition and modification?--?3. Water and electricity renovation?--?4. Carpentry?--?5. Tiling?--?6. Painting the walls?--?7. Kitchen and bathroom ceilings ?--?8. Cabinet installation?--?9. Wooden door installation?--?10. Floor installation?--?11. Wallpaper laying?--?12. Radiator installation?--?13. Switch socket Installation?--?14. Lighting installation?--?15. Hardware and sanitary ware installation?--?--?16. Curtain rod installation?--?17. Development and cleaning?--?18. Furniture entry?-- ?19. Home appliance installation?--20. Home accessories decoration is generally completed according to these 20 steps.
1. Analysis of 20 links in the whole decoration process
(1) Preliminary design
It is also construction. The difference between humans and bees lies in the construction of bees. It is an instinctive reflection, and before people build, they will first form ideas and frameworks in their minds. Therefore, if home decoration is compared to a battle, then the early design of home decoration is the "battle plan" of this battle and the "soul link" of home decoration. Therefore, in the previous article "Made by Tang Liang", the whole article was about the issues that need to be paid attention to in the early design, so I won't repeat them here.
In the early design, one thing that must be done is to conduct a detailed measurement of your room. Don’t be lazy. It is best to measure it yourself. The measurement content mainly includes:
1. Clarify the area involved in the decoration process. Especially the tile area, wall paint area, wallpaper area, and floor area;
2. Clarify the main wall dimensions. Especially in the future, you need to design the wall dimensions for placing furniture.
Decorating many places is the same as being a human being - we may not necessarily understand it verbally, but we must know it in our hearts.
(2) Main body demolition and renovation
Entering the construction stage, the main body demolition and renovation is the first project, which mainly includes wall demolition, wall building, wall skin shoveling, and heating removal. , replace plastic steel windows, etc. To put it bluntly, the main body disassembly is to put up the framework of the construction site first.
(3) Water and electricity transformation
Before the water and electricity transformation, the dismantling and modification of the main structure should be basically completed. Between the two steps of water and electricity renovation and main body disassembly and renovation, some students may know that the first measurement of the cabinet should also be carried out. In fact, the so-called first measurement of the cabinet does not have any actual content, because the walls and floors have not been processed, and the cabinet designer cannot give specific design dimensions, but only the water inlets and range hood sockets reserved by the developer. location and make some relevant suggestions. Mainly include:
1. Check whether the position of the range hood socket affects the future installation of the range hood;
2. Check whether the location of the water meter is appropriate;
3. Check whether the location of the water outlet is convenient for installing the sink in the future.
For the first measurement of the cabinet, students with a little experience can complete it by themselves. After the waterway renovation is completed, it is best to make the bathroom waterproof immediately. Kitchens generally do not need to be waterproofed.
Some students have always believed that before the decoration begins, some main materials should be introduced in advance. What I want to say is that unless it is the main material required for the main body disassembly and renovation, the entry time of main materials such as ceramic tiles and large core boards should be after the water and electricity renovation. Because if the circuit modification involves grooves on the ground, and if the ceramic tiles and large core boards are not stacked properly, it will be very troublesome for workers to move them around. Two days ago, my classmate "Mouse" mentioned to me that her family had encountered the problem of workers coming and going all over the house to move bricks. I would like to remind students to pay attention.
(4) Carpentry
Carpenters, bricklayers and oil workers are the "three brothers" in the construction process. The basic order of appearance is: wood - tile - oil. The basic principle of playing is - whoever gets dirty goes first. "Who gets dirty first" is also one of the basic principles for determining the order of home decoration, which I will mention later.
In fact, carpentry work such as wrapping risers, making decorative ceilings, and plastering lines can also be considered as a detailed link in the main body disassembly and modification. It is not in itself related to the renovation of water circuits. Conflicts sometimes require some cooperation, such as what I mentioned in my last post - "If you plan to build a false wall at home, you should consider whether there are water and electricity lines on the false wall. If so, you should ask the water and electricity renovation workers to bury them in advance. "Manage it."
(5) Tiling
If the workers are busy, the foreman will usually ask the "second tile worker" before the "boss carpenter" has finished. It is normal to enter the site and lay tiles, because there is no conflict between the two.
The process of the "second bricklayer" operation also involves the installation of the following three links:
1. The installation of door stones and marble window sills. The installation of the door stone can be completed together with the floor tiles, or after the floor tiles are laid. The marble window sill is usually installed after the window casing is completed. The marble installation worker will prepare glass glue and seal the marble and window casing with glass glue. .
2. Installation of floor drain. The floor drain is the first to appear among home decoration hardware, because it must be installed in conjunction with the floor tiles. Therefore, when students start shopping for building materials, they should buy floor drains as soon as possible.
3. Installation of range hood. The range hood is the first home appliance to appear. After the kitchen wall and floor tiles are laid, you can consider installing the range hood.
After the "second bricklayer" leaves the scene, you can make an appointment for the second measurement of the cabinets. To be precise, after the kitchen wall and floor tiles are pasted and the range hood is installed, you can make an appointment for the second measurement of the cabinets. Measurement.
(6) Painting the wall
The "third oil worker" enters the scene, mainly completing the base treatment of the wall, painting the surface, and painting the furniture for the "carpenter boss" Paint work etc. Students who plan to put up wallpaper only need to ask "Oiler Lao San" to do the base treatment on the wall where they plan to put up wallpaper. As for whether to leave the last coat of topcoat on, I personally feel that this question does not need to be taken too seriously. Judging from my experience in decorating, leaving one coat of topcoat is not very meaningful, because the subsequent operations are not as dirty as painting. .
As I write this, I am trying to catch my breath and chat with everyone. When the "eldest", "second" and "third" leave one after another, many students will think that their decoration is almost over. In fact, if you count it by link, it is less than one-third. The reason why everyone feels this way is that people generally understand that decoration is only the "construction link" of decoration. In fact, the "installation link" of decoration is also the focus of decoration.
If the "design phase" is to "imagine" what our future home will look like, then the "construction phase" is to "package" our home. The real "purchase" of belongings is almost all in "Installation link". Take a drink of water and continue...
(7) Kitchen and Bathroom Suspended Ceilings
As the first step in the installation process, cabinet ceilings continue to "package" the home. While installing the ceiling in the kitchen and bathroom, the moisture-proof ceiling lamp and exhaust fan (bath heater) for the kitchen and bathroom should have been purchased. It is best for students to install the kitchen and bathroom ceiling lights and exhaust fans (bath heaters) at the same time, or leave threads and openings.
By the way, I firmly advocate the "decoration outsourcing theory", even if the foreman promised me that his workers would do the water and electricity renovation in a standardized manner, install the aluminum gusset plates in a regular manner, and make wooden doors. How strong it is, how professional the wallpaper is, how practical the cabinets are... In my opinion, all the decoration team can do is carpentry, tiling, and painting
Because I believe in professionalism The construction, the installation level of the manufacturer, and the products produced by the assembly line are generally slightly better than the workmanship of the decoration team workers. Decoration is like a game, where the bet is on the craftsmanship of the workers. Therefore, I feel uneasy when I bet on "my workers are construction geniuses."
The reason why many students let decoration companies and decoration teams undertake a large number of construction tasks is that on the one hand they do not have enough time, and on the other hand they consider the issue of "project connection". When I first decided to outsource the renovation of water and electricity, some neighbors reminded me that it would be very troublesome to connect it in the future.
In fact, every aspect of the decoration is very independent. I remember that a while ago on the forum, a student from the south raised a question, saying that the owner hired specialized workers to do every aspect of the decoration in his hometown.
Home decoration is such a small matter, and there really is no connection at all. Instead, students should try their best to play the so-called "connection role" in the home decoration process, accurately grasp the selection of materials, master some simple construction processes, and handle them well. Relations with workers and so on, that's the key.
Really speaking, there are problems due to "connection", such as who is responsible for the installation of sanitary ware, lamps, hardware and other aspects in the later stage. On the one hand, it depends on how you get along with the workers, and what happens in the end. No one wants to "control" you; on the other hand, when it comes to no one "controlling" you, I still say the same thing - "Since God invented money, there has been no problem that cannot be solved."
In decoration, quality always comes first, which is the main contradiction and the general principle. There are problems in some links due to "connection", which is a secondary contradiction. Students need to be cautious while preparing to make concessions on the main contradiction and on general principles because of secondary contradictions.
(8) Kitchen cabinet installation
After the ceiling installation is completed, you can make an appointment for door-to-door installation of the cabinets. If all goes well, it can be completed in one day. Also installed at the same time are the sink (which does not need to include water supply and drainage parts) and the gas stove. Before installing the cabinets, it is best to coordinate with the property management to vent the gas, because the gas stove needs to be tested after it is installed.
By the way, when I mentioned the suspended ceiling, there is a question worth discussing. Many students choose waterproof gypsum board with waterproof paint for kitchen and bathroom suspended ceilings. The decoration team’s quotation is generally more than 120 yuan per square meter, which is higher than ordinary aluminum Both gusset boards and PVC gusset board ceilings are expensive. The gypsum board ceiling looks relatively smooth visually, but if there is a problem with the water pipes on the top in the future, or if water leaks upstairs and needs to be repaired downstairs, the gypsum board ceiling will have to be dismantled as a whole, which is much more troublesome than a gusset ceiling. Therefore, everyone needs to be careful when choosing a gypsum board ceiling.
(9) Wooden door installation
On the second day of cabinet installation, after the measurement of the wooden door was completed more than a month ago, it is now possible to make an appointment for installation. If everything goes well, it will only take one day. When installing the door, you will need to install the hinges, door locks, and floor absorbers at the same time. Students should prepare relevant hardware in advance.
If you want the wooden door manufacturer to install window casings and openings, you should also measure them when the wooden door manufacturer measures them, and install them at the same time on the day the wooden door is installed. At the same time, you should consider setting the installation time of the marble window sill to the manufacturer. Wrong, it comes after the installation of window casings.
Remarks: The production cycle of wooden doors is generally one month. Therefore, in order to keep the construction period closely connected, the wooden door manufacturer must come to measure the door opening dimensions as soon as possible after the main body is dismantled and modified. Regarding the processing of door openings, everyone needs to pay attention to one thing. If the height of the door openings in your home is inconsistent, workers need to process them to the same height - which looks good.
(10) Floor installation
The floor can be installed on the second day after the wooden door is installed. If everything goes well, it will only take one day. You need to pay attention to the following issues when installing the floor:
1. Before installing the floor, it is best to ask the manufacturer to come and survey whether the ground needs to be leveled or partially leveled. Some decoration companies or renovation teams will recommend that students level the ground or level it. Local leveling shall be subject to the actual survey of the flooring manufacturer;
2. Before installing the floor, the floor of the home must be cleaned to ensure that the ground is dry, so do not use water during the cleaning process.
3. When installing the floor, if possible, the floor must be cut in the corridor. The forum has discussed this issue before. Some students thought it was unethical to cut the floor in the corridor to pollute the public area. My idea is to clean it up after I'm done, it doesn't matter. Cutting the floor indoors will cause serious pollution to the wall. Similar is the cutting of artificial stone countertops for cabinets. I believe that students who have renovated have experienced this.
(11) Laying wallpaper
On the second day of floor installation, once the house is clean, you can make an appointment to lay wallpaper. If everything goes well, it will also take one day. . If possible, the floor should be protected on the day the wallpaper is laid; if not, it doesn't matter. It's okay to leave the wallpaper glue left on the floor to Tuohuang Cleaning. Before laying wallpaper, try to keep "nothing on the wall" as much as possible.
(12) Radiator installation
On the second day after the wallpaper is laid, students who are replacing or dismantling the radiator can hang the radiator steadily. on the wall. It's also the same day.
Wooden door - floor - wallpaper - radiator, this is a generally recognized correct installation sequence. Installing the wooden door first is to ensure that the skirting line of the floor can be tightly connected with the door cover of the wooden door; The main reason behind installing wallpaper is because the floor installation is relatively dirty and dusty, which seriously pollutes the wallpaper. The principle of "who gets dirty first" is used here again. The radiator is installed last because the radiator cannot be installed until the wall wallpaper is laid.
The step-by-step decoration process is designed under various constraints and restricted conditions. There are occasional exceptions, such as Holtz doors that require the floor to be installed first and then the door, but such exceptions are rare during renovations.
In addition, I repeatedly said "one day", and I need to remind students that "one day" is not a long time for the entire decoration. Therefore, even if there are no installation conflicts, such as cabinets and For wooden doors, students should also try not to make two installation appointments at the same time in one day, especially for the "big items" mentioned above, because installation is very critical for these "big items" and it is best to focus on one site. , rather than "doing two things at once". We must learn to comfort ourselves - we will not miss that day.
(13) Installation of switches and sockets
There is only one reminder: students should have a detailed understanding of the number and location of switches and sockets in various rooms at home or Record, especially for students who put up wallpaper, sometimes the wallpaper workers are irresponsible and put the wallpaper on all at once, and they don’t use a wallpaper knife to mark the holes for your switches and sockets. Therefore, students still need to know what they are doing.
(14) Lighting installation
There is nothing to say about installing lights. After installing the lights, the home is brighter, saying goodbye to the dazzling glare of the 100-watt incandescent bulbs during the renovation - it feels good.
(15) Installation of hardware and sanitary ware
Install all the water pipes, bathroom accessories, toilets, clothes drying racks, etc. that you bought before. After the previous "big items" are installed, the home is still very "cold". After the lamps and hardware and sanitary ware are installed, the home becomes "alive", really "alive". It is no exaggeration to say that the first time you turn on the faucet and watch the water flow out, you will feel very beautiful; the first time you use the newly installed toilet at home, you will feel a sense of accomplishment, by the way. I also gave it a good name - "Virgo".
(16) Curtain rod installation
The installation of curtain rods marks the basic end of home decoration.
(17) Cleaning for pioneering and cleaning
Don’t install curtains before cleaning. Remember the post “Explanation of Curtains” reminded everyone. When cleaning the home, there should be no furniture or unnecessary appliances in the home, and try to keep as many "flat surfaces" as possible so that the home can be thoroughly cleaned.
(18) Furniture entry
As for the time to purchase furniture, my suggestion is that it should be after the renovation of water and electricity circuits is completed at the earliest. In this way, the basic size range of the furniture should be selected. We only have a rough idea. Therefore, some students have already rushed to order all the furniture before the decoration has started. Personally, I feel that it is not necessary.
(Nineteen) Home appliances are coming in
At this time, the home appliances are coming in, they are being installed, and they are ready to move in!
( 20) Home accessories
Home accessories are the last step of home decoration, and have changed from decoration to decoration, including the installation of curtains, which all belong to the home accessories link. As for buying curtains, it’s best to buy them after ordering furniture to avoid style conflicts. Home accessories also include buying some green plants, hanging wall paintings, displaying crafts, etc... In short, after moving in, you can play freely.
2. Two divisions of the decoration process
Students who have read the first section may find it a bit confusing. In order to facilitate everyone to further understand these 20 steps and some things that need to be paid attention to during the process. In this link, we are determined to add 10 more "stars" to the previous 20 "stars", as follows:
1 Go through the construction procedures - 2 Self-measurement - 3 Preliminary design ——4 Main body disassembly and modification——5 Wooden door manufacturer’s on-site measurement——6 Cabinet’s first measurement——7 Water and electricity renovation——8 Bathroom waterproofing——9 Main material introduction——10 Carpentry——11 Tiling (installation of window sill , floor drain) - 12 Installing the range hood - 13 The second measurement of the cabinet - 14 Painting the wall - 15 Kitchen and bathroom ceiling - 16 Gas connection - 17 Cabinet installation (installing the sink and gas stove at the same time) - 18 wooden door installation - 19 floor installation - 20 wallpaper laying - 21 radiator installation - 22 switch socket installation - 23 lamp installation - 24 hardware sanitary ware installation - 25 curtain rod installation - 26 pioneer cleaning - 27 Furniture entry - 28 Home appliance installation - 29 Home accessories - 30 Moving
(1) Four-step division of the whole decoration process
In rough terms, according to the final step in the article Divided into the 20 links mentioned at the beginning, the whole decoration process can be roughly divided into the following four links:
1. Design link; (1)
2. Construction link; ( 2-6)
3. Installation; (7-16)
4. Finishing. (17-20)
(2) Six-step division of the whole decoration process
According to the characteristics of the project and the 30 links just mentioned, the whole decoration process can also be divided into The following six steps:
The first step: design ideas; (3)
The second step: main body disassembly and modification; (4)
The third step : Concealed project; (7)
The fourth step: covering project; (10, 11, 14, 15, 19, 20)
The fifth step: installation phase; (17 , 18, 21, 22, 23, 24, 25)
Step 6: Closing stage. (26, 27, 28, 29, 30)
Specific instructions:
1. In order to be different from bees, we must first have a design idea;
2 , The main body was demolished and modified in order to completely turn the rough house into a construction site. The content of the main body demolition and renovation is just mentioned above - "wall demolition, wall building, wall shoveling, heating removal, plastic steel window replacement, etc.", as well as some carpentry work;
3. Concealed projects, It is equivalent to "medical surgery". Concealed projects must be done first, which is what everyone often says: "Renovation starts with water and electricity first";
4. Covering projects are like "clothing" the home. The carpentry of window casings and pass openings, the tiling of brickwork, the door stone, the installation of window sills, and the painting of oil workers - the three items of wood, tiles, and oil are basic projects. The subsequent gusset ceilings, floor paving, and wallpapering are completed. , even if the clothes are worn;
5. The installation stage mainly completes the realization of functionality. Including: cabinets, wooden doors, radiators, switches and sockets, lighting installation, hardware, sanitary ware, curtain rods... Each item has its own established function;
6. The closing stage, to put it bluntly, is Complete the factors that do not constitute "can move in".
Notes on decoration:
Notes
Generally, the gross profit margin of regular decoration companies accounts for about 10% to 20% of the total project cost. Some consumers cut a company's management fee to 5% of the total project cost. In order to maintain reasonable profits, the decoration company can only "cut corners" on material and labor costs. In the end, the victims are still the residents.
Before decorating, you must set aside enough time to complete the design, materials, inquiry and budget. The more complete the preparations in the early stage, the faster the decoration may be. When residents receive engineering drawings and quotations, they must read them carefully and pay attention to whether all the decoration projects you requested have been provided. For example, are there any curtains left out, a door missing, etc. Also pay attention to the later additions made by the decoration company.
One Hydropower
1. Waterproofing construction should use film waterproofing
2. Waterproofing projects should be done after the concealed engineering construction is completed and accepted
p>
3. After the waterproof construction is completed, two water storage tests must be carried out
4. The waterproof layer of the bathroom should be no less than 1.8 meters
5. Floor drain, Yin and yang corners, pipes and other places should be waterproofed once more
6. Use anti-odor floor drains
7. Hot and cold water pipes are hot on the left and cold on the right
8. Try not to run water pipes from the ground
9. Cold water pipes should have a 1CM protective layer in the wall, and hot water pipes should have a 1.5CM protective layer, so the grooves should be opened deep
10. When installing PPR pipes, you must consider the thickness of the ceramic tiles so that the pipes will not be exposed
11. It only takes a few minutes to cook, but it takes a long time to wash the dishes. You must buy a big water bucket
p>
12. The faucet and the basin must be matched, otherwise it will not be installed properly
13. Do not use cement for toilet installation, use silicone
14 ,? Pay attention to the protection after installing the toilet and faucet
15. When buying a toilet, you should consider the pit distance of the toilet
16. When washing a washing machine, you should consider whether it should drain up or down< /p>
17. It is best not to install a telephone in the bathroom, as it is easy to get damp
18. The size of the mirror in the bathroom must be considered first, otherwise the front light of the mirror will easily be installed too high
p>
19. It is best to leave manholes in bathroom pipes
20. Strong and weak currents cannot be put through the same pipe
21. Left zero and right Phase grounding
22. The power socket is 300MM from the ground and the switch is 1.4 meters
23. The switch should not be installed behind the door
24. There are many sockets Yishan
25. Use 16A sockets for high-power electrical appliances, such as electric ovens.
26. Use good cassettes
27. The cassettes must be It must be matched with the panel, otherwise it may not be installed
28. The cross-sectional area of ??the wires in the PVC wire tube must not exceed 40% of the cross-sectional area of ??the wire tube
29. The air conditioner in the bedroom should not Facing the bed
30. The air-conditioning hole should be tilted outwards, otherwise rainwater will come in
31. Try to consider dual controls for the lights
32. It is best to install a splash-proof socket in the bathroom
33. Consider a socket on the table
34. The wire trough should be horizontally and vertically arranged, so that it can be used conveniently in the future
p>
35. Check valves should be installed in public flues
36. Workers must read the instructions for purchased electrical appliances
37. Instructions and warranty Cards and other information must be kept well
Second Mason
38. Cement cannot be used after three months from the factory date
39. Different varieties, Cement with marked marks cannot be mixed
40. For yellow sand, river sand must be used. You will know the taste by tasting it with your mouth
41. Wall and floor tiles should be soaked in water for more than two hours and dried in the shade. Posted
42. It is better to buy more wall and floor tiles than less, otherwise color difference will easily occur
43. There cannot be two rows of non-full tiles on one wall
44. Clean the tiles immediately after wiping the seams
45. The floor should be covered with marble (light color), and the back of the stone should be waterproofed
46. The sun corners should be cut at a 45-degree angle
47. The floor tiles should be tilted towards the floor drain, otherwise water will accumulate easily
48. The wall tiles should be cut in a sleeve when they touch the pipe opening. , it still looks like a whole brick
49. The marble floor should be laid dry
50. The floor tiles must be stain-resistant and non-slip, not just for good looks
51. Matte tiles are difficult to clean
52. Pay attention to the drainage direction of balcony floor tiles
3. Carpentry
53. Floor keels are the most It is easy to dry larch
54. After buying large wooden boards, they must be sawed and air-dried
55. When carpenters enter the work, they must first draw the horizontal line of the house
56. As soon as the colorful panels come in, you need to buy paint and paint them to prevent them from being stained
57. Ceiling fans cannot be installed on the ceiling keels
p>
58. When constructing decorative panels, the color should be selected in advance
59. The distance between the hanging bars of the suspended ceiling should not be greater than 300 meters from the wall
60. Gypsum boards should be made of heavy Fix the head self-tapping screws into the board surface 1~2MM, and do anti-rust treatment. * nails cannot be used? 61. The distance between the nails of the gypsum board should not be greater than 200.
62. The gypsum board must be There should be a 3MM gap between the wall and the wall to facilitate anti-cracking treatment
63. It is best to use external angle strips to protect the external corners of the gypsum board
64. The upper and lower protruding parts of the wooden door should be Paint
65. The bottom of the bathroom door cover should be painted waterproof
66. The size of the door should be consistent
67. Try not to use furniture Let carpenters do it, but it won’t be done well
68. Try to buy integral cabinets. If the carpentry is not good, the design will not be good.
69. Each size must be considered. Okay, it will be more troublesome to modify it
70. Don’t make hidden tracks for the sliding door you make yourself, as it will not be repairable in the future
71. If the bathroom is small, try to make a sliding door. , don’t open the door and take up space
72. If you are not sure about carpentry work, you must communicate with the foreman more and never let them make their own decisions
73. Money is hard in the hand Reason
74. If there are children at home, use less glass
75. Make sure the workers read the drawings carefully
76. Kitchen drawers are very useful
77. The flatness of the wooden keel of the floor is 5MM
78. The rough floor should be laid at 30 degrees or 45 degrees, leaving 2~3MM between the boards, and the seams should be Staggered
79. A gap of 8~10MM should be left between the floor and the wall
80. When the length of the composite floor exceeds 8M, expansion joints should be considered
81. Try to use less medium-density board for door covers
82. Hinges and hardware must be used well
83. The bathroom heater should be installed on the wooden keel, not directly Installed on the suspended ceiling
4. Painter
84. Try not to add water when constructing medium and dark latex paint, otherwise color difference will easily occur
85 ,? A bandage should be applied to the joints of the gypsum boards
86. It is better to apply a cool cloth to the gaps in the wall
87 It is best to remove the putty on the wall. , or apply glue to seal it
88. Try to buy well-known brands of paint. Try not to use unknown paints recommended by the decoration company or foreman. 89. When the weather is too humid, do not apply paint
90. The polishing of paint and coatings should be done after it is completely dry
91. The next paint application must be done after the previous paint is completely dry
92 , The paint on the metal surface should be treated with anti-rust treatment
93. If the weather is too cold, the quality of the paint construction will be poor
94. When painting the door, use masking paper Stick to hinges and door locks
95. The weather is too hot, pay attention to ventilation
96. When pasting wallpaper, brush clear oil on the wall
97. When pasting wallpaper, you must remove the panels of switches and sockets
98. Glossy and mercerized latex paint must be finished in one go, as it is easy to cause color difference after touch-up
99. ?After the baseboards are installed, use putty and latex paint to repair the seams
100. Frosted glass should be protected with newspapers.
The above is the relevant content about the decoration process. I hope it can be helpful to everyone! Tubatu Decoration Network has high-quality materials, standardized processes, unified management, and has post-service guarantee services to make you feel at ease. , worry-free. Click the link below on this page to enjoy exclusive free home inspection, free design and quotation and other great value offers.
<<
Related reading: Demolition in house decoration Tips for main body demolition and renovation Tips for demolition and renovation of second-hand house structure Precautions for water and electricity renovation How to control the cost of water and electricity renovation in home decoration 12 preparations that should be done before laying ceramic tiles 5 issues that should be paid attention to when laying ceramic tiles Don’t be fooled into cutting corners when renovating a second-hand house. Things to note when decorating walls. Decorating novices must know the 6 major steps in painting! 300 pieces of common sense about decoration?
- Previous article:What about Xiangtan Zhengtianyuan Security Service Co., Ltd.?
- Next article:Where is Taiyuan Guangfa Securities?
- Related articles
- How about Hengyang Hongming Technology Co., Ltd.?
- Taicang Yuehua precision machinery parts, long day shift or double shift?
- Don't repeat unforgettable smiling composition.
- Introduction to Yangzhou Huaxing Medical Equipment Company
- What are the majors of Suzhou Industrial Park Vocational and Technical College?
- Shengfan electronic meter shows that sup tripped and returned to normal.
- Admissions telephone number of Guizhou Vocational and Technical College of Economics and Trade
- Chengdu Airlines booking hotlineChengdu Airlines booking hotline number
- How to Grind Tungsten Steel Circular Saw Blade
- What is the phone number of Yinchuan Evergrande Tianchen Dijing Marketing Center?