20 17 Annual Work Summary and Work Plan of Water Conservancy Bureau
XX two comprehensive agricultural development projects: sugar base construction and land management projects. The total investment is xxx million yuan, including: provincial xxx million yuan, municipal xx million yuan, county xx million yuan, self-raised xx million yuan, and labor xx million yuan. The project started on xx, xx, XX. It's all done.
(7) Dry land irrigation and water-saving irrigation projects
It is planned to complete three water-saving irrigation projects (Baijiagou in the ancient city of xx town, Shahe irrigation ditch in xx town and Renhe ditch in xx town). The total investment is xx million yuan. Among them: xx million yuan at the municipal level and X million yuan at the county level; At present, the project has been completely completed, accounting for 1, 0 1.2% of the planned amount, with a cumulative investment of xx million yuan, including xx million yuan at the municipal level, xx million yuan at the county level and XX million yuan contributed by the masses.
(eight) strive for the construction and reinforcement of the Monkey Reservoir.
* * The total initial design investment of Houjin Reservoir reinforcement project in County is xxx million yuan, including project investment, resettlement and environmental engineering investment. At present, the Engineering Construction Administration has been approved by the Municipal Water Conservancy Bureau. According to the relevant construction procedures, preparations are being made before construction, and the main project is expected to start construction this year.
(9) Regulation Project of Pingdian Town Section of Pingdian River
The regulation project of xxX town section in XX city is listed as a small and medium-sized river regulation project subsidized by the central special fund. It was approved and implemented by the Water Resources Department of XX Province [XX] No.7 document on February 2, XX, with a total investment of xxxx million yuan, including: the central special fund for small and medium-sized rivers management of xxx million yuan, the provincial subsidy of xxx million yuan, and the self-raised funds of cities and counties of xxx million yuan. . The design treatment length is 460 1.7m, the flood control standard is once every 20 years, and the flood control standard of temporary construction cofferdam is once every 5 years. The project will be implemented in three stages.
This is the third stage, which will be implemented at 823 meters above the roller dam of Qinglongkan Bridge in the ancient city section and 950 meters below the Maming Pumping Station in the Maming section. The length of the two sections is1773m. The two blocks were started on xx, xx, and the project was fully completed on xx, xx, with an investment of 92 1.98 million yuan, of which the direct cost of the project was xxx, and the compensation for land occupation was xx. Earthwork excavation is 67382m3, m7.5 mortar masonry 16937m3, embankment earthwork backfilling is 6119m3, temporary construction road is 3.7km, turf slope protection is 644 1 m2, and concrete precast pipe is purchased and installed for 825m. At present, the project is in the process of finishing the completion data, and strive for acceptance within XX years.
(10) Water administration and water resources management.
Make use of the publicity activities of "World Water Day" and "China Water Week" to carry out extensive and in-depth publicity activities on water laws and regulations throughout the county. * * * 40 people were dispatched for six times (times), and publicity funds of X million yuan were invested, 43 publicity posters were made, display boards 10 were made, and more than 5,000 publicity materials were distributed, reaching the township publicity area. At the same time, seriously organize the collection of water resources fees. At present, the * * * organization collects water resources fees of xx million yuan, accounting for 78.2% of the number of tasks of 165438+ 10,000 yuan.
(eleven) to carry out soil and water conservation work.
The comprehensive management has achieved initial results: the policy of "prevention first, overall planning, comprehensive prevention and control, adjusting measures to local conditions, strengthening management and paying attention to benefits" has been seriously implemented in the soil and water conservation work in our county. Comprehensive management takes small watersheds as a unit, implements comprehensive prevention and control of mountains, water, forests, fields and roads, and combines three major measures of biology, engineering and farming. According to the task of comprehensive management of soil and water conservation in * * county issued by xxxx Water Conservancy Bureau, the soil and water loss control area in * * county is 15.02 square kilometers up to now, including 445.7 hectares of soil and water conservation forest, 333.6 hectares of economic forest, 35.5 hectares of grass planting and 687.2 hectares of enclosure management. Seriously implement the "three simultaneities" system of soil and water conservation, and actively handle the relevant procedures of soil and water conservation. In XX years, 62 certificates of water and soil conservation plan were handled, 4 reports of water and soil conservation plan were examined and approved, and water and soil conservation facilities were accepted/kloc-0, and "two water and soil conservation fees" of 402,300 yuan were collected. It laid a good foundation for our county to implement ecological county.
(12) Drought Relief Work
Since the autumn of 20 17, the continuous high temperature and lack of rain in our county have led to a sharp drop in river runoff, a serious shortage of water storage in reservoirs and ponds, resulting in a once-in-a-century drought, which has caused serious losses to industrial and agricultural production in our county and seriously threatened a large number of rural drinking water for people and livestock. The county party committee and county people's government attached great importance to the drought relief work in our county, planned the drought relief work in advance, increased the investment of manpower, material resources and funds, focused on key points, paid close attention to key points, paid attention to practical results, and went all out to fight drought, thus achieving the overall goal of "Qi Xin cooperated in drought relief and tried every means to protect people from drinking water".
In 20 17, * * invested 62,000 drought-resistant personnel, 3 drought-resistant pumping stations 13, 2,200 sets of mobile drought-resistant equipment, 5,000 motorized water transport vehicles and 24 1.56 tons of drought-resistant oil; Xxxx million yuan has been invested in drought relief funds, including: xxx million yuan from the central government, xxx million yuan from the provincial government, xxx million yuan from the municipal government, xxx million yuan from the county government (including xx million yuan from the county water conservancy bureau), xx million yuan from the township government, xxx million yuan from the society (including xxx million yuan from party member, xxx million yuan from other units whose civil affairs and finance have not directly invested in the project) and XXX million yuan from the masses.
We implemented 2 water supply projects in county towns and market towns, 23 rural drinking water pipes or pools 123, 5 canal water damage projects, 54 well drilling or pumping station construction projects 10, 54 emergency repair projects for dry reservoirs and dams, 400 love water cellars in the Communist Party of China (CPC) and 300 hope water cellars in the Communist Youth League, and distributed subsidies for water transportation, oil transportation and pumping water and electricity. 65,438+020 drought-resistant pumps, 4,500 drought-resistant buckets, 260 water bags, 8 submersible pumps and 2 water trucks were purchased. The beneficiary population is 38,475 people, 65,438+0,665,438+0,005 large livestock.
(13) flood control work
Conscientiously implement the chief executive responsibility system, classification responsibility system, department responsibility system, technical personnel responsibility system and post responsibility system, and implement the responsibility level by level to projects, specific units (departments) and specific individual posts to ensure that the flood control work responsibilities are implemented.
According to the procedures of self-inspection by the management department and verification by the competent department, the county flood control and drought relief headquarters specially formed an inspection working group, which was divided into four groups of ***24 people and divided into three times (xx to xx in X, 1x to xx in X, and xx to XX in X) to conduct a comprehensive safety inspection of the county's rivers, projects under construction and reservoirs and dams. It is required to regularly rectify the existing reservoir dams, register dangerous reservoirs, and implement flood control measures to ensure the safety of reservoir dams in flood season. * * * 28 dangerous reservoirs1were found, including 2 small reservoirs (1), 2 small reservoirs (2)1,and 5 small dams 105; Two copies of the Notice of Rectification of Flood Control Safety Hidden Dangers were issued to the second-class highway construction headquarters from * * County to Sanjiangkou; Issue 13 river sand mining rectification notice; Signed two letters of responsibility for the prevention and control of geological disasters in projects under construction.
The emergency plan for flood control in * * County and Huangcaoba Reservoir has been revised successively; Revised the emergency plan for flood control and drought relief of * * County Water Conservancy Bureau and the flood control plan for small and medium-sized reservoirs; The emergency plan for flood control and flood fighting during the construction period of flood control project in xxx town section, the emergency plan for flood control in xxxx reservoir and the flood dispatching plan for xx reservoir in xx year were compiled.
In line with the principle of "being prepared is better than using it, and being unprepared cannot be used", we will effectively reserve flood control and emergency materials. * * We will reserve 140000 flood control bag, 1000 flood control rapid expansion bag, 100 life jacket, 50 raincoats, water shoes and umbrellas, and 65438+ flood control floodlights.
(fourteen) do a good job in fishery information statistics, and provide decision-making basis for serving agriculture, rural areas and farmers.
According to the schedule, in XX, the county * * * achieved 970 tons of fresh fish output, accounting for10/0% of 965 tons of tasks, producing 865,438+10,000 fish fry of all kinds, 6.5 tons of large-scale fish and 4,903 mu of various surface aquaculture areas.
(fifteen) the preliminary work.
At present, our county has won the bid for the reinforcement project of Monkey Reservoir, with an investment of nearly 5 million yuan, and the project construction management bureau has been approved by the Municipal Water Conservancy Bureau. According to the relevant construction procedures, preparations are being made before construction; Secondly, the preliminary work of a number of medium and small (I) and 1 1 small (II) reservoirs, such as Huangcaoba Reservoir, Ferramo Reservoir, Yangfacheng Reservoir, shihe reservoir Reservoir and Maanshan Reservoir, has been completed one after another. Most of the projects have passed the examination and will soon be approved for construction.
III. 20 18 Work Plan for Water Conservancy Construction
In 20 18, our county's water conservancy infrastructure construction plan completed 1850 water conservancy projects, including:11flood damage repair, 1509 channel annual repair, and two dangerous reservoirs reinforcement; 4 dry land irrigation and water-saving irrigation; River regulation 1 piece; Drinking water safety for people and livestock11; Township water supply 1 piece; Central investment in small-scale key county construction projects for irrigation and water conservancy 1 unit; Another 200 yuan. The irrigation area is 4,800 mu, including 2,500 mu of new effective irrigation area, 2,300 mu of middle and low yield fields, seepage prevention of main and branch canals 18 km, 3,850 people drinking water in rural areas, and 89 million cubic meters of water storage. Control soil erosion by 8 square kilometers, add 26,000 kilowatts of local power installed capacity, generate 3 1 10,000 kwh of electricity annually, produce 9 1 ton of fresh fish, and collect 800,000 yuan of water resources fee.
20 17 Annual Work Summary and 20 18 Work Plan III 20 17 With the correct leadership of the county party committee and the county government and the care and support of the superior business departments, our bureau closely focuses on the main tasks and objectives determined in the government work report, adheres to the guidance of Deng Xiaoping Theory and Theory of Three Represents, and takes the opportunity of maintaining the advanced education activities in party member. We will fully implement the water conservancy policy of the Party and the state and the idea of sustainable water control, focus on strengthening engineering construction, accelerating the pace of reform, changing the employment mechanism and creating good benefits, and vigorously push the water conservancy cause to a new level. Through the joint efforts of cadres and workers in the county's water conservancy front, a lot of work has been done in flood control and disaster relief, farmland water conservancy capital construction, water administration law enforcement, investment attraction, water pipe system reform and self-construction. The main work of the past year is summarized as follows.
Starting with the preparations before the flood season, we will comprehensively complete the task of flood control, drainage and drought relief.
(A) grasp the ideological preparation, strengthen the sense of responsibility
Flood control is a matter of xx days. After the flood last year, our bureau made every effort to organize water conservancy and flood control departments at all levels to vigorously carry out flood education, and adopted various forms to extensively carry out flood prevention publicity and education activities inside and outside the water conservancy system. At the same time, the spirit of the instructions on finger prevention at all levels was uploaded and issued in time, and the preparations for large-scale meetings such as the meeting of all members of the county flood control headquarters, the county flood control work conference and the county water conservancy work conference were completed successively, which laid a good foundation for the county party Committee and the county government to do a good job in flood control and disaster relief this year. Through the regular, long-term and specialized supervision of flood control work, the cadres and the masses have a high degree of unity in their ideological understanding of flood prevention, flood discharge and disaster resistance, and their sense of responsibility has been significantly enhanced.
(2) Do a good job in project preparation and improve flood control standards.
1, regulation project of bank collapse in Wencun, xx levee
On the afternoon of June 65438+1October 65438+March 3, xx levee Wencun section suffered a 350-meter-long major bank collapse at 733+750-734+ 100. After the accident, the county flood control headquarters quickly made an emergency report to the superior, which attracted the attention of provincial and municipal leaders and the county party Committee and government. Leaders at all levels visited the scene of the accident many times to check the danger and study and deploy emergency plans. On June 65438+1October 2 1 day, the county government established the emergency headquarters of Wencun Bank Collapse in xx County, and quickly organized the construction team to carry out emergency rescue. The emergency rescue project was officially started on June 65438+1October 2 1 day, and the main project was fully completed on April 30, with a total of 38372m3 of slope cutting earthwork, underwater riprap 14000m3, and 4423m3 of slurry block stone, with an actual investment of xxx million yuan.
2, XXX levee illegal drilling and plugging.
Upon inspection, there are 2038 illegal wells along the dike 1000m (including 5 1 well within 500m of the direct water retaining dike section and 855 wells within 500- 1000m; There are 706 wells (500 ~ 1000m 426 wells) within 500m of the non-berm section, and 126 wells are newly added (76 wells in the direct berm section and 50 wells in the non-berm section), which seriously affects the safety of xx levee in flood season. The main reason why it is difficult to block the mouth is that there is no drinking water source for people and animals after blocking the mouth. In view of the above situation, the county government convened relevant departments and relevant towns and villages to hold a special meeting on blocking illegal wells along the dike, registered the owner, location and purpose of each well in detail, set up a special blocking class to block 5 1 mouth of illegal wells in the direct water retaining dike section, and also formulated a temporary emergency flood control plan for illegal wells in the indirect water retaining dike section to reduce potential safety hazards caused by illegal wells along the dike.
3, xxx pump station and xx brake maintenance
There are 352 189 fixed power irrigation and drainage stations in the county, with a total installed capacity of 30,530 kilowatts. In order to ensure the normal disaster reduction benefits of pumping stations in flood season, our bureau conducted a general survey of the operation of electromechanical pumping stations in the county, formulated detailed maintenance plans for various problems existing in pumping stations, and organized special classes to implement them. This year, * * * invested 840,000 yuan to complete the maintenance task of 204 electromechanical pumping stations1kloc-0/8890 kw. In order to ensure the normal dispatching of dikes and irrigation resources in flood season, our bureau invested 640,000 yuan in maintenance, and carried out annual maintenance on 49 large and medium-sized culverts under county administration and 26 culverts under township administration according to regulations.
(3) Do a good job in material preparation and enhance support capabilities.
In order to do a good job in flood control material reserve and effectively enhance the flood control material support ability of our county, we first check all kinds of flood control materials and register them one by one to ensure that the accounts and materials are consistent. Second, flood control materials should be stored at designated places and kept by special personnel to prevent the loss of materials. According to statistics, our county reserves 967 12.87m3 of flood control sand and gravel this year. Among them, coarse sand is 22077.25m3, melon stone 13504m3, pebble is 27842.73m3, and boulder is 33288.89m3 The flood control equipment is equipped with 4 generators, 500 lanterns, 65 shovels, 654.38+065,000 woven bags, 654.38+0 tons of piping.
(4) Grasp the implementation of the responsibility system and strengthen the flood control team.
Carrying out responsibilities and strengthening teams are important guarantees to ensure flood control safety. According to the principle of scientific scheduling and reasonable arrangement, combined with local conditions, we issued the Responsibility System for Flood Control and Disaster Relief in jiangling county on X, X, X; On April 12, the division of labor between the commander and members of the county flood control, drainage and drought relief headquarters was completed, and the xx levee defense section was implemented according to the flood control chain responsibility system. The county has set up 9 flood control and rescue commandos with 3,000 members to deal with emergencies in local flood control areas. Set up three emergency mobile teams with members 1500, assemble and stand by according to the flood control orders of the whole city, and undertake the emergency task of using flood diversion areas. The county's 4,500 emergency commandos are organized according to the militia system, and the list of personnel is registered.
The first, second and third flood control lines lead the labor force to people. It has ensured that flood control staff at all levels will perform their duties in this year's Yangtze River flood control, step by step.
(five) adhere to both drought and drainage, to ensure the safety of food production.
This year, the rainfall in our county is obviously less and the weather continues to be hot. There are 465,438+0,000 mu of farmland in the county suffering from different degrees of drought. In order to alleviate the drought and ensure the safety of grain production in the county, under the unified leadership of the county party Committee and the county government, our bureau regards drought relief as the top priority. First, the drought relief headquarters of Guannongji and Yanjiatai were established to strengthen the organization and leadership of drought relief work; Second, earnestly implement the drought prevention plan, and scientifically dispatch and rationally allocate water resources according to the principle of "downstream first, upstream later, and upstream taking care of downstream". According to statistics, during the spring drought, Kannonji and Yanjiatai Spring Irrigation Stations started 288 hours, pumping 8.898 million cubic meters. In order to ensure the water supply for farmland in flood season, this year, two sluices on the Yangtze River * * * diverted 2,7021.31.435 square meters, including: Kannongji 15077.8 1.435 square meters and Yanjiatai1/kloc. It has basically guaranteed the normal irrigation of 564,900 mu of farmland in the county and won a comprehensive victory in the drought-resistant struggle this year.
Since the rainy season, the temporal and spatial distribution of rainfall in our county has followed people's wishes, and no major waterlogging disaster has occurred. However, we didn't let our guard down because of this. We always prepared for "preventing floods and disasters", overcame the bad tendency of taking things lightly, and earnestly did a good job in the inspection and maintenance of electromechanical pumping stations, which laid a solid foundation for the comprehensive completion of the drainage task.
I recommend it carefully.
- Previous article:What about Xiangyang Yiyou Food Factory?
- Next article:How about Foshan Yongxiang Rubber Raw Materials Co., Ltd.
- Related articles
- From porter to brother Jiangsu Satellite TV, why did Morphy, who hosted 18, suddenly disappear?
- How about Bali Street Primary School in Guilin?
- Yunnan Communications Vocational and Technical College numerical control technology single stroke score line
- Where can I take the welder's operation certificate in Ningbo?
- Is Tianshan Aluminum a listed company?
- How about Xinxiang Puhua Clothing Factory?
- Fushun Yucheng Middle School, Huayuan Middle School, Xinxing Middle School, Lizhi Middle School, the time of going to and from school, the school selection fee and the number of students enrolled, the
- What are the application conditions for teacher recruitment in Hangzhou?
- How about Yuanxiang (Xiamen) Coast Co., Ltd.?
- Is it easy to find a CNC job in Taiyuan?