What is the model contract of Tianjin cabinet project?
Party A (demander): Party B (supplier):
Address: Address:
Bank of deposit: Bank of deposit:
Account number: Account number:
Tel: Tel:
Postal code:
According to the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, and following the principles of voluntariness, mutual benefit, equality of rights and interests, honesty and credibility, Party A and Party B, through consultation, combined with the actual situation of this project, sign this contract on the materials, procurement, installation and service of this project for mutual compliance.
I. Project Overview and Contract Contents
1. 1 project name of Party A:
1.2 project address:
1.3 Project Manager of Party A:
Party B shall provide Party A with the supply, installation and related services of "xx" cabinets and supporting hardware and electrical products.
Article 2. Contract quantity and contract price
The total contract price is tentatively set at RMB 2 million (in words: RMB 2 million only). The contract price is a comprehensive contract price including production, transportation, loading and unloading, installation, debugging, taxes, services and public works. , and there is no charge. The final settlement is subject to the actual quantity. If there are other adjustments to the scheme, the settlement shall be made according to the quoted unit price in Annex 1. ..
See Annex I for the detailed unit price and configuration description of materials, and the specific scheme shall be subject to the scheme finally confirmed by Party A. ..
Remarks: The contract quantity is tentatively set at 803 sets of electrical appliances and about 400 sets of cabinets.
Article 3. settlement method
3. 1 Contract price: fixed unit price, actual settlement.
3.2 Payment method: transfer check/telegraphic transfer/other.
Article 4. Rights and obligations of Party A
4. 1 Party A has the right to supervise the production and installation process and ask Party B to explain the problems in the production and installation process.
4.2 Party A is responsible for the installation of hot and cold water intake and drainage in the kitchen.
4.3 If the installation conditions are not available on site due to Party A's reasons, Party B may extend the construction period after submitting it to Party A's project manager for written confirmation, which shall not be regarded as breach of contract.
Article 5. Rights and obligations of Party B
5. 1 Party B requires Party A to provide necessary support and convenience for the project construction.
5.2 Party B requires Party A to rectify the site conditions that do not meet the requirements of the drawings in this contract within a time limit.
5.3 Party B is responsible for the production, transportation, installation and after-sales service of this contract project.
5.4 Party B must debug and accept the installed products.
5.5 Party B must hand over the product description, warranty card and certificate according to the room number.
5.6 In the process of project construction, Party B shall obey the management of Party A, the supervision department and the decoration general contractor. If the refined decoration products are damaged, Party B shall compensate at the original price. If the finished cabinet is damaged by other subcontractors, Party A shall urge the party that caused the damage to compensate at the original price.
5.7 After-sales service: See the warranty description in Annex II for details.
5.8 During the construction period, Party B must keep the site clean and tidy, and the generated garbage must be cleaned up every day.
Article 6, project progress and project acceptance
6. 1 Delivery date and installation progress: the supply and installation are divided into two batches, the first batch of installation duration is 2065438+March 30, 2002, and the second batch of installation duration is 2065438+April 12.
6.2 Acceptance criteria: Standard acceptance shall be conducted according to national standards.
6.3 After the installation and self-inspection of each batch of panel furniture is completed, Party B shall notify Party A in writing for acceptance, and Party A shall complete the acceptance of the quality and quantity of this batch of products within 3 working days after receiving the written notice. After the product quality and quantity are qualified, Party A shall sign the acceptance form of Party B.. If Party A fails to sign the acceptance form of Party B within 3 working days after acceptance, it shall be deemed that the quantity is true.
6.4 If the acceptance is unqualified, Party B shall be responsible for rectification and repeat the acceptance procedures in 6.3.
6.5 The project acceptance of this contract shall be based on the panel furniture sampled by Party B and confirmed by Party A's acceptance. Please refer to the quotation in attachment 1 for panel furniture materials.
6.6 During the acceptance of this contract, both parties shall refer to the national standard GB/T 18884.2-2002 Household Kitchen Equipment.
6.7 After Party A confirms the acceptance to Party B, both parties shall go through the handover procedures.
Article 7, production safety and fire prevention
7. 1 The construction conditions provided by Party A for Party B shall comply with the Fire Protection Law of People's Republic of China (PRC) and relevant fire protection design specifications. The power supply system designed by Party A for the kitchen shall meet the total capacity requirements of kitchen appliances and comply with relevant design specifications.
7.2 The construction drawings and descriptions provided by Party B shall comply with the Fire Protection Law of People's Republic of China (PRC) and relevant fire protection design specifications.
7.3 During the construction period, Party B shall strictly abide by the Fire Protection Law of People's Republic of China (PRC), Code for Fire Protection Design of Interior Decoration of Buildings and other relevant laws and regulations.
7.4 During the execution of the contract, all responsibilities and expenses of Party B's safety accidents shall be borne by Party B, which has nothing to do with Party A. ..
Article 8. responsibility for breach of contract
8. 1 Party B must supply and install the goods according to the delivery date stipulated in the contract. If the construction is not delivered at the time agreed in the contract, 0.5‰ of the total amount of this batch of projects will be deducted as compensation for every 24 hours of delay. If the construction is not carried out for more than 15 days according to the agreed time, the buyer has the right to choose other subcontractors.
8.2 Party A shall be responsible for the acceptance of product quality and quantity, and pay according to the contract. If the construction period is delayed due to uncoordinated cooperation during the construction, the construction period shall be extended by Party A's visa.
Article 9. Dispute or dispute settlement
9. 1 In case of disputes or disputes during the execution of this contract, Party A and Party B shall settle them through negotiation. If negotiation fails, a lawsuit may be brought to the people's court where the project is located according to law. This contract shall come into force from the date of signature by both parties until all terms are fulfilled.
Article 10 Annex to the Contract
10.65438+
The annexes to this contract include:
Attachment 1: quotation and material configuration description of Qingdao xx integrated kitchen.
XI。 supplementary terms
1 1. 1 Party B shall arrange the construction according to the progress of the fine decoration construction unit.
Article 12 Contract number
This contract is made in duplicate, with Party A holding 65,438+0 copies and Party B holding 65,438+0 copies.
Party A: (Seal) Party B: (Seal)
Legal representative:
Handler: Handler:
Year, month, year, month, year
I hope my answer can help you.
- Previous article:Anshun development zone scope
- Next article:JD.COM goes from Guangzhou to Shenzhen.
- Related articles
- How about shache Eagle Textile Co., Ltd.?
- Is the cleaning work of Confucius Center tiring?
- What battles did Wang Shusheng take part in?
- Does time exist?
- What are the standards and requirements for applying for flight attendants?
- Post salary system for kindergartens of Daxing District Education Commission in Beijing
- Music Bar Poster-I saw the real feelings about the door and the scene in "Walnut at Night" _
- What about Suzhou Heyang Electric Co., Ltd.?
- Who is the boss of Baiyuan KTV?
- How is Quantang Primary School in Xingsha?