Job Recruitment Website - Job seeking and recruitment - How much is the basic decoration in Changzhou?

How much is the basic decoration in Changzhou?

Changzhou is a place with beautiful scenery and a long history, and its economy is at the level of a second-tier city. It is a relatively happy thing to buy a house and settle down here. After buying a house, you should consider decoration. How much is the basic decoration in Changzhou? By the way, the quotation of Changzhou foundation decoration, what projects does the decoration foundation include? Interested friends come and have a look.

1. How much is the foundation decoration in Changzhou?

1, price of cement precast hollow slab wall: 30 yuan/m2; Brick wall smashing price: 45 yuan/m2; Slamming price of reinforced concrete wall: 80 yuan /m2.

2. Generally, the garbage is removed and transported to 200 yuan/household, which is the labor cost of transporting it to the designated place of the property, excluding outbound transportation.

3. General labor cost for lamp installation is 200 yuan/household.

4. General labor cost for hardware installation of sanitary ware 200 yuan/household.

5. The price of thermal insulation wall cement board, embedded polystyrene board or rock wool (contracting materials) is generally 120 yuan/flat.

6. The price of ground leveling (contract and materials) is 24 yuan/m2.

Second, Changzhou basic decoration quotation

1. Changzhou foundation decoration generally has two quotations. One is to charge by room area, and some areas charge 400-600 yuan/square meter;

2. The other is to charge according to the actual construction project. 100 square meters of basic decoration costs are divided into three grades: the simple decoration price is about 50 thousand yuan; The mid-range decoration price is about 80,000 yuan; The decoration price is about 654.38+ten thousand yuan.

(Note: The above prices are all from the Internet for reference only, subject to the actual decoration. )

3. What items are included in the foundation decoration?

1. Civil works include trunking, demolition and new wall construction.

2. The hydropower project includes all circuits and waterways as well as installation and laying. (Including materials: strong and weak current, water pipe, trachea, threading pipe and bottom box)

3. The wall project includes leveling, leveling and polishing of the top surface of all walls, and painting latex paint on the walls. (Including materials: putty glue, talcum powder, white cement, gypsum powder, primer and topcoat)

4. The woodwork project includes the design and production of local ceiling, shoe cabinet and TV wall. (Including materials: gypsum board, keel, joinery board)

5. Mud water project: wall and floor tile installation, wall top leveling, trunking, kitchen and bathroom, balcony waterproof and moisture-proof treatment; Wind the sewer pipe. (Including materials: cement river sand, waterproof material)

6. Recycling and cleaning after renovation.

7. The warranty period of concealed works for foundation decoration is generally five years, and that for surface decoration is generally two years.