Introduction to Yuechang Expressway?

The Yueyang-Changde Expressway (Hunan Yueyang-Changde Expressway) is a component of the Hangrui Expressway, the twelfth horizontal line in the national highway network. "The first horizontal line starts from the 10th Brigade of Jianxin Farm in Junshan District, Yueyang City, passes through Huarong County, Nan County, Anxiang County, and connects to Xiaowupu in Changde City and the Erguang Expressway; it goes eastward through Dongting Lake and Suiyue County. Expressway, Beijing-Zhuhai Expressway connection. Regarding the Yuechang Expressway, Zhongda Consulting provides the following relevant information.

The Yuechang Expressway has a total length of 141.62Km, 88 large, medium and small bridges, a permanent area of ??868 hectares (13,020 acres), and an estimated investment of 9.269 billion yuan. On December 30, 2013, the Yuechang Expressway was fully opened to traffic. Its opening not only shortened the driving time to Yueyang, Changde and other places, but also marked the first time that expressways were opened to traffic in Nanxian, Anxiang, and Huarong counties. Say goodbye to the history of no highway in the three counties.

Project Introduction

The Yueyang-Changde Expressway (Hunan Yueyang-Changde Expressway) is a component of the Hangrui Expressway, the twelfth horizontal line in the national expressway network. The first horizontal line in the "Five Vertical and Seven Horizontal" highway network plan starts from the 10th Brigade of Jianxin Farm in Junshan District, Yueyang City, passing through Huarong County, Nan County, Anxiang County, and ends at Xiaowupu, Changde City, where it connects with the Erguang Expressway. ; Crossing Dongting Lake to the east and connecting with Suiyue Expressway and Beijing-Zhuhai Expressway. The entire line is 140.895Km long, with 88 large, medium and small bridges, and a permanent area of ??868 hectares (13,020 acres). The approved investment budget is 10.4525 billion yuan.

The construction of the Yueyang-Changde Expressway is a need for the national expressway network and the regional trunk road network. It is a need to strengthen exchanges between Yueyang and Changde and promote economic development. It is conducive to the development of regional tourism resources and the construction of western Hunan. The Northern Tourism Corridor is designed to meet the needs of traffic growth and flood prevention and disaster reduction in the Dongting Lake area. Its completion will definitely play a positive role in promoting the economic development of northwest Hunan and even Hunan.

Route direction

The recommended route of the proposed highway starts from the 10th Brigade of Jianxin Farm in Junshan District, goes west to Xushi Town (with Xushi Interchange), and passes north of Huarong County , Huarong East Interchange is set up at Qianfeng Village in the east of Huarong County, and Huarong West Interchange is set up near Yangjiaqiao in the west of the county; passing through the moat and Anhe, Zhongjiazui in the north of Nan County, and South at Taiyang Mountain in Langbahu Township County interconnection; passing through Nanding, Anhua, Anchang and Anyou, an Anxiang interconnection will be established at the south of Anxiang County; after crossing the Anxiang River, it will enter Anbao, starting from Beihekou (Ankang Township) and beyond Crossing the border in the east, cross the Lishui River in Anfeng Village, enter the West Dongting Farm about 500m north of Songzigang Town, pass south of Baizhi Lake, and set up the West Dongting Interchange at the second branch about 2km north of the West Dongting Farm. After crossing the Jiadi River to Shigongqiao Town (where the Shigongqiao Interchange is set up), it finally reaches Xiaowupu, where the Xiaowupu Interchange is set up to intersect with the "Er-Guangzhou" Expressway and the Changde North Ring Road. The total length of the route is 141.27km. The connecting line is 6.77km.

The Nanxian section is 12.2 kilometers long, with construction standards of 45 meters wide roadbed, 26 meters wide road surface, 6 lanes designed, and a total investment of 864 million yuan. The route of the south county section of the Hangrui Expressway is as follows: from Huarong Dongwan Lake across the East Branch of Ouchi River, through Langbahu Changying Group 6, Taiyangshan, and Shawan Group 7, then across the middle branch of Ouchi River, through Huameiyuan Farm, and Beihekou to Sanchahe Town, Anxiang County. The expressway is connected to Nanxian County at Taiyang Mountain in Langba Lake. It runs parallel to Line S306 from Taiyang Mountain, passes through Hehuazui Zhanggongtang, and is connected to the entrance of Xingsheng Road in our county and the intersection of S204 and S306 respectively, with a total length of 4Km.

Anxiang is 22.9 kilometers long, with a designed bridge deck and earth road base width of 26 meters. The cost per kilometer is about 71 million yuan, and the total investment is 1.63 billion yuan.

The Changyue Expressway passes through Hexing Village in Sanchahe Town, Songyangshu Village in Anhong Township, Xilijia Village, Nanlukou Village in Anyou Township, Taohualing Village, and Xinkai Village , Xiantao Village, Ankang Township, Dujia Village, Zheng'an Village, Qing'an Village. Nilukou Village, Qixing Village, Xiayukou Town Hexing Village, Anfeng Village, *** five townships and 14 administrative villages, connected to Dingcheng Haozi Port in the west.

The territory of Huarong is 47.5 kilometers long, passing through 34 towns in 7 towns including Sanfengsi Town, Shengfeng Township, Wanyu Town, Hucheng Township, Songjiazui Town, Xinhe Township and Caojun Town in our county Village field.

The east interchange is located in Qianfeng Village, Shengfeng Township; the west interchange is located in Guanzhou Village, Wanyu Town; the service area is located in Jinpen Village, Sanfengsi Town, and the parking lot is located in Shuangdi Village, Xinhe Township;

The Huahong Canal Bridge starts from Jianxinyuan No. 1 Station in Yueyang City, crosses the Huahong Canal and ends at Bailang Lake, with a total length of 2946.88 meters.

The Third Huarong River Bridge is located in Lujiatai, north of Huarong County, Yueyang City , about 1.5 kilometers away from the Second Huarong River Bridge upstream, the left bank corresponds to the embankment pile number 16+200, and the right bank corresponds to the moat embankment pile number 77+600. The total length of the bridge is 824.8 meters.

Umeda Lake River The extra-large bridge is 1,097 meters long. The left bank is Huarong County Ji'anhe Embankment, and the right bank is Nan County Yule Embankment.

There are 6 tender sections in Junshan District, 23 kilometers long. The project starts from Jianxin District in Junshan District. The Tenth Farm Brigade is routed along the right side of S306 Provincial Road, heading west through Jianxinyuan. The first farm brigade under construction crosses the Huahong Canal, passes through Xushi Town and Caisanghu Town in Junshan District, and enters Xintaiyuan, Qianliang Lake Complex. Hua The Hongyun Canal Bridge starts from Jianxinyuan No. 1 Brigade, crosses the Huahong Canal, and enters Huarong.