Job Recruitment Website - Job seeking and recruitment - Demolition scheme of Jinan start-up area
Demolition scheme of Jinan start-up area
First, adhere to high standards and accelerate planning. It is clear that the planning of the starting area should adhere to the future vision, international standards and the characteristics of the Yellow River, and put forward higher requirements for strategic guidance and institutional convergence. At present, we are working with the Development and Reform Commission and the Natural Resources Planning Bureau to promote the compilation and approval of national spatial planning, and jointly complete the compilation of development planning and ecological protection planning. At the same time, according to the planning of xiong'an new area, fully absorb ideas, reference methods and reference standards, and simultaneously promote the preparation of 16 special planning. At present, the planning results have basically taken shape and are being optimized and upgraded. In order to ensure the realization of the first-class planning goal, the starting area explored innovative work modes, and built a promotion system with the participation of well-known experts at home and abroad, top teams in the industry and follow-up services from local institutes, which fully ensured the strategic, overall and forward-looking planning and ensured the seamless connection and orderly landing of the planning.
The second is to highlight high quality and accelerate the consolidation of the bearing foundation. Focusing on actively exploring innovative ways of urban development, the Opinions put forward six goals of building a water-saving demonstration city, a green city, a smart city, a prosperous city, a livable city and a resilient city, and strive to realize the vision of "Better City, Better Life". The starting area is based on the current work focus of "laying a solid foundation and erecting beams with columns", firmly grasping the key to improving the quality of the city, correctly handling the relationship between accelerating construction and making contributions for a long time, not only playing the first move in detonating projects and people's livelihood projects, but also doing a good job in laying a good foundation and benefiting the long-term slow work. The first is to do a good job of spatial integration. Actively and steadily implement land acquisition and demolition to make room for high-quality development. At the same time, we will promote the relocation and resettlement with high standards and fast pace, build according to the "two-star standard of green building", do a good job of "15-minute living circle", and make every effort to build a demonstration project of resettlement security in the city. During the year, the first batch of relocated residents will move back, so that the people can enjoy the development dividend of the starting area. The second is to optimize the environment. Based on the construction of ecological protection model of the Yellow River basin, we will make overall plans to promote the construction of the Yellow River An Lan defense line, the restoration of natural ecosystems, and the construction of green ecological corridors. It is planned to start the construction of the demonstration section from Yellow River Bridge to Greenland Guo Bo in advance, and plan the overall improvement of Queshan and its surrounding environment. At present, the first phase of the demonstration section has initially formed a landscape effect, and the main dangerous rock mass treatment project in Queshan has just completed the acceptance review. Welcome citizens and friends to visit. The third is to do a good job in basic supporting articles. System layout of water, electricity, heat and sewage treatment facilities, and orderly promote the construction of group-type municipal complexes and high-quality public service projects. On June 6th, 25 key public infrastructure projects, including Quehua Campus of Provincial Experimental Middle School and Yellow River Sports Center, were started, and about 20 more projects are planned during the year to comprehensively improve the comprehensive carrying capacity of the starting area. At present, the first batch of municipal engineering gas heat source plants have basically met the acceptance conditions, and can provide comprehensive energy supplies such as cold, heat, water and electricity after being put into use. The first section of Huanghe Avenue is scheduled to be completed and opened to traffic in 65438+ 10. Recently, the starting area signed a strategic cooperation framework agreement with the Provincial Department of Education and the Provincial Health and Health Commission, which will strengthen cooperation in the introduction of quality education and medical resources and accelerate the creation of a new highland for quality public services. The fourth is to do a good job in industrial agglomeration. Focus on high-end, high-quality, efficient and cluster-intensive industrial development direction, make every effort to build a modern industrial system with international competitiveness, and accelerate the formation of the core growth pole of high-quality development in the Yellow River Basin. At present, six Fortune 500 companies have landed in the starting area, with a total of 8 projects signed, with a total investment of 254.4 billion yuan. We are actively promoting negotiations and cooperation with large central enterprises, systematically introducing the concept of future industrial community, and realizing the overall planning, integrated construction and contiguous development of parks such as the headquarters economic start-up zone.
The third is to speed up the implementation of reform and innovation with high efficiency as the core. Focusing on the construction of a high-quality factor guarantee system, the Opinions made detailed arrangements for accelerating the gathering of key factors such as land, capital, talents and project guarantee, clarified the work grasp and put forward the objectives and tasks. Based on the most urgent needs of the current construction and development, the starting zone will further strengthen the awareness of daring to break through and take responsibility, innovate the path of gathering factors, make full use of the biggest policy dividend of "four zones in one", plan to start global recruitment of professionals, explore the implementation of regional chief designer pilots, set up high-end expert advisory committees, and create the best policy environment. The warmest talent introduction environment, the best entrepreneurial environment and the most beautiful ecological environment will accelerate the high-level take-off and all-round development of the starting area.
legal ground
"Opinions on Accelerating the Construction of Jinan's Starting Area for the Conversion of Old and New Kinetic Energy" (1) Scientifically determining the national spatial pattern. Adhere to the rigid constraints on the carrying capacity of resources and environment, and according to the concept of "controlling red, increasing green, expanding blue and leaving blank", rationally arrange the three major ecological spaces of production and living, so as to realize intensive and efficient production space, moderate living space and beautiful ecological space. Scientifically predict the population size, reasonably determine the scale of land use and development intensity, and form a new pattern of urban and rural development with moderate scale, orderly space and economy. Adhere to the ecological priority, the proportion of blue-green space is not less than 70%, and the proportion of urban construction land is controlled within 30%. Scientifically delimit the red line of ecological protection, the boundary of permanent basic farmland and urban development, strengthen the full connection of all kinds of planning space control lines, and realize the integration of multiple regulations. Implement strategic gaps and reserve space for major national development strategies and urban sustainable development.
(2) Reasonably construct the spatial layout of the starting area. Considering the functional orientation, development goals and current conditions of the starting area, we should adhere to ecological priority, balanced development, livable and suitable for business, and plan to form a spatial layout of "one vertical, one horizontal, two cores and five groups". "One vertical" refers to the historical landmark nodes of Jinan, such as Qianfo Mountain, Baotu Spring, Daming Lake and Mingfu City, which form a unique spring city axis integrating mountain springs, lakes and rivers, and build an urban axis space that runs through the north and south and blends ancient and modern times. "Yiheng" refers to the Yellow River as an important ecological backbone of the city, relying on natural ecological resources such as water system, mountains, woodland, wetlands and coastline. Dig deep into the cultural connotation of the Yellow River and create an ecological landscape belt integrating landscape and humanity. "Two cores" refers to the construction of urban science and technology innovation zone and airport economic zone, speeding up the development and construction of the initial area, and forming the overall pattern of cross-strait interaction and development along the river. "Five groups" refers to the construction of Jinan city sub-center, Cuizhai high-tech industrial cluster, Sangzidian high-end manufacturing industrial base, Sungeng Taiping green development base and airport industrial cluster, and the construction of urban functional groups with mixed functions and balanced occupation and residence.
- Previous article:How many cases were there in Laifeng on September 22nd?
- Next article:Where is Lingao Shunchang Logistics?
- Related articles
- How about Shenzhen Qianhai Jinya Information Technology Co., Ltd.?
- What conditions do I need to open a DNF goldsmithing studio? Gao Renjin
- What problems should I pay attention to when applying for the 20 17 Bank Campus Recruitment Examination Network?
- How is Foshan Sanshui Kohler Factory like?
- Who has done it at Pingdi Dacheng Products Factory, Longgang District, Shenzhen City, or is doing it now?
- Introducing myself in English when meeting for the first time, meeting several managers for the first time
- Huaying people's hospital business
- How about Taigao feed salesman?
- What are the application conditions for blasting engineers?
- Is Changbai Mountain Forest Industry Group easy to enter?