It is said that the X034 highway in Hengyang County is newly built and rebuilt. Is it true?/You don't say. When does it start? Why hasn't it been announced yet?

Project Name: S228 and S339 from jiepai, Hengyang County to expressway, Xi Du.

(II) Project Overview: S228 and S339 The jiepai-Xi Du Highway in Hengyang County is a national and provincial trunk highway project in the "Twelfth Five-Year Plan" of Hunan Province. The project construction plays an important role in improving road conditions, perfecting the road network structure in this area, promoting regional economic development and strengthening the economic ties between Hengyang County and surrounding towns.

The starting point of the highway is located at the old road X034 at the junction of jiepai town in Hengyang County and Maji Town in Hengshan County (corresponding to X034 pile number K 18+804). The route passes through jiepai town and the planned jiepai Ceramic Circular Economy Industrial Park, passes under the S6 15+ 143 Yuelin Expressway, and then passes through Shishi Township and Zhajiang Town. At K45+ 193, it passes through S80 Shao Heng expressway, and the route is connected with Qingjiang Road in Xi Du Town. * * Line crosses the provincial highway S340 (S3 15) after using Qingjiang Road for 0.747km, and ends at the intersection of Qingjiang Road and S340 (S3 15) in Xi Du Town. The total length of the recommended route is 50.522km (the construction mileage is 49.775km). Main control points: starting point, villages and towns along the route, planning jiepai ceramic circular economy characteristic industrial park, intersection and end point of the route with Yuelin Expressway and Shao Heng Expressway.

The whole highway adopts secondary highway construction standard, with design speed of 60km/h and subgrade width of12m; . Covering an area of1.0/.950 hectares (including 82.550 hectares of new land), earth and stone works of the whole line 1.026726 m3, subgrade drainage and protection works 95 1.39 m3, asphalt concrete pavement 5 1 m2. Demolition of buildings and structures 154 16m2, and demolition of 46 power and telecommunication poles. The total investment of the project is estimated to be 4,699,267,5438+0.2 million yuan, and the average cost per kilometer is 94,4438+0.438+0.8 million yuan. It is planned to start construction in June 20 16 and be completed and opened to traffic in February 20 17, with a total construction period of 24 months (2 years).

The main environmental impacts of this project are the impacts of ecology, dust, noise and wastewater during the construction period, traffic noise and automobile exhaust during the operation period.

(3) Project construction unit: Hengyang Communications Construction Investment Co., Ltd.

Contact: Xu Tel: 0734-6656677 (fax)

Mailing address: No.97, Feng Chun Middle Road, Xi Du Town, Hengyang County, with postal code of 42 100 1.

Electronic Mall: QQ569703779

(4) Preparation unit of environmental impact report: Environmental impact assessment office of Hunan Meteorological Bureau.

Contact person: Mr. Li Tel: 073 1-85540 140 (fax)

Mailing address: No.4 Section of Furong South Road 196, Changsha, and postal code: 41018.

Electronic Shopping Mall :qxlmao@sina.com

(five) the main work content of environmental impact assessment

(1) On the basis of investigating the general situation of natural environment, social environment and ecological environment where the project is located, the environmental quality of the area is evaluated by investigating or monitoring the present situation of air, water and sound environment; (2) Through engineering analysis, understand the highway route scheme, main control points, main engineering contents, project land occupation, building materials and transportation conditions, and forecast traffic volume, etc. , analyze the environmental impact of the project, the discharge of various pollutants and pollution control measures, and determine the main environmental impact factors of the project; (3) Focus on the impact of ecology, dust, noise and waste water during the construction period and the impact of traffic noise and automobile exhaust during the operation period, and analyze or predict the impact degree and scope of the project construction on the social environment, ecological environment, acoustic environment, water environment and ambient air in the evaluation area; (4) Analyze and demonstrate the feasibility of environmental protection measures during the project design period, construction period and operation period, and put forward evaluation requirements or suggestions; (5) Demonstrate the environmental feasibility of the project route selection from the perspective of environmental protection, and put forward requirements or suggestions for the existing environmental problems; (6) Public participation in project investigation; (7) Formulate environmental protection management plan, environmental monitoring plan and environmental supervision plan.

(six) the main problems of soliciting public opinions

(1) The overall view and support attitude of the local public towards the project construction; (2) The favorable or unfavorable influence of the project construction period and operation period on the local air, water, sound, ecological environment and the quality of life of local residents; (3) Put forward good opinions or suggestions to the project construction unit in view of the environmental problems that the project construction is most concerned about; (4) Suggestions and requirements for the EIA unit of this project; (5) What are the suggestions and requirements for the environmental protection department to approve the project?

(7) Main modes of public opinion.

(1) directly notify the construction unit or EIA unit; (2) Fax or mail the opinions to the construction unit or EIA unit; (3) Fill in the public participation questionnaire.

(eight) the starting and ending time of soliciting opinions or suggestions.

From the date of announcement to the date of submitting the environmental impact assessment report.

Hengyang county traffic construction investment co., ltd

2065438+September 25, 2005