Guanlan High-tech Industrial Park Municipal Engineering (Phase I) Flood Drainage Canal Project is located in Zhangkeng Road, Guanlan Town, xx District. Its main function is to discharge the surface water collected by the three original flood drainage canals of the South Ring Road and the rainwater on the section of Road 6 (which has been cancelled due to planning reasons). Start date:; The completion date is, and the continuous construction time is 87 days. The coordinates of the starting point are: X35705. 143、Y 1 15807。 069; The coordinates of the end point are: X3558 1. Y 1 14634。 035。 The total length is 1394. 14m consists of 2. 6m? 2。 0m and 3. 0m? 2。 The 7m reinforced concrete box culvert consists of two sections. The main work contents and workload are as follows:
1. Earth excavation: 132644. 0 cubic meter
2. Backfill earthwork: 13067 1. 0 cubic meter
3.C 10 concrete cushion: 600. 88 cubic meters
4.C30 impervious concrete for main structure: 6962. 85 cubic meters
5. Reinforcements: 1244. 45 tons
6. Settlement joints and expansion joints: 1462. 0m
7、? 1000 inspection wells: 22.
? 1500 inspection well: 1.
8. Rockfill: 768. 0 cubic meter
9. Dynamic compaction of stone piers, with tamping energy of 2000KNW:4488. 0 square meters
10, dynamic compaction stone pier, tamping energy1500knw:1134. 0 square meters
1 1, dynamic compaction of earth, tamping energy of 3000knw: 1489. 0 square meters
12, dynamic compaction earthwork, tamping energy 1500knw: 2 105. 5 square meters
The box culvert foundation of this project adopts natural foundation, and some parts adopt dynamic compaction earthwork, dynamic compaction block stone pier and replacement block stone as the bearing layer of box culvert foundation. After treatment, the standard values of bearing capacity are all greater than 200KPa, which meets the design requirements. In this project, two methods, plate load test and Rayleigh wave test, are used to detect the foundation treatment. See Test Report of Foundation Soil Load Test and Rayleigh Wave Test Report for the test results.
The topographic unit of this project is complex, including soft foundation treatment and high excavation area, which has great influence on the construction period and quality control. Therefore, our company has formulated a rigorous and reasonable construction schedule, construction technology, construction process and quality assurance technical measures, and put them in place. The tight construction period is the biggest obstacle to the development of this project, only 90 days. We should not only consider the intermittent time of soft foundation treatment, but also consider the coordination and balance with the site leveling project to avoid unnecessary repetitive processes or cause construction interruption and mechanical shutdown. Through the coordination and guidance of the leaders of the owner, supervisor, design institute and other units and engineers, the foundation treatment and earthwork construction of this project can basically proceed smoothly, ensuring the continuity of construction and creating favorable conditions for the main structure construction of box culvert in the future.
Second, the construction management and organization
Due to the tight construction period of this project and the large amount of earthwork excavation and filling, it takes some time to complete the soft foundation treatment, and the task is heavy. In order to ensure the efficient, high-quality and safe completion of this project, our company has invested a lot of manpower and material resources in the construction of this project, and established a project management department with the corporate legal representative as the leader and the project manager as the core. The project department and the following departments are United to overcome difficulties and stick to it? Survival by quality, development by reputation, and efficiency by speed? With the full support of the owner, supervisor, design institute and other units, we will devote ourselves to the construction of this project.
(1) In organizing the construction of this project, the construction tasks undertaken by the three construction teams are as follows:
1, earthwork construction team: responsible for earthwork excavation and transportation, earthwork blasting, earthwork backfilling and other earthwork construction operations.
2. Dynamic compaction construction team: responsible for dynamic compaction construction of soft foundation in this box culvert section.
3. Construction team of reinforced concrete structure: responsible for cooperating with mechanical method to dig strip soil of foundation trench, manual backfill soil compaction on both sides of box culvert, C 10 concrete cushion of box culvert, C30 concrete pad and C30 anti-seepage spray structure, reinforcement, formwork and support enclosure, installation of rubber waterstop, manhole masonry and other construction operations.
Third, the main construction methods and technical measures
(a) trench earthwork excavation construction method:
1, before earthwork excavation, according to the design requirements and the change of terrain, use total station to measure the sideline of excavation earthwork or soft foundation treatment range, drive wooden stakes, sprinkle with white lime signs, and install slope plates every 20m in high excavation area, so as to better and more effectively check and control the excavation width and slope during excavation and avoid over-excavation or under-excavation.
2. Earthwork excavation shall be carried out according to the principle of top-down, vertical stratification and horizontal segmentation, and bottom excavation is strictly prohibited.
3. The trench basement shall not be disturbed, and the scarification shall be removed. The next working procedure can be carried out only after the foundation pit inspection is qualified, and the quality of the foundation pit shall be strictly controlled.
(2) Construction method of dynamic compaction earthwork and stone pier
1. Construction sequence: preparation? Set out? Measurement and inspection before tamping? Apply for dynamic compaction? Ram in position? Measure the elevation of the top of the rammer? Record? Dynamic compaction? Measurement records? Rammed pit backfill? Continue to repeat tamping, measuring and backfilling until the design requirements are met and the first, second and third tamping are completed? Train? Backfill stone pad? Crushing? Testing? Done.
2. Before dynamic compaction, the trench shall be excavated to the design requirements, and the earthwork shall be backfilled to the design elevation after being confirmed by the supervision engineer.
3. Measure the tamping point position with total station, and drive the bamboo pile, and mark the pile head with paint for identification. After inspection, apply for dynamic compaction.
(3) Construction method of soft foundation replacement and filling
1, construction process: setting out? Change water? Digging? Accept? Layered backfill and rolling? Done.
2. According to the design requirements, set out the excavation sideline (including the slope ratio of 1: 1 coefficient), then change the water to keep the original drainage system unblocked during the construction period, and finally carry out the excavation operation.
3. After the groove is opened to the design requirements, it should be treated immediately.
Procedures, submit acceptance confirmation.
(4) Construction method of box culvert main structure engineering
Construction process: measuring and setting out? Install the bottom template? Tie steel bars? Concealed acceptance? Concrete pouring? Install the template inside the injection molding body? Vertical support and roof injection formwork? Tie steel bars? Injection external sealing plate and pull rod? Check the hidden acceptance? Pouring concrete Maintenance.
1, template production and installation methods
1。 1, the bottom plate and wallboard formwork are assembled with 20mm thick plywood, and the dragon skeleton and support are made of 8cm* 10cm, 10cm* 10cm square timber and? 48 steel pipe assembly method.
1。 2, when installing the template, according to the outer line control pile pull line, accurately install the surface position of the template, the elevation is determined by the method of combining level and connector flat tube, and the elevation of the top surface of the template is the design concrete surface elevation. -
1。 3. Before the concrete wall is closed, the water stop of the settlement joint should be installed accurately, the laitance on the surface of the horizontal joint should be chiseled, and the loose stones should be cleaned and surface washing should be clean.
2。 Manufacturing and installation methods of steel bars
2。 1, steel bar processing, steel bar processing table and design review, check whether there is any mistake or omission in the blanking table, check whether each steel bar meets the requirements according to the blanking table, release samples according to the blanking table after inspection, and mass production can be carried out only after it is qualified. Processed steel bars should be listed and stacked neatly.
2。 2, steel cutting should be based on the number of steel, diameter, length and quantity, length collocation, long material before short material, try to reduce and shorten the short head of steel, in order to save steel.
2。 3. Be familiar with the drawings carefully before steel binding, check whether the ingredient list is inconsistent with the drawings, and carefully check whether the finished product size and elbow are accurate. Binding cannot be performed until the verification is passed.
2。 4. After the completion of steel binding, organize relevant units to conduct concealed acceptance in time, make records of concealed acceptance and other materials, and rectify the existing problems in time.
3, concrete pouring construction method
3。 1. Before using the commercial concrete, contact the supplier to provide the design label of the design strength, the requirements of admixture and slump, and the pouring quantity.
3。 2. The concrete shall be poured in sequence and in different zones to form a flow process, but the concrete poured in the next zone and the last zone must be before the initial setting.
3。 3, pay attention to protect the steel bar in the process of concrete pouring, to ensure that its position does not deviate, and at the same time ensure the installation position of the water stop.
3。 4, has been pouring concrete within 6 hours after the final set in time hold people accountable for water conservation, wet curing period of not less than 7 days.
4, inspection well construction method
4。 1, the manhole can be laid only after the concrete of box culvert is poured for 7 days.
4。 2. Wet the red brick with water before laying, and mix the cement mortar evenly according to the requirements of mixture ratio before laying.
4。 3, masonry wall must be round and vertical, mortar, mortar joint level off, plastering calender without empty drum cracks. The ladder shall be installed accurately and shall not be loose. Jing Zuo manhole cover is intact and installed smoothly.
Four, quality, safety, civilized construction and environmental protection control measures
? Safety first, prevention first? Policy and? Safety must be managed in production? This principle has been implemented in the whole construction process. Strengthening the leadership and management of production safety, and fully implementing the Grading Standard for Safety Inspection of Building Construction and Technical Specification for Temporary Power Use on Construction Site are effective measures and methods to achieve the six safety objectives of this project, namely, no casualties, no fire, no poisoning and no major equipment accidents.
Although this project is close to the South Ring Road, our company carried out enclosure construction on the construction site to ensure that it would not affect the surrounding environment and won unanimous approval. Clear the health responsible person in the construction site and living area, implement various health measures and systems, and create a healthy and comfortable working and living environment for workers.
On the basis of ensuring quality and safety, ensure the construction progress. In the construction process, based on the total schedule network, according to different construction stages, construction methods and different professional jobs, different schedule objectives are decomposed, and the whole construction process is dynamically controlled by various technical and management measures. This project is catching up with the epidemic period of atypical pneumonia virus in China at the peak of construction. However, under the leadership and instruction of the district government, the owner, the supervisor and other departments at all levels, our company has done a good job in all kinds of anti-SARS work, maintained stable personnel, closed the construction, combined work and rest, and made overall arrangements, striving to pay equal attention to both construction and anti-SARS, ensuring that the overall construction task was completed on schedule and all sub-projects achieved excellent goals.
Verb (abbreviation of verb) conclusion
During the construction of this project, including the extraordinary period of the national anti-SARS, the district government, the owner, the supervisor and other units all gave strong support and help, solved all the difficulties in the construction in time, and enabled our company to carry out all the work in the flood discharge project in Guanlan smoothly, achieved the overall progress goal and excellent quality goal, and successfully completed the tasks entrusted by the owner. I would like to take this opportunity to express my heartfelt thanks to all employees of our company, and hope that through the cooperation of this project, we can get the concern and cooperation of the owners again. Thank you!
Summary of project management: Time flies, and the sun and the moon fly like flies. One year is really short, and before you know it, 20 15 will pass. The new year has come again. At the turn of the old and the new, sum up the past, think about the future, learn from the past, make up for the future and be honest with yourself.
Summary of work, in order to better complete their work in the new year.
I joined the engineering department of the company from March 2065438 to March 2005, and was mainly responsible for the technology, construction and cost management of HVAC and water supply and drainage. In the course of my work, I will abide by the company's rules and regulations, be strict with myself at ordinary times, and be honest and self-disciplined. I am conscientious and responsible in my work, able to integrate theory with practice, cooperate with colleagues in the engineering department and related departments, and better complete all the work assigned by the company leaders.
First of all, in terms of technical management:
1, can patiently and meticulously do a good job of drawing review, cooperate with the competent leaders and relevant design units to implement the location and direction of water supply and drainage, heating, gas and other pipe networks in the community, find unreasonable schemes and designs as much as possible, put forward their own schemes and ideas, actively communicate with designers, and improve the design of schemes and construction drawings.
For example, Zhongrong International Project has many underground structures, and the underground garage and underground civil air defense are connected with various buildings, which will lead to drainage pipes in the future. Therefore, it is proposed to the competent leaders that a passage should be set aside between buildings 2#, 3#, 4# and 5# and underground garage and underground civil air defense, otherwise the drainage pipe network in the community will not be laid. For another example, the design institute designed the heating and water supply and drainage pipes of the connector on the street of Hankou, but there was no place to lay so many pipes on the street of Hankou. After consulting the competent leader, raise an objection to the design unit in time, and change the design after being audited by the design unit.
2. External coordination: For an engineering project, external coordination is very helpful for the smooth development of the project. My main job is to cooperate with various professional companies (tap water, heating, gas) to complete the supporting design of the pipe network of the project under the guidance of the competent leader. With the correct leadership and help of the leaders, we have maintained a good cooperative relationship with various professional companies, and the supporting design of various professional pipe networks is proceeding as scheduled. At present, the design of water supply and drainage pipe network has been completed, and the design of gas and heating pipe network is under way. In the process of work, I can actively cooperate with various professional designers to complete various tasks from the company's interests and perspectives.
Secondly, in terms of site management: since I entered the site in April, I began to study the site water use scheme with my leaders, and assisted them to complete the relevant procedures and design work after the scheme was implemented. In cooperation with the water supply company, the construction of temporary water and on-site construction water for Zhongbaiyi Reservoir was completed, ensuring that the project started as scheduled. Before foundation excavation, with the help of leaders and colleagues, the laying of drainage pipes in the construction site was completed according to the actual situation, which solved the drainage problem of foundation excavation in various construction units.
In the process of making the scheme, the plastic drainage pipe is adopted in combination with the actual project. After drainage, the pipeline can also be used for the hole of the range hood, saving some funds for the company. After the project entered the main construction stage, in view of the hidden parts that are prone to problems, the supervisor and the plumbing squad leaders of various construction units were organized to hold a meeting in time, which put forward clear requirements for waterproof casing's materials and production, and made technical disclosure on the problems that are prone to occur in the project. All construction units are required to do a good job in the sample room before the construction of each working procedure, and can continue the construction only after passing the inspection by Party A and the supervisor to ensure the engineering quality.
In the process of engineering construction, because the professionals of the supervision company sometimes can't be in place in time, it is necessary to regularly check whether the positions and specifications of various pipelines meet the design and specification requirements, and find and deal with the problems existing in the project as soon as possible, so as not to affect the construction of subsequent projects. For example, improve the elevation of the drainage pipe outside the house and solve the problem that the drainage pipe on one side of Hankou Street is too low. In the process of construction management, we can adhere to the design documents as the basis, in strict accordance with the requirements of construction specifications for inspection.
Thirdly, in the aspect of project cost management, we can strictly review the site construction visa, follow the principle of construction visa, effectively control various factors affecting the project cost, carefully review the list of materials proposed by the construction unit, and correct problems and mistakes in time.
Most importantly, I have done some work in the past year. In the past year, I have made some achievements, but there are also some shortcomings. I sum up my past experience and try to correct the shortcomings in my past work. In my future work, I will be more strict with myself. While doing our job well, we should constantly learn and accumulate, constantly ask questions, constantly solve problems, and constantly improve ourselves to ensure high efficiency and high quality. Dedicated to the development of the company.
I recommend it carefully.
- Previous article:Kfc recruitment requirements
- Next article:Which side has more snacks, Wuxi or Changzhou?
- Related articles
- Is it easy for intermediate accountants to find jobs?
- 20 14 teacher recruitment in Ryan
- Suzhou Job Fair on March 24th
- Is there a school recruit for China Railway 12th Bureau?
- What are the golden ideas in the third grade of primary school?
- Is it true to recruit anchors with a guaranteed 4000?
- Is it true that Dongguan energy-saving street lamps are assembled and delivered?
- Is Guanghan Aifeier Kindergarten private or public?
- Overview of Yulin Yiyou Energy and Chemical Technology School
- Is there a better headhunting company in China?