Job Recruitment Website - Job seeking and recruitment - What are the working procedures of concrete mixer?

What are the working procedures of concrete mixer?

(1). Fill the ship's washing water tank with water when loading, and rinse the inlet with water before each loading to keep the inlet moist when loading.

(2) After loading, rinse the feed inlet, clean up the residual concrete near the feed inlet, and remember to discharge the sewage in the concrete storage tank before the next loading. Secondly, ensure the effectiveness of the hydraulic oil cooling device.

(3) Clean the discharge chute after discharging at the construction site, and then add 30-40 L of cleaning water to the concrete storage tank. When the vehicle returns, keep the concrete storage tank rotating slowly forward to ensure the cleanliness of hydraulic oil.

(4) After work every day, thoroughly clean the concrete storage tank and the periphery of the import and export to ensure that there is no caking of cement and concrete. Grease should be filled on time, wear should be checked frequently, and it should be repaired and replaced in time.