Job Recruitment Website - Job seeking and recruitment - How to install excavator tracks

How to install excavator tracks

The method of installing the excavator track is as follows:

Unplug the track latch, lay the track on the ground, start the excavator, walk forward, stop in the middle, and pull the track Close it up and insert the latch.

The crawler track is a flexible chain link driven by the driving wheel and surrounding the driving wheel, road wheel, idler pulley and supporting pulley. The track consists of track shoes and track pins.

The track pins connect the track shoes to form a track link. There are holes at both ends of the track shoe, which mesh with the driving wheel, and there are induction teeth in the middle, which are used to regularize the track and prevent the track from falling off when the tank turns or rolls. There are reinforced anti-skid ribs (referred to as patterns) on the side that is in contact with the ground. , to improve the sturdiness of the track pads and the adhesion between the track and the ground.

Extended information:

Preparations for the installation of excavator tracks are essential

1. Try to choose a spacious, flat and hard site, and maintain a certain degree of rotation and walking. scope.

2. Determine the degree of shedding of the excavator. If it is caused by the breakage of an object or other faults, the repair personnel should be notified in time for repair.

3. Check whether there is soil, sand and gravel in the excavator tracks and clean them in time.

4. Use a wrench or socket to remove the track oiling grease fitting. Use an excavator bucket to hold up the track and turn it on the side that has fallen off. The butter will be squeezed out and the drive wheel will retract.

Baidu Encyclopedia - Track Shoes