Job Recruitment Website - Job seeking and recruitment - Introduction of Taiyuan construction project bidding network?

Introduction of Taiyuan construction project bidding network?

Taiyuan Construction Project Bidding Network belongs to Taiyuan Construction Project Bidding Information Network (hereinafter referred to as Taiyuan Bidding Network), which is a bidding portal website providing all kinds of information release, bidding announcement, bidding, winning the bid, engineering and procurement services for Taiyuan City. Taiyuan Tendering Network actively performs the corresponding duties of Shanxi Tendering Network and maintains the activity order of all kinds of engineering procurement projects.

The contents of the Management Regulations of Shanxi Construction Engineering Survey and Design of Taiyuan Construction Engineering Bidding Information Network mainly include: (1) general provisions (2) qualification management (3) contracting and contracting of construction engineering survey and design (4) quality management of construction engineering survey and design (5) legal liability (6) supplementary provisions, in which the contracting and contracting of construction engineering survey and design are as follows:

Twenty-second preparation of construction engineering survey and design documents shall be based on the following documents and regulations:

(a) the project approval document;

(2) Requirements for urban and rural planning;

(3) Mandatory standards for engineering construction;

(four) the requirements of the state on the depth of preparation of construction engineering survey and design documents;

(5) contracts for survey and design of construction projects.

Railway, transportation, water conservancy and other professional construction projects should also be based on the requirements of professional planning.

Twenty-third survey and design of construction projects, the survey and design documents submitted by the construction unit to the construction unit shall meet the following requirements:

(1) Standards, norms and procedures for survey and design of construction projects;

(two) the construction project survey and design contract;

(three) the signature of the survey and design personnel of the construction project;

(four) the signature of the legal representative and technical person in charge of the survey and design unit of the construction project or its entrusted agent;

(five) stamped with the seal of the legal person, the special seal for the qualification of construction engineering survey and design units and the special seal for the qualification of registered practitioners;

(six) other requirements stipulated by construction laws and regulations.

Article 24 When preparing preliminary design documents, it is necessary to analyze and study all components of the construction project and put forward the overall design scheme and general budget estimate. In accordance with the relevant provisions of the state and the province, if the preliminary design approval procedures need to be fulfilled, the approval procedures shall be fulfilled.

Twenty-fifth construction drawing design documents shall meet the needs of equipment and materials procurement, non-standard equipment production and construction, and indicate the reasonable service life of the construction project.

Twenty-sixth construction units shall submit the construction drawings and design documents of construction projects and their technical review reports to the relevant administrative supervision departments of the people's governments at or above the county level for procedural review. Construction drawing design documents without examination and approval shall not be used.

The technical review report of construction drawing design documents is put forward by the review institution recognized by the construction administrative department at or above the provincial level.

The charging standard for technical review of construction drawing design documents shall be formulated by the provincial price department in conjunction with the provincial construction administrative department.

Twenty-seventh construction engineering survey and design units shall make a detailed explanation to the construction unit and supervision unit on the construction drawing design documents that have passed the examination, and participate in the acceptance and trial operation assessment of the main stage of the construction project.

For major and complicated construction projects, the construction unit may sign on-site technical service contracts with the construction project survey and design unit.

A construction project survey and design unit that has obtained the supervision qualification certificate may conduct construction supervision on its survey and design construction project.

Twenty-eighth construction project survey and design documents need to be changed in the implementation process, the original construction project survey and design unit is responsible for the revision; With the consent of the original construction engineering survey and design unit, the construction unit may also entrust other construction engineering survey and design units with corresponding qualifications to make modifications. Changes in the survey and design documents of construction projects involving the function, scale and structural system of the project must be reported to the original examination and approval authority for examination and approval.

The unit that modifies the survey and design documents of the construction project is responsible for the modification; If the modified part has joint influence on the unmodified part, it shall bear corresponding responsibilities.

Article 29 Where the renovation project involves the change of the main body and load-bearing structure of the construction project, the construction unit shall entrust the original construction engineering design unit or other construction engineering design units with corresponding qualifications to prepare the construction drawing design documents before the construction, and report them to the original examination and approval authority for examination and approval.

If the building needs to be added or rebuilt, the construction unit shall entrust the original construction engineering survey and design unit or other construction engineering survey and design units with corresponding qualifications to conduct reliability appraisal and seismic appraisal of the original building in accordance with relevant national standards, and conduct construction drawing design according to the appraisal results.

Units undertaking the survey and design of construction projects listed in the first and second paragraphs of this article shall be responsible for their survey and design activities according to law.

Thirtieth construction project survey and design documents must be used for construction project survey and design agreed in the contract.

Thirty-first construction engineering design should implement the liability insurance system.

Construction engineering design liability insurance shall be handled in accordance with the relevant national construction engineering design liability insurance clauses.

Article 32 The construction unit shall provide the original materials related to the construction project to the survey and design unit of the construction project, and be responsible for the completeness, authenticity, accuracy and timeliness of the original materials provided.

Thirty-third construction engineering survey and design units and their legal representatives are responsible for the survey and design documents prepared by their own units.

The chief engineer and chief architect of a construction engineering survey and design unit shall bear technical responsibility for the survey and design documents for which they are responsible.

Project leaders, professional leaders, registered practitioners and other relevant personnel of construction engineering survey and design units are responsible for the survey and design documents signed and sealed by them.

Thirty-fourth construction drawing design document review institutions and their reviewers shall complete the technical review of construction drawing design documents within the time stipulated in the contract, and bear the corresponding review responsibilities for the construction drawing design documents that have passed the review.

Article 35 The legal representatives and persons directly responsible of the construction unit and the construction engineering survey and design unit shall, within the reasonable service life of the construction project and the legal prosecution period, be responsible for the construction engineering survey and design handled by them according to their respective responsibilities.

Thirty-sixth construction engineering survey and design quality accidents must be confirmed by the appraisal institution that has obtained the appraisal qualification.

Website of Taiyuan Construction Project Bidding Information Network:/default.aspx.

For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.