Job Recruitment Website - Job seeking and recruitment - Where should the rural bean curd residue project be reported?

Where should the rural bean curd residue project be reported?

You can report to the local quality inspection department (Quality Supervision Bureau, Quality Inspection Bureau).

If there is a quality problem, we must first determine whether it is within the housing quality warranty period, then negotiate with the developer and report it to the Construction and Communications Commission, Planning Bureau and other relevant departments for testing and filing. We need to find a professional organization for quality evaluation.

Consequences of unqualified project quality:

1. The construction unit shall be responsible for repairing the construction projects with quality problems or unqualified completion acceptance.

2. If the construction unit cuts corners during the construction, uses unqualified building materials, building components and equipment, or commits other acts that are not in accordance with the engineering design drawings or construction technical standards, it shall be ordered to make corrections, and a fine of more than 2% and less than 4% of the project contract price shall be imposed;

3. If the quality of the construction project does not meet the prescribed quality standards, it shall be responsible for rework and repair, and compensate for the losses caused thereby; If the circumstances are serious, it shall be ordered to suspend business for rectification, lower its qualification level or revoke its qualification certificate.

Legal basis:

civil law

Article 800

If the survey and design quality does not meet the requirements, or the survey and design documents are not submitted within the time limit, which delays the construction period and causes losses to the Employer, the surveyor and designer shall continue to improve the survey and design, reduce or waive the survey and design fees, and compensate for the losses.

Article 80 1

If the quality of the construction project is not in conformity with the contract due to the reasons of the builder, the employer has the right to require the builder to repair, rework or rebuild free of charge within a reasonable period of time. If the delivery is overdue after repair, rework or reconstruction, the builder shall bear the liability for breach of contract.