Introduction to the project of zhongjia iron and steel co., ltd.

The first phase project of China-Canada Iron and Steel Company built two 208m3 blast furnaces, two 24m2 belt sintering machines, two 3000kw gas generator sets and public auxiliary facilities, with a total investment of 654.38+65 billion yuan, and the foundation stone was laid in June 2002. At present, the trial production of 1 BF started at 6 am on April 17, 2003, and the first batch of molten iron was smelted at 0: 40 on April 18. Now it has entered normal production, and the cast iron machine has started production and operation at the same time. After the first phase of the project is completed and put into operation, it can achieve an annual output of 500,000 tons of pig iron and 800,000 tons of sinter. The product sales channels are reliable and stable, and the economic benefits are considerable. The annual output value is 850 million yuan, the profits and taxes are 654.38+0.4 billion yuan, and the profits are 654.38+0.3 billion yuan.

The second phase of the project has a total investment of 950 million yuan, covering an area of 1980 mu; It is planned to build 130m2 sintering machine, two 380m3 blast furnaces, two 30t oxygen top-blown converters, 1 set of supporting billet continuous casting machine, 1 set 10000m3/h oxygen generator and two 6000 kw gas generators, so as to realize the annual output of 100.

After the second phase of the project is put into production, the main products are 6,543,800 tons of pig iron and 6,543,800 tons of steel (including 500,000 tons of billet and 500,000 tons of slab). Other supporting products include: sinter 65.438+0.4 million tons, power generation 65.438+0.5 billion kWh, and cement raw material iron slag 500,000 tons.