Job Recruitment Website - Job seeking and recruitment - Brief introduction of Laibin Power Plant of Guangxi Fiona Fang Electric Power Co., Ltd.

Brief introduction of Laibin Power Plant of Guangxi Fiona Fang Electric Power Co., Ltd.

Laibin Power Plant is located in Henan Industrial Park, Laibin City, Guangxi, covering an area of 458 mu. It was built by self-financing during the Seventh Five-Year Plan period in Guangxi. The 2× 125MW unit of the first phase project started on 1987 1.6, and the two units started on 1989 and 1990 respectively. 2 1 century, with the development of society and the progress of the times, the high energy consumption characteristics of 125MW units have become the bottleneck restricting the development of enterprises. In order to enhance the overall strength of the power plant, improve the equipment level and enhance the competitiveness of enterprises, Guangxi Fiona Fang Electric Power Co., Ltd. started the reconstruction and expansion project of 2×300MW units in Laibin Power Plant in February 2004. 20 10 February, in order to comply with the requirements of the scientific development strategy of Guangxi Investment Group Co., Ltd., the 2× 125MW unit of Laibin Power Plant was officially shut down. At present, the total installed capacity of Laibin Power Plant is 600MW.

Guangxi Fiona Fang Electric Power Co., Ltd. was jointly established by Guangxi Investment Group Co., Ltd., Guangxi Guidong Electric Power Co., Ltd., Liuzhou Investment Holding Co., Ltd., Guangxi Baise Electric Power Co., Ltd. and Guangxi Guiwu Fuel Co., Ltd. When the company was established, its total net assets were 65.438+23.2 million yuan and its registered capital was 800.8 million yuan. Existing assets include 50% equity of Laibin Power Plant of Guangxi Fiona Fang Electric Power Co., Ltd., 90% equity of Guizhou Qiangui Power Generation Co., Ltd., Guangxi Kaitou Fuel Co., Ltd. and 73% equity of Guangxi Liuzhou Power Generation Co., Ltd.