How to write a model essay on the environmental protection acceptance application report?
The environmental protection acceptance application report can be divided into three parts. First, it can describe the general situation of environmental protection projects; Second, it can describe the contents of the inspection; Third, it can describe the standards of environmental protection acceptance.
Template of environmental protection acceptance application report 1
Lin 'an Environmental Protection Bureau:
This is to certify that Hangzhou Lin 'an _ _ Co., Ltd. was approved by environmental protection on _ _ _ _ _ 200, and has been put into trial production since _ _ _ _ 200, with the approval number of Lin 'an Environmental Protection [200 _] or the reply number of the registration form of [200_] _ _; Project name: how many tons (pieces) are produced each year; Address:-; Contact person:-; Tel:-. According to the approval of EIA, our company has entrusted _ _ _ environmental protection company to carry out planning and design, and carried out the following environmental management work according to the design requirements:
1. Waste water: rainwater and sewage are separated in the plant area, and the rainwater is connected to the rainwater ditch (pipeline) outside the plant for discharge; Domestic wastewater "If there is no production wastewater in the enterprise, (canteen wastewater will be treated by oil tank and put into the buried sewage treatment device), and other domestic wastewater will be discharged after being treated by the three-grid buried sewage treatment device", and the production wastewater will be discharged after being treated by the _ _ _ _ method. After pretreatment, the wastewater from enterprises in the park reaches the acceptance standard (with a copy of the wastewater acceptance agreement), and it will be incorporated into the sewage pipe network of the park together with domestic wastewater.
2. Waste gas: the waste gas generated in the _ _ process is collected by the fan, treated by the _ _ adsorption purification device, and discharged through the chimney with the height of _ _; After being treated by water film dust collector, the boiler exhaust gas is discharged through a chimney with a height of _ _ meters. The dust removal wastewater is recycled after being added and precipitated in a three-grid sedimentation tank, and is not discharged.
3. Noise: The machinery and equipment have been installed with shockproof and soundproof pads, and all doors and windows in the workshop are soundproof by sound insulation glass. In the process of production and processing, doors and windows are tightly sealed to ensure that the noise reaches the standard.
4. Solid waste: (1), industrial waste: comprehensive utilization after classified collection; (2) Domestic garbage: After unified collection, it will be collected and treated regularly by the sanitation department.
4. Dust: discharged after being collected and treated by _ _ _ _ dust removal facilities.
5. Canteen lampblack: A lampblack purifier has been installed, and the generated lampblack waste gas is discharged at high altitude after being treated by the purifier (or there is no canteen in this project).
Now all of them are in place, and now we apply to your bureau to organize the completion acceptance monitoring of the environmental protection facilities supporting the construction project of our company. (Attached with EIA materials and approval documents, the enterprises in the park need to provide a sewage management agreement), and I hereby report it!
Hangzhou Lin 'an _ _ Co., Ltd. (Seal)
_ _ _ _ _ _ _ _ _ _ _ 00
Note: 1. Tel: 6 1070325. Tel: 63700986.
6372752 16372 1509
2. This report is made in duplicate, one for the monitoring brigade and one for the monitoring station.
Demonstration report on environmental protection acceptance application II
Environmental Protection Acceptance of Domestic Waste Incineration Power Generation Project in
Ask for instructions
_ _ Provincial Environmental Protection Department:
With the cordial care and strong support of leaders at all levels in provinces, cities and districts, the approved _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ On May 28th, 20 12, the first boiler and a machine started trial operation. Generally speaking, the project is constructed in accordance with the requirements of EIA approval and EIA report. After half a year's debugging and rectification, it has basically met the acceptance conditions. Now I apply to your bureau for acceptance and report the main situation as follows.
I. Project background
The project was approved by the Development and Reform Commission of Hebei Province. 20__ 1074, expansion of reserved site of lubei district Yao Gang thermal power plant, talking about food and domestic waste incineration project. During the preliminary preparation and construction of the project, * * * strived for 48 million yuan of national debt funds, including 85 million yuan of special funds from the central budget and local budgets: the project was completed in 2006. After the kiln thermal power plant completed the construction drawing design and started construction for one and a half years, due to the change of external economic situation, _ _ city revised the overall plan. The original construction site was planned as a wetland reserve, and the project stopped construction: in April 2009, according to the requirements of the overall planning of _ _ _, the project resumed work in different places. The total scale is changed to 65,438+0,500 tons of garbage/day. According to the spirit of the minutes of the special meeting of the municipal government on April 20, 2009, _ _ Xinfeng Thermal Power Group Co., Ltd. is responsible for comprehensively receiving the waste incineration project built by _ _ Jiecheng Energy Co., Ltd.
Second, the project overview
This project is not located in _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 12.5% of the total investment.
Three. Completion of environmental facilities
_ _ Shanwei Energy Co., Ltd. is responsible for the construction of waste incineration project, based on the feasibility study report and preliminary design approval, in strict accordance with the requirements of EIA report and EIA approval. At present, all the environmental protection facilities in the factory have been completed, which are briefly described as follows.
(1) unloading hall
The garbage unloading platform is set indoors. On the 8.00mm floor of the main building, the unloading platform is equipped with a special garbage truck entrance, the unloading floor is 10, and the platform width is 24m. Under the condition of not affecting the operation of other vehicles, it can meet the requirements of driving, turning around and unloading of the largest garbage transfer vehicle. The garbage unloading platform meets the requirements of flushing and seepage prevention, and electric shutter doors and air curtain walls are installed above the entrance and exit of the platform to prevent odor from spreading.
(2) Garbage storage tank
The total effective volume of the garbage storage tank is 17955m, which can store more than 7,000 tons of garbage, meeting the amount of garbage incineration in 5-7 days. The concrete panels of the garbage storage pool and garbage leachate collection pool shall be impervious to prevent leachate leakage and groundwater infiltration.
The upper part of the garbage storage tank is provided with the air inlets of the primary fan and the secondary fan of the incinerator to keep the garbage storage tank in a negative pressure state. An emergency fan is installed in the tarpaulin of the garbage storage tank. In the case of downtime or unexpected accidents, the gas in the garbage storage tank can be treated by the activated carbon adsorption device at the top of the factory building and then discharged into the atmosphere to avoid odor escape.
(3) Slag bin
The effective volume of the slag bin is 1225m, and the amount of slag stored for 7 days. Equipped with bag dust collector and chimney, chimney height15m.
(4) Lime silo
The lime storage bin is set according to the lime consumption of three flue gas purification lines and the three-day inventory. Storage box V= 130m? . Equipped with bag dust collector and chimney, chimney height15m.
(5) storage of activated carbon
Set up three activated carbon storage bins, one for each line, with a volume of 5m? According to the consumption of activated carbon for 5 days. . The exhaust port is connected with the bag dust collector of the lime bin.
(6) fly ash storage bin
Considering the two-day reserve of three lines, the fly ash is set at 800m? Two warehouses. Equipped with a bag filter and a 29-meter-high chimney.
(7) landfill leachate treatment system
The process of "dynamic anaerobic+membrane bioreactor (MRB)+ primary sodium filtration (NF)+ primary low pressure reverse osmosis (RO)" was adopted to treat landfill leachate.
At present, a 300t/d leachate treatment workshop has been built, and the treatment effect has reached Class A standard (GB 189 18-2002). 70% of the treated water is used as supplementary water for greening, spraying pavement and water tower, and the remaining 30% concentrated solution is reinjected into the boiler for incineration. Domestic sewage enters the leachate treatment workshop for treatment through septic tanks and domestic sewage pools.
(8) Garbage incineration system
The process adopts circulating fluidized bed waste incineration boiler, and the furnace burns according to the principle of "three highs", that is, high temperature, high disturbance and high residence time. Furnace combustion is not less than
The residence time of flue gas at 850℃ is more than 3.5 seconds to suppress and reduce the contents of dioxin and CO in flue gas. The big slag in the slag discharged under the bed is discharged outside, and the rest is sent back to the furnace for use.
(9) Pharyngeal gas purification system
The flue gas treatment of incinerator adopts the waste gas treatment process of "combustion control+semi-dry washing+activated carbon adsorption+bag dust removal", and the alkaline semi-dry reactant raw lime milk is used as adsorbent to adsorb acidic components in flue gas; At the same time, the porosity of powdered activated carbon and its toxic components such as heavy metals are reduced to the standard range, the dust removal rate is 99.5%, and the desulfurization rate by adding limestone is more than 85%. On-line monitoring of chimneys has been networked with the Municipal Environmental Protection Bureau to realize real-time monitoring.
(10) water supply and drainage system
Chengnan Sewage Treatment Plant in Fengnan District of this city uses reclaimed water as designed. According to the requirements of EIA, the reclaimed water pipeline and sewage pipeline are also laid to Chengnan Sewage Treatment Plant.
(1 1) solid waste treatment
Dangerous solid waste is fly ash, and general solid waste is slag and domestic garbage.
(1) Hazardous solid waste:
Fly ash: the dust collected by flue gas dust removal at the outlet of the incinerator is transported to the ash bin by pneumatic force, and then transported out by closed tank car, at Xushankou Hazardous Waste Treatment Station in Funing.
(2) General solid waste:
Slag: solid waste discharged from the furnace bed after garbage and coal are burned in the incinerator, cooled by the slag cooler, transported to the slag bin by the slag conveyor and sold to Changzhou Baojiang burden processing Co., Ltd. ..
Domestic garbage: collected and sent to the incinerator for incineration.
(12) noise control
In the design and construction of our company, noise pollution sources were reduced by taking measures such as sound insulation, installing muffler, foundation damping and flexible connection of pipelines.
(13) Plant greening
At present, the actual investment of our company in greening is 200,000 yuan, and the greening area is about 50_. After the project is put into production, our company will further improve the ecological environment of the factory through greening.
I hereby apply to the Provincial Environmental Protection Department for environmental protection acceptance of this project.
Ask for your advice
Shanwei energy group company
May 20(th), 2006
Demonstration report on environmental protection acceptance application 3
Environmental Protection Acceptance of Domestic Waste Incineration Power Generation Project in
Ask for instructions
_ _ Provincial Environmental Protection Department:
With the kind care and strong support of leaders at all levels in provinces, cities and districts, the approved _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ On May 28th, 20 12, the first boiler and a machine started trial operation. Generally speaking, the project is constructed in accordance with the requirements of EIA approval and EIA report. After half a year's debugging and rectification, it has basically met the acceptance conditions. Now I apply to your bureau for acceptance and report the main situation as follows.
I. Project background
The project was approved by the Development and Reform Commission of Hebei Province. 20__ 1074, expansion of reserved site of lubei district Yao Gang thermal power plant, talking about food and domestic waste incineration project. During the preliminary preparation and construction of the project, * * * strived for 48 million yuan of national debt funds, including 85 million yuan of special funds from the central budget and local budgets: the project was completed in 2006. After the kiln thermal power plant completed the construction drawing design and started construction for one and a half years, due to the change of external economic situation, _ _ city revised the overall plan. The original construction site was planned as a wetland reserve, and the project stopped construction: in April 2009, according to the requirements of the overall planning of _ _ _, the project resumed work in different places. The total scale is changed to 65,438+0,500 tons of garbage/day. According to the spirit of the minutes of the special meeting of the municipal government on April 20, 2009, _ _ Xinfeng Thermal Power Group Co., Ltd. is responsible for comprehensively receiving the waste incineration project built by _ _ Jiecheng Energy Co., Ltd.
Second, the project overview
This project is not equipped with (1_12+1_ 25) MW turbo-generator set in the northeast of Jianzigu landfill site in _ _ _ _ _ _ _ _ _ _ _ _ _ _, with a total investment of 440 million yuan. 12.5% of the total investment.
Three. Completion of environmental facilities
_ _ Jiecheng Energy Co., Ltd. is responsible for the construction of waste incineration project, based on the feasibility study report and preliminary design approval, in strict accordance with the requirements of environmental assessment report and approval. At present, all the environmental protection facilities in the factory have been completed, which are briefly described as follows.
(1) unloading hall
The garbage unloading platform is set indoors. On the 8.00mm floor of the main building, the unloading platform is equipped with a special garbage truck entrance, the unloading floor is 10, and the platform width is 24m. Under the condition of not affecting the operation of other vehicles, it can meet the requirements of driving, turning around and unloading of the largest garbage transfer vehicle. The garbage unloading platform meets the requirements of flushing and seepage prevention, and electric shutter doors and air curtain walls are installed above the entrance and exit of the platform to prevent odor from spreading.
(2) Garbage storage tank
The total effective volume of the garbage storage tank is 17955m, which can store more than 7,000 tons of garbage, meeting the amount of garbage incineration in 5-7 days. The concrete panels of the garbage storage pool and garbage leachate collection pool shall be impervious to prevent leachate leakage and groundwater infiltration.
The upper part of the garbage storage tank is provided with the air inlets of the primary fan and the secondary fan of the incinerator to keep the garbage storage tank in a negative pressure state. An emergency fan is installed in the tarpaulin of the garbage storage tank. In the case of downtime or unexpected accidents, the gas in the garbage storage tank can be treated by the activated carbon adsorption device at the top of the factory building and then discharged into the atmosphere to avoid odor escape.
(3) Slag bin
The effective volume of the slag bin is 1225m, and the amount of slag stored for 7 days. Equipped with bag dust removal
And15m high chimney.
(4) Lime silo
The lime storage bin is set according to the lime consumption of three flue gas purification lines and the three-day inventory. Storage box V= 130m? . Equipped with bag dust collector and chimney, chimney height15m.
(5) storage of activated carbon
Set up three activated carbon storage bins, one for each line, with a volume of 5m? According to the consumption of activated carbon for 5 days. . The exhaust port is connected with the bag dust collector of the lime bin.
(6) fly ash storage bin
Considering the two-day reserve of three lines, the fly ash is set at 800m? Two warehouses. Equipped with a bag filter and a 29-meter-high chimney.
(7) landfill leachate treatment system
The process of "dynamic anaerobic+membrane bioreactor (MRB)+ primary sodium filtration (NF)+ primary low pressure reverse osmosis (RO)" was adopted to treat landfill leachate.
At present, a 300t/d leachate treatment workshop has been built, and the treatment effect has reached Class A standard (GB 189 18-2002). 70% of the treated water is used as supplementary water for greening, spraying pavement and water tower, and the remaining 30% concentrated solution is reinjected into the boiler for incineration. Domestic sewage enters the leachate treatment workshop for treatment through septic tanks and domestic sewage pools.
(8) Garbage incineration system
The process adopts circulating fluidized bed waste incineration boiler, and the furnace burns according to the principle of "three highs", that is, high temperature, high disturbance and high residence time. Furnace combustion is not less than
The residence time of flue gas at 850℃ is more than 3.5 seconds to suppress and reduce the contents of dioxin and CO in flue gas. The big slag in the slag discharged under the bed is discharged outside, and the rest is sent back to the furnace for use.
(9) Pharyngeal gas purification system
The flue gas treatment of incinerator adopts the waste gas treatment process of "combustion control+semi-dry washing+activated carbon adsorption+bag dust removal", and the alkaline semi-dry reactant raw lime milk is used as adsorbent to adsorb acidic components in flue gas; At the same time, the porosity of powdered activated carbon and its toxic components such as heavy metals are reduced to the standard range, the dust removal rate is 99.5%, and the desulfurization rate by adding limestone is more than 85%. On-line monitoring of chimneys has been networked with the Municipal Environmental Protection Bureau to realize real-time monitoring.
(10) water supply and drainage system
Chengnan Sewage Treatment Plant in Fengnan District of this city uses reclaimed water as designed. According to the requirements of EIA, the reclaimed water pipeline and sewage pipeline are also laid to Chengnan Sewage Treatment Plant.
(1 1) solid waste treatment
Dangerous solid waste is fly ash, and general solid waste is slag and domestic garbage.
(1) Hazardous solid waste:
Fly ash: the dust collected by flue gas dust removal at the outlet of the incinerator is transported to the ash bin by pneumatic force, and then transported out by closed tank car, at Xushankou Hazardous Waste Treatment Station in Funing.
(2) General solid waste:
Slag: solid waste discharged from the furnace bed after garbage and coal are burned in the incinerator, cooled by the slag cooler, transported to the slag bin by the slag conveyor and sold to Changzhou Baojiang burden processing Co., Ltd. ..
Domestic garbage: collected and sent to the incinerator for incineration.
(12) noise control
In the design and construction of our company, noise pollution sources were reduced by taking measures such as sound insulation, installing muffler, foundation damping and flexible connection of pipelines.
(13) Plant greening
At present, the actual investment of our company in greening is 200,000 yuan, and the greening area is about 50_. After the project is put into production, our company will further improve the ecological environment of the factory through greening.
I hereby apply to the Provincial Environmental Protection Department for environmental protection acceptance of this project.
Ask for your advice
The above is what Bian Xiao shared today, and I hope it will help everyone.
- Related articles
- Xiaoyi city Jinbiao Electric Appliance Sales Co., Ltd. Recruitment information, how about xiaoyi city Jinbiao Electric Appliance Sales Co., Ltd.
- Time, Tickets and Place of Tulip Flower Show in Taiyuan Hu Jinyang Park
- Copywriting content about epidemic propaganda
- What state-owned enterprises are there in Binzhou City, Shandong Province?
- Is it reliable for Dongguan Shengyuan Real Estate to recruit drivers?
- Online industrial and commercial registration: What should I do next after the company is registered successfully?
- When does the bus from due west of b depart?
- Is it fair for Qingdao trade unions to recruit social workers?
- Did anyone die in Lushi Expressway construction team?
- Which district is Cangzhou Normal College in?