Thermal power plant, electrical maintenance, what is the main interview, what professional knowledge is involved, and written test topics.
Part of the test questions: fill in the blanks
1. The energy conversion process of thermal power plant is energy () energy () energy () energy.
2. When the current transformer is in normal operation, the secondary side is not allowed ().
3. There are three forms of conductor heat dissipation: (), () and ().
4. Thermal power plants are divided into () power plants and () power plants according to the output energy.
5. When checking the dynamic stability of rectangular hard conductor, when each phase is a single rectangle, the purpose of engineering calculation is: when each phase is multiple rectangles, the purpose of engineering calculation is:
6. According to the running state, self-starting can be divided into: (), () and ().
7. The auxiliary power standby mode of power plant, compared with the open standby mode, the capacity of auxiliary working transformer (). (Fill in increase or decrease)
8. The only purpose of installing the bypass bus is ().
9. Auxiliary power supply includes (), () and ().
- Previous article:Which district does Guiping Chang 'an Industrial Park belong to?
- Next article:What is the file phone number of Xiamen Talent Center?
- Related articles
- Where is Quanzhou Shimao City?
- Is it meaningful to choose a location for Chongqing STO Express Distribution Center?
- What is the CBRC? Is it a civil servant?
- Which department is good for Huaming lamps?
- Which community does Hyatt Regency Wuhan Optics Valley belong to?
- What automotive wiring harness factories are there in Hefei?
- What professionals do foreign companies generally need?
- Does anyone know who this Tong Mo is?
- 2 1 1 treatment of graduate students in Xianggang
- Is Taihe Chemical worth going to work?