The installation process of water heating radiator is as follows

Field measurement design

First, carry out field measurement and design with the technicians of radiator manufacturers to determine the radiator model, quantity, water inlet and outlet mode and specific installation location. Technicians will communicate with the owner according to the actual situation.

Sign the construction agreement

Sign a construction agreement with the radiator construction unit to ensure the construction quality and risk, and the general construction unit shall indicate it in the construction agreement.

Phase I project construction

The first stage construction of radiator installation. Radiator installation is divided into two steps: the first phase and the second phase. The first-phase heating project includes positioning of heating equipment, slotting, pipeline laying (or pipeline reconstruction), pipeline connection (welded pipe), installation of water collector and separator, pressure test, etc.

Phase II project construction

Construction of the second phase of radiator installation. After the decoration of the customer's home is completed and the wall has been painted or pasted with wallpaper, the wooden floor can be carried out after the second-phase project construction, radiator installation, installation and pressing test are qualified.