What is the construction application process of Xi 'an construction project?

application and approval procedures for the development and construction of residential projects

1. Make a feasibility study report and an application for establishing a project for the land acquisition and development projects, and then apply to the Planning and Development Committee for establishing a project.

2. report to the planning technology department of the planning bureau with the land transfer contract, and obtain the red line map of the construction project planning after surveying and mapping by the planning surveying and mapping team.

III. Report the overall planning scheme to the Planning Management Office of the Planning Bureau for approval, and obtain the construction land planning permit after passing.

iv. if a plan is implemented in batches after the master plan is adopted, the detailed plan and the corresponding single building design to be implemented by stages will be reported to the Planning Management Office of the Planning Bureau for approval.

5. During the four-stage examination and approval period, all fee collection departments will complete the examination and approval of payment transfer, including fire protection, construction, education and local facilities, health and epidemic prevention, termite prevention, greening, civil air defense, wall renovation, bulk cement, urban construction archives and engineering quality supervision. The specific procedures are as follows:

1. Submit all drawings of single buildings within the scope of approval to the local fire department for fire control review, and obtain fire control opinions of construction projects.

2. Pay the construction fees at the Planning and Finance Department of the local construction bureau.

3. Pay the surcharge for educational facilities at the Planning and Finance Department of the local education bureau.

4. Go to the local health and epidemic prevention station to review the health and epidemic prevention of the construction project and pay the health and epidemic prevention inspection fee.

5. make an agreement with the termite prevention institute of the local housing authority to pay the termite prevention fee.

6, according to the provisions of the greening rate of the whole construction project planning, the project will be specially designed for greening, and the greening report will be sent to the Garden Administration for approval.

7. Make the civil air defense plan of the project according to the requirements of local civil air defense facilities, and then submit the application for the establishment of the civil air defense plan and civil air defense project to the local civil air defense office for approval.

8. Pay the new wall renovation fee and bulk cement fee to the local economic commission.

9. Go to the local urban construction archives to sign the construction project file transfer agreement.

1. Go to the quality supervision station of the local construction bureau to sign the quality supervision agreement of the construction project and pay the project quality supervision fee.

VI. After the above procedures are completed, apply for a construction project planning permit at the Planning Management Office of the Planning Bureau.

VII. After receiving the construction project planning permit, send the construction drawings of all single buildings to the Technical Department of the Construction Bureau and the construction drawing review center for review. After passing the examination, he will receive the approval letter for the examination and approval of construction drawings.

8. If the investor (the controlling party of the project) is a state-owned asset, the construction project must be publicly tendered through the local bidding office, and a bid-winning notice will be issued to the successful construction unit.

9. Apply for the construction permit of the construction project at the Construction Management Office of the Construction Bureau with the approval letter of the construction drawing review and the bid-winning notice of the construction unit.

1. With the construction permit of the construction project and the relevant information of the commercial housing price check, send it to the local price department for the pre-sale price check of commercial housing.

Xi. Obtain the pre-sale permit of commercial housing from the development office of the local construction bureau (or the real estate market office of the Housing Authority) with the construction permit and pre-sale approval documents.

XII. After signing the land transfer contract, obtaining the project approval and the construction land planning permit, declare the place names at the place name management office of the local civil affairs bureau.

XIII. Professional pipelines include: power supply, tap water, gas, telecommunications, cable TV, street lamps, municipal roads, rainwater and sewage pipe networks. After the overall planning and design of the project is approved, a planning and design unit will carry out pipeline planning and design for all professional pipelines of the whole project, and the design results will be sent to the municipal planning management office of the Planning Bureau for review. After passing, the pipeline planning drawings will be sent to the above-mentioned professional departments to listen to the opinions of various departments. Then the construction unit, together with the relevant personnel of the Planning Bureau, will convene a coordination meeting of pipeline planning in various professional departments, and the opinions of all professional departments will be formed into meeting minutes, so as to prevent the professional pipelines from wrangling with each other and colliding with each other in concrete implementation.