Why is Beijing Metro Line 3 dusty?

For various reasons.

Metro Line 3, like 1 and Line 2, is one of the earliest planned lines in Beijing. 1956, five Soviet experts came to Beijing and guided the drawing of the earliest Beijing subway plan based on their experience in building the Moscow subway. Line 3 appeared for the first time, running from north to south and crossing Deshengmen.

When Dongsishitiao Station of Line 2 was built at 197 1, the platform and station hall of Line 3 were reserved under the station hall, that is, "Dongsishitiao Station".

With the development of urban construction, subway planning is gradually adjusted. From 65438 to 0973, the planning of Beijing subway developed from "one ring and two lines" to eight lines, and the planning of Line 3 was adjusted accordingly.

However, due to various reasons, the construction of Line 3 has not started. On the contrary, several other subway lines were opened one after another, and Line 3 gradually disappeared from people's sight. It was not until the 20 15 version of Beijing subway planning that this old line reappeared.

Extended data

Beijing subway line 2 is one of the busiest subways in Beijing. Every day, nearly a million people go to their work or life destinations through this traffic line. Scattered subways, like "arteries" extending underground in the city, have expanded everyone's living radius. On October 25th, 2020165438+/KLOC-0, a crossing operation was quietly going on.

During the construction of Dongsishitiao Station of Metro Line 3, only 18 new structures cross the existing line, which is equivalent to 18 crossing points. It is the most complicated existing line crossing project in Beijing at present. The more intersections there are, the more times the existing line may be disturbed, and special attention should be paid to each interference.

Ganlong Com- The most mysterious Beijing Metro Line 3 has made new progress! The "hardest step" is expected to be completed in early February 65438.

The most difficult section of People's Network-the main structure of Beijing Metro Line 3 has been fully started.