Job Recruitment Website - Job information - Woodworking contract standard
Woodworking contract standard
According to the standard of woodworking contract mode, contract is one of the ways for modern people to safeguard their own interests. If one party violates the contract, the other party may bring legal proceedings. The following is the standard of woodworking contract model, for your reference only!
Woodworking contract standard 1
Party A: (hereinafter referred to as Party A)
Party B: (hereinafter referred to as Party B)
Through negotiation between Party A and Party B, Party A will contract the project to Party B for one-time construction, including contractor, formwork, nails, iron wires, cables, chainsaws and all cable tools of machinery, and all woodworking works on the drawings will be returned after the project is completed.
First, the contract unit price; The unit price of woodworking project contracted by Party B is () yuan/㎡ (including basement facilities and main body of N-shaped line on sloping roof), which is the final settlement price. Party A does not add any extra expenses to Party B, and the area calculation shall be subject to the drawings.
Second, the scope of contracting; Party B shall complete all carpentry work of this project according to the design drawings and design changes (including carpentry and infrastructure preparation for auxiliary sporadic projects), and be responsible for the cleaning and stacking of all templates, square timber, top timber and square timber. According to Party A's requirements after the project is completed),
Three. Party B is responsible for:
1, Party B is responsible for organizing the technical workers and auxiliary materials of mechanical tools needed for this project, being familiar with the specifications of construction drawings, and planning and constructing according to the national quality standards according to the design drawings, construction specifications and safety production regulations.
2. Obey the unified command, deployment and inspection of project managers and builders, and abide by various rules and regulations. Party A's raw materials are not allowed to be wasted at will. If Party B is found to waste at will, Party A has the right to ask Party B to double indemnity at the original price.
3. Party B shall not unreasonably disobey the unified command and dispatch of Party A's site management personnel, and prevent other construction teams from carrying out construction on the construction site. If Party B finds a fine of 500 yuan once, and refuses to change it for many times, Party A has the right to unilaterally terminate the contract, and Party B will settle accounts according to 60% of the actual completed works and automatically quit.
4. During the main construction period, Party B shall complete the construction task on time, with good quality and quantity, and there shall be no wood explosion or slurry leakage. If a fine of 50-200 yuan is found, it shall be dealt with immediately. In case of rework due to unqualified acceptance of carpentry, Party A has the right to demand all the wasted raw materials in double indemnity and the labor wages required for rework with the cooperation of other construction teams. Party B shall deal with it in time, and the final project needs to be installed on call. Otherwise, Party A has the right to ask others to do it for him, and his salary will be deducted from the unpaid project payment by Party B at twice the market price. If the construction period is affected, it shall be punished according to the contract, and Party B has no objection.
Four. Party A is responsible;
1, responsible for technical disclosure of Party B's drawings and three-level safety education, guiding and checking the construction quality of Party B's construction process,
2. Pay the project payment on time as agreed in the contract.
3. Provide Party B with water and electricity for accommodation and living free of charge (excluding electricity for induction cookers).
Five, time limit for a project requirements;
1, Party B shall carry out the construction in strict accordance with the various construction progress plans formulated by the project department, and the specific progress plan shall be subject to the construction progress plan formulated by the project department.
2. If Party B fails to complete the engineering quantity within the construction period according to Party A's schedule, Party A has the right to ask outsiders for help at a high price, and Party B has no right to obstruct it. His salary will be deducted from Party B's progress payment, and he will be fined 500-5000 yuan for each day of delay in the construction period. Party B shall complete the project ahead of schedule according to the construction progress and reward it.
3. If the project is shut down for more than three days due to Party B's reasons, Party A has the right to unilaterally terminate the contract and find another construction team, and make settlement according to 60% of the actually completed engineering quantity. The settlement time is after the main body of the project is capped, and the rest will be used as the loss expenses for Party A to reorganize the new team.
Sixth, quality standards;
The specifications conform to the construction drawings, design change notice and current national mandatory specifications, and meet the national engineering quality acceptance standards. If rework causes material waste or delay in construction period to Party A, Party A has the right to pursue its compensation responsibility and impose a fine, and the expenses will be deducted from Party B's salary.
Seven, safety requirements;
1, Party B's workers must abide by the safety operation rules when entering the construction site, and wear safety helmet, work clothes and rubber shoes to work.
2, don't drink, play during working hours, strictly implement the laws and regulations of production safety, and the project department shall organize the necessary safety knowledge lecture content disclosure, construction,
3. If a safety accident occurs due to Party B in the construction process, all responsibilities and expenses shall be borne by Party B, and it shall be handled afterwards, which has nothing to do with Party A..
4, don't wear a helmet, slippers, drinking to work, found that each fine 30 yuan, this paragraph is deducted from the salary, and informed criticism, the scene it is forbidden to bring children or other social personnel into the site, accommodation, overnight stay,
8. Payment method; This project pays 80% according to the third floor of the total quantity for the first time, then pays 80% according to the monthly progress of the quantity, and the balance will be settled within two months after completing the work agreed in the contract.
IX. For matters not covered in this contract, both parties may supplement it through consultation at any time according to the situation, and the supplementary agreement has the same effect as this contract.
X. This contract shall come into effect as of the date of signature, and the legal effect of this contract will automatically terminate after the project is completed and all the project funds are settled.
XI。 This agreement is made in duplicate, each party holds one copy, which has corresponding legal effect.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Woodworking Contract Standard 2 Party A and Party B:
According to the needs of construction, Party A subcontracts the project to Party B for construction in the way of contracting and not contracting materials. In order to facilitate the cross management of construction work between teams, clarify the rights, responsibilities and obligations of both parties in the performance process, ensure the construction quality of subdivisional work, strengthen the control of construction progress, and ensure the smooth progress of the project, this contract is hereby concluded through consultation between both parties for mutual compliance.
I. Project name:
Second, the project site selection:
Three. Scope of contract:
Within the scope of the construction drawing, all the construction contents, all the drawing changes and technical changes during the construction process (including before construction) of the frame main formwork project have been included in the contract scope.
Iv. contents of the project:
Template production, installation, template removal, cleaning, classified stacking, plate cleaning, plate gap sealing treatment, nailing and other template construction processes. After the completion of the project, reusable materials should be cleaned, classified and piled up.
Five, the project contracting way:
1. This project is contracted in the form of contracting without materials (i.e. labor, quality, progress, safety, civilized construction and material saving). Party B is responsible for portable electric tools and hand tools.
2, according to the construction drawings, including the template engineering changes and other parts of the labor costs according to the actual area of valuation.
Six, quality requirements:
Strictly require the construction according to the drawing, which meets the specification requirements and the quality grade must meet the requirements.
1. The formwork and its support must have sufficient rigidity, strength and stability, and the supporting part of its support must have sufficient supporting area. The leaking slurry is cleaned by the woodworking team. When pouring concrete, carpenters must assign special personnel to guard the formwork, and the slurry leakage should be washed with water, otherwise 200 yuan will be fined every time.
Seven, the construction period:
Party B's construction must meet the needs of assembly line operation, complete Party A's progress on time, and shall not delay the construction progress of other teams due to its own reasons.
Eight. Payment terms:
Nine, project management responsibilities:
A. Party A's responsibilities
1, provide effective construction drawings and deal with construction technical problems;
2. Provide external scaffolding and safety net;
3. Be responsible for coordinating and dealing with the contradictions arising from the crossover operation of each operation team and other situations on the construction site, and try to avoid rework and repair due to inadequate cooperation. Party B must obey the handling opinions of Party A;
4. Provide template materials to the site in time;
5, responsible for the template engineering quality tracking inspection and quality supervision, responsible for the template component project quality evaluation and acceptance;
6. According to the requirements of specifications, standards, contracts and construction drawings, Party A is the final confirmer of the quality of sectional works and divisional works;
7. Organize relevant personnel to measure the smoothness, verticality, slag inclusion and slurry leakage of concrete surface in time after formwork removal, conduct quality evaluation according to the current acceptance specifications and evaluation standards, and take the actual evaluation results as the basis for rewarding and punishing the installation quality of Party B's formwork;
8. Provide construction water, electricity, night construction lighting and temporary accommodation for field workers;
9. Pay the project payment according to the schedule agreed in the contract.
B. Party B's responsibilities
1, before construction, you must be familiar with the drawings and make safety technical disclosure to the workers. All workers must be skilled workers, and the operation of special types of work must hold relevant certificates. Abide by laws and regulations, Party A's rules and regulations and management regulations, obey the command of Party A's construction management personnel, and do not embarrass Party A's personnel for any reason;
2, familiar with the drawings, according to the requirements of the drawings in advance with good template, try to reduce redundant materials;
3, found in the process of construction drawings design problems, timely report to Party A's foreman, shall not change the design without authorization;
4. Party B shall pay attention to the maintenance of large construction tools and machinery provided by Party A during use, compensate for improper operation and man-made damage, and be responsible for safety accidents;
5. Prepare the material plan in advance according to the drawings and process requirements, and submit it to the foreman of Party A for approval;
6. Party B must strictly abide by the operating rules of safety technology and relevant safety laws and regulations, and the responsibility for safety accidents caused thereby shall be borne by Party B;
6, civilized construction, completes the construction organization and management, carefully clean up the site after work, nail the template, material classification, neatly stacked. Pay special attention to check the stigma, beam groove, etc. And be sure to clean it up;
7. Arrange the carpenter's duty work during concrete pouring in advance, and check it regularly during concrete pouring. If deformation or looseness is found, it should be repaired and reinforced in time;
8. If the rework caused by unqualified quality or other negligence is Party B's responsibility, Party B shall bear the losses of machinery and materials caused thereby.
9. Coordinate the working procedures of relevant teams in the flow process, without making things difficult;
10, no trouble, no slander and no fighting at the construction site. Once all illegal acts are found, a fine of 100 yuan will be imposed. If the circumstances are serious, it will be handed over to the public security organ for handling.
1 1, use templates reasonably, and do not cut large templates at will without the consent of the competent foreman. Offenders will be fined more than 200 yuan every time depending on the seriousness of the case.
12. Any agreement or contract signed between Party B and a third party in this project shall be the responsibility of Party B, which has nothing to do with Party A, and Party A will not approve it.
13. During the construction process, Party B shall be responsible for all safety accidents (including third parties) caused by Party B's own reasons or violations.
14. Party A strictly forbids Party B to dismantle, modify or move the power distribution facilities without authorization, as well as to lose the power distribution facilities and violate the safe use of electricity, and all consequences shall be borne by Party B..
15. Party A forbids Party B to dismantle, modify or move the safety protection facilities without authorization, or damage the safety protection facilities or violate the safety operation, and all consequences shall be borne by Party B..
16. If Party A fails to use the safety helmet and safety belt when entering the construction site, it shall be ordered to make corrections and be fined by 50 yuan.
17. The person in charge of Party B must stick to the construction site, arrange work, direct management, and lead its employees to carry out construction according to Party A's requirements and relevant construction safety regulations, and ensure the quality and quantity according to the progress requirements. All losses and adverse social impacts caused by poor management and dereliction of duty shall be borne by the person in charge of Party B. If Party B fails to make rectification for three times, Party A has the right to terminate the agreement and the remaining project funds will not be settled.
X. engineering changes:
If the construction project is added due to the change of drawings or the construction content is greatly changed, and the cost is greatly increased, which cannot be described in the original contract terms, a supplementary agreement can be signed through negotiation.
XI。 Warranty liability:
During the warranty period, if Party A notifies Party B not to make rectification within a time limit, Party A will send another person to guarantee the warranty, and the expenses will be deducted from the warranty fund.
This agreement is made in duplicate, one for each party, and shall come into effect as of the date of signing.
Party A: Party B (construction responsible party):
Signing place:
Date of signature: year month day.
Woodworking Contract Standard 3 Employer: (hereinafter referred to as Party A)
Contractor: Woodworking Team: Team (hereinafter referred to as Party B)
Address:
ID number:
In order to ensure the implementation of the project department's plan, clarify the contracting tasks, responsibilities and contents, and give full play to the enthusiasm of the team, the carpentry formwork supporting work of some villa projects in * * theme park is contracted to Party B for construction in the form of contract cleaning. Through negotiation, both parties have reached the following agreement for mutual compliance.
I. Scope of Contract and Work Contents
1. Project contracting scope: calculated according to the construction area specified in the general construction instructions, the carpentry formwork project and the construction site scope in all drawings and contact sheets of this project.
2. The work contents include: erection and dismantling of the field operation shed, horizontal and vertical transportation on site, erection and dismantling of the formwork bearing frame [including steel pipe cutting (the cutting parts shall be the responsibility of Party A), formwork production, installation, reinforcement, dismantling, cleaning, recovery and finishing of coating isolation agent, rollers, tie rods, nuts and gaskets, and reserved holes (including reserved holes required for installation, which refer to holes constructed with wooden patterns). After the structure is completed, the formwork materials and accessories must be cleaned and hoisted to the ground, and sorted and stacked neatly at the place designated by Party A ... The working garbage of the woodworking class on the construction site, such as sawdust, broken slats, stones, etc. The carpentry class shall clean it in time and hoist it to the place designated by Party A. When cleaning on site, Party B shall not use any excuse not to clean it first when the garbage or building materials of all parties are mixed together. If extra work occurs, it shall be handled according to the contract.
3. Party B must enter the place designated by Party A according to the number of people required by the contract and start working normally.
Second, the unit price
According to the above work contents and the project quality meeting the contract requirements, according to the construction area of the project, villas L 1 1#, L 12# and L 13# are calculated as 45 yuan per square meter, and independent and single-family villas are calculated as 48 yuan per square meter. This unit price also includes the cost of auxiliary materials such as iron wire, nails and saw blades required for formwork support, as well as other expenses determined in this agreement; If the construction unit or project is shut down due to special circumstances, the price will remain unchanged, and the engineering quantity will be partially settled according to the actual completion.
Third, the quality requirements
1. Party B must carry out the construction according to the drawings and national codes and standards, so as to ensure that the appearance inspection and actual measurement of this project meet the requirements of excellent quality at the time of structural acceptance, and the actual measurement quantity meets the construction specifications and design requirements.
2, before the construction, must report the list of management personnel, shuttering construction scheme and quality assurance measures, organize capable field commanders, careful construction, to ensure the timely completion of the indicators issued by Party A..
3. When the concrete is cast, there must be a special person on duty under the guidance of the carpenter's monitor, and the attendant is cast, and it is not allowed to leave casually, otherwise 200 yuan will be fined. The losses caused by concrete deformation or formwork explosion due to formwork support shall be borne by Party B, with a fine of 500-2,000 yuan each.
4. Party B shall ensure that the concrete joints are smooth without obvious slurry leakage. The main parts such as the joints between columns and beams, stair construction joints, upper and lower joints of shear walls at stairs, upper and lower joints in elevator shafts, internal and external joints of basement exterior walls, floors, beam construction joints, corner columns of stair platforms, fences and floors, and joints between basement exterior walls and external columns shall be treated with foam rubber strip or other alternative materials. Wall and slab formwork joints shall be neat, reserved holes shall be vertical and flat, and there shall be no formwork explosion phenomenon, and there shall be no formwork explosion phenomenon in beam bottom Yang angle, column Yang angle and reserved hole Yang angle, constructional column and brick shall be connected neatly, and foam rubber strip shall be embedded in the joint. The formwork joint at the primary support position of the column shall not exceed 2mm, and the horizontal formwork joint shall not exceed 1 and 5mm.
Four, safe production and civilized construction
1. Party B must strictly implement the operating rules for safety production, observe the six disciplines and ten safety technical measures for safety production, keep in mind the "ten prohibitions" for safety production, adhere to the policy of "safety first, prevention first", implement the "safety standardization" demonstration project management, and put an end to safety accidents.
2. When starting work, all new workers must receive safety education before entering the site, complete the safety technical disclosure materials and examination papers issued by Party A, register the list of safety technical educators, and report to Party A. ..
3. Party B must have a full-time security officer, who is responsible for safe production and civilized construction, and make technical disclosure on safe production for all workers. Self-employed squad leaders and safety officers shall hold regular meetings on safety production and civilized construction, keep minutes of the meetings and report to Party A. A full-time civilized construction manager shall be set up to take charge of logistics and cooperate with the civilized construction management of the project department.
4. Insist on civilized construction, do a good job of "leaving hands behind" in time, and do a good job of cleaning the dormitory and contract area. Do not urinate anywhere, and do not burn electric appliances such as rice cookers and electric stoves. This consumes a lot of electricity in the dormitory. Without the consent of the project department, hot work is not allowed without permission, and offenders will be punished according to relevant regulations.
5. After investigation, Party B shall bear all economic and legal responsibilities for work-related injuries and other safety accidents caused by Party B; If it is the responsibility of both parties, the medical expenses are below 1000 yuan and will not be reimbursed; If it exceeds 1000 yuan, it shall be handled as appropriate.
6, in the field operation layer, it is forbidden to place a woodworking saw for on-site cutting processing. If construction is really necessary, it must be approved by Party A, and the safety and fire control procedures must be handled properly.
Verb (abbreviation of verb) project progress
1. Party B shall, according to the actual construction situation, provide sufficient management and operation personnel to work in shifts day and night, and ensure that there are more than 30 construction personnel and more than 30 management personnel 1 person during the peak period.
2. Party B shall ensure that the total schedule network and schedule prepared by the project department are completed within the specified time, so as to connect with other types of work. Obey the notice of construction progress requirements divided by the project department according to the needs of construction progress, and unconditionally accept the reward and punishment measures required by the notice.
3. If the project needs, it is necessary to ensure normal construction in rainy days, holidays and at night.
4. During the main body construction, 1 construction personnel are specially arranged to cooperate with the project department for lofting and rechecking.
Comprehensive management of intransitive verbs
1, abide by the rules and regulations of the project department (attached), create a civilized construction site, be a civilized builder, sign a letter of responsibility for fire control, safety and comprehensive management with the project department, actively carry out labor competition activities, and strive for a model team.
2. Summary of the main woodworking formwork project contract of the new villa: After contracting, Party B shall not terminate the contract halfway on the grounds of low price and construction difficulties, otherwise the down payment and project payment will be confiscated. Workers must have a birth certificate, a clear address for going out to work, a valid ID card and five one-inch color recent photos. Party A shall cooperate with Party B to apply for temporary residence permit and employment permit, and the expenses shall be borne by Party B. Without the consent of the project department, Party A shall not bring family members and children to live on site, and offenders shall be punished according to relevant regulations.
3. When recruiting laborers, Party B must strictly follow the relevant regulations and policies of Jiangxi Province and accept the supervision and inspection of government departments and street organizations.
Seven, mechanical equipment, labor insurance supplies, other mechanical appliances and sporadic work.
65438+
2. Labor protection articles (including raincoats and gloves) shall be borne by Party B. ..
3. The head rolling loss is 2% and the herringbone card loss is 3%. Less than or more than the above losses, according to the workload on duty according to the market price.
4. The carpentry wages required for this project that are not included in the contract scope shall be calculated at 4 yuan per hour, without adjustment. Party B must obey the unified scheduling of the project department, and shall not refuse to work with salary or other excuses.
Eight. mode of payment
The monthly salary will be paid, because this project belongs to a low-rise building and takes a short time. Therefore, one month after Party B enters the site, the valid work permit handled by Party A's project department will be used as the voucher for receiving the living expenses, and 500 yuan will pay 80% of the living expenses every month after the main structure is accepted (provided that all the affairs of Party B in this project are completed). If Party B needs to borrow money halfway, the project monitor shall submit a written application to the builder, and the builder shall sign it and report it to the project manager for approval. Then go to the financial staff of the project department to get it. Pay the balance within 45 days after the completion and acceptance of the construction project.
Nine, reward and punishment measures
1. Quality reward and punishment: If Party B fails to comply with all the quality requirements in the contract, and the inspection items such as appearance inspection, actual measurement and actual quantity of the intermediate structure acceptance fail to meet the quality requirements of the structure acceptance, Party B shall bear all the expenses caused by rework except deducting the remaining amount in this contract as a fine.
2. In order to ensure the quality of the project, Party B must clean the floor, isolation agent, etc. Over time. If not, a fine of 0.5 yuan per square meter will be imposed, which will be implemented in the current month.
3. Reward and punishment for construction period: If Party B fails to complete the general construction network plan of the project compiled by the project department, it shall not only compensate other shifts for missing work, but also bear the daily fine of 500 yuan.
4. Party B shall not arbitrarily delete; Party B shall compensate Party A for all losses if the template is punched because of the big board and small use; If it is really necessary to cut corners, make minor troubles or make holes, it must be approved by Party A before it can be implemented, otherwise it will be fined 300 yuan/time.
5. When the quality of Party B does not meet the technical disclosure or enterprise and national standards, the management of Party A has the right to impose a fine according to the seriousness of the case; If losses such as rework are caused, Party A shall pay losses to double indemnity.
6. Other rewards and punishments: implemented according to various systems or meeting minutes of the project department and commitments of both parties.
X. others
1. After contracting, Party B shall not terminate the contract halfway for reasons such as low price and construction difficulties, otherwise the deposit and project payment will be confiscated. If Party B's construction quality and progress fail to meet Party A's requirements, Party A has the right to terminate the contract.
2. Party B must abide by the rules and regulations of the construction site, strictly obey the unified dispatch and command of Party A, and always maintain the reputation of the enterprise and the project. If the violator causes economic losses, Party B shall be fully liable for compensation.
3. Party B shall designate special construction personnel, who shall not be replaced without the consent of Party A..
4. Party B is responsible for unloading emergency materials, and Party A will not bear the expenses.
5. Party B shall educate employees to protect the finished products of other teams during the construction process, such as poured concrete. If Party B's personnel leave footprints on the concrete surface, each fine will be 10 yuan, which will be implemented in the current month.
1 1. After this agreement comes into effect, if Party B withdraws for various reasons, Party A has the right to settle accounts for Party B according to 70% of the total work completed by Party B, and Party B has no objection.
12. The construction personnel of the carpentry class of this project need to go through all the procedures stipulated by the government that should be undertaken by the team, such as the cost of participating in endowment insurance, which should be borne by Party B; Party B shall bear all expenses related to foreign documents, such as temporary residence permit.
Thirteen. Matters not covered shall be settled by both parties through consultation.
14. This contract is made in triplicate, with Party A holding two copies and Party B holding one copy. Signature, seal or handprint shall take effect and have legal effect.
15. Project Department's Code of Civilized Employees, Dining System, Regulations on Administration of Public Security Punishment, Standardized Responsibility System for All Staff of Project Department, Regulations on Administration of Work Safety on Construction Site, Regulations on Administration of Work Safety, Responsibility Letter for Fire Prevention Management, Fire Safety Management System, Rules and Regulations on Use of Open Fire and Dangerous Goods, and Regulations on Rewards and Punishment of Fire Safety Management.
Party A and Party B
Signature of person in charge: signature of person in charge:
date month year
- Previous article:What is the status of dm in ur?
- Next article:Is Hangdian Guo Hong Group a state-owned enterprise?
- Related articles
- Excuse me, what is the situation of Jiangxi Getrak Transmission Company? It seems that the requirements for interviewing that company today are quite high, and no one can pass Band 6.
- How to recruit hourly workers in the same city? Urgent!
- Introduction of Xingyi People's Hospital
- Is it easy to get into Jinjiang Yinglin Middle School?
- How do girls choose between Qingdao People’s Bank and Jinan Construction Bank?
- How about Qingfeng Quanyou Factory?
- Recruitment information of Jia Cun Hongkang Fruit Industry Professional Cooperative in Wanrong County, and how about Jia Cun Hongkang Fruit Industry Professional Cooperative in Wanrong County?
- How to improve the recruitment quality of enterprises
- Tianjin wuqing district Gao artificial flower factory recruitment information, Tianjin wuqing district Gao artificial flower factory?
- 5 1Talk broke his arm to survive. Where did the 30,000 Filipino foreign teachers go?