The construction project process is as follows:

1. Planning and decision-making: covering the preparation of project proposals and the preparation of feasibility study reports.

2. Survey and design: It is divided into two parts, that is, the designer goes to the site to conduct on-site survey and preliminary design. Construction preparation: First understand the specific local conditions.

3. Construction: The start time is when the ground is broken for the first time and trenching is made.