Hello everyone, what I want to ask is the content of some systems or norms that are often expressed in frames on construction sites.
Civilized construction management system
1, the construction site in strict accordance with the general layout of the construction set up temporary facilities, facilities neatly arranged, tight access control.
2. Set up obvious signs on the construction site, and prepare five cards (project overview card, management personnel list and supervision telephone card, fire protection card, safety production card and civilized construction card) and one map (construction site plan).
3. The construction site is strictly divided into construction area and living area, separated by walls and decorated with permanent green belts. On-site roads are flat and there is no water.
4. Materials in the construction area should be neatly stacked, and signs should be hung to indicate relevant materials.
5, the construction site every half a month for a safe and civilized construction inspection, inspection should be recorded.
6. The living quarters should be equipped with facilities such as canteens, toilets and recreation rooms that meet the requirements of relevant civilization and hygiene.
7, fire equipment is complete, and the establishment of fire management institutions and fire control system.
Leading group:
Team leader: deputy team leader:
Members:
Safety inspection system
1, in order to publicize and implement the national safety production policy and labor protection laws and regulations, find hidden dangers in construction production, and carry out governance and elimination, regular and irregular safety inspections must be taken.
2, regular inspection, organized by the company's deputy production manager, safety section chief, planning section chief related personnel to check, the project department organized by the company inspection team related personnel to check, the company once every quarter, the project once a month.
3. Irregular inspection includes post safety education before and after work, as well as daily inspection of safety officers and safety officers at all levels. Managers at all levels check production and safety at the same time.
4, safety inspection should be recorded, find out the hidden dangers should be rectification within a time limit, rectification within a time limit, rectification should have acceptance records.
5. Safety inspection shall be scored on site according to JGJ59-99 safety inspection standard, and overall evaluation shall be made.
6, find out the hidden dangers not timely rectification to economic and administrative penalties, and make records.
Pre-shift safety activity system
1, each team must carry out pre-shift safety activities on time according to the standards promulgated by the Ministry of Construction.
2. Take 15-20 minutes for safety activities before going to work every day.
3. Contents of pre-shift safety activities: Learn relevant safety regulations, norms and safety operation procedures, summarize the safety production work of the previous day, and put forward safety production precautions according to the construction arrangement of that day.
4. The participants, hosts, recorders and contents of security team activities shall be truthfully recorded.
5. Activity records shall be regularly inspected and guided by the superior security department.
Safety education system
1, in order to improve the ideological and theoretical understanding of leading cadres at all levels and the broad masses of workers on the significance of safe production, and make the broad masses of workers understand the importance of implementing labor laws and regulations and observing labor discipline, and strictly abide by labor discipline and safety operation procedures.
2, the safety education of the broad masses of workers should be from the aspects of safety knowledge, safety skills and typical accidents for education and assessment. Workers who change jobs should also receive safety education in corresponding positions before taking up their posts.
3. Use spare time to conduct regular and irregular law-abiding education to prevent illegal command and illegal operation.
4. Safety education must be given to new workers, and those who pass the education examination are allowed to enter production posts.
5, in the process of life, we also carry out regular education, annual training and assessment of safety management personnel.
Safety production reward and punishment system
In order to fully implement the responsibility system for production safety and control the frequency of safety accidents within the scope prescribed by the state, the following safety reward and punishment systems are formulated:
I. Rewards
1. If potential safety hazards are found in time, report them immediately and make positive rectification, and reward 100 yuan.
2. After the project is completed, 300 yuan, the team leader, will be rewarded for this type of work without industrial accidents.
Second, punishment.
The person in charge of the project department will patrol and inspect every day. If illegal operations and operating procedures are found, they will be punished according to the reward and punishment rules. The team leader will be punished three times a day for each type of work 150 yuan.
1. Anyone who enters the construction site without wearing a helmet will be fined 20 yuan.
2. Wear slippers or go to work shirtless, and each person will be fined 10 yuan.
3. Each person who goes to work after drinking will be fined 100 yuan.
20 yuan will be fined for littering at high altitude.
5. 20 yuan will be fined for not wearing a seat belt when working high above the ground.
6. 20 yuan will be fined for everyone who makes fun at the construction site.
7. 50 yuan was fined for failing to organize safety activities before shift as required by the safety officer.
8. For the safety hazard rectification notice issued by the safety officer, the team leader will be fined 200~500 yuan every time he refuses to sign, and 50 yuan will be fined if he fails to rectify as required within the time limit.
Regular meeting system of safety work
1, the company holds a safety meeting once a month to understand the safety construction status of the project, study the specific problems in on-site production and construction, check the implementation of safety measures, put forward safety work requirements, and ensure that safety measures are implemented synchronously with construction tasks.
2. The project team insists on a weekly safety activity day, and arranges safety work while arranging production work.
3. According to the site situation, the safety department of the project department will hold safety work meetings from time to time to keep abreast of the site safety production trends, coordinate and solve specific problems of safety management business in time, and summarize and arrange daily safety work.
4. Carry out each safety team activity day regularly, and the team leader shall summarize the safety implementation within one week to the team members and make a complete record.
Safety acceptance system
1. Safety acceptance includes: tower crane installation and jacking acceptance, gantry and tic-tac-toe frame installation acceptance, scaffold erection acceptance, construction electricity installation acceptance, formwork engineering acceptance, etc.
2, tower crane, gantry, tic-tac-toe frame, construction electricity should be organized according to the construction plan acceptance, and then submitted to the local safety supervision station acceptance, acceptance rear can put into use.
3, before the acceptance, should inform the relevant personnel to the scene, and unified command and scheduling by the project manager.
4. Records shall be made during acceptance. After the acceptance is completed, discuss whether the acceptance is qualified according to relevant specifications and standards, and perform the signing procedures.
5, to do a good job of data archiving, to ensure that the equipment and safety protection facilities in good condition, to provide conditions for safe construction.
door control system
1, dress on time, stick to your post and prevent out of control.
2. Frequently inquire and register foreign personnel, and report and handle hidden dangers in time.
3, found that the perpetrators struggled to catch, protect the scene, cooperate with the public security department investigation.
4, strict inspection personnel and all kinds of vehicles. Materials and tools pulled from the site must be signed by the leader before they can be released and recorded.
5. Speak kindly, treat everyone equally, and impose heavy penalties on unreasonable and disobedient managers.
6, found that the fire and accident hidden danger timely report processing.
revertive control system
1, set up a fire leading group, post it, and define the responsibilities of firefighters.
2, organize personnel to participate in fire knowledge training, and conduct assessment and certification.
3. According to the site requirements, prepare fire extinguishing equipment, such as dry powder fire extinguishers, foam extinguisher, 12 1 1 fire extinguishers and fire hooks. , and set up a special fire extinguishing device at the scene to ensure long-term water supply.
4, regularly check the integrity of the fire control facilities, need to be replaced in time, and often on-site fire inspection, often keep in touch with the fire police, if there is an emergency report in time.
5. Participate in fire rescue in nearby places.
Construction site materials and machinery management system
1. All materials and equipment on site must be arranged according to the construction organization design, and a separate warehouse should be set up for loose materials.
2, material recipients adopt quota consumption system, turnover materials must be classified and stacked in specifications, and the decomposition and preparation of template materials must be approved by the builder.
3, the correct and reasonable use of materials (including raw materials, finished products, semi-finished products, turnover materials, low-value consumables, etc.). ), for ignoring the rational use of materials, fine 10-50 yuan, waste serious ad valorem compensation, and be ordered to leave after repeated admonitions.
4. Without the approval of the project manager, no one has the right to borrow, use or treat as theft the materials, tools and equipment entering the site.
5, all equipment and mechanical and electrical tools, must be fixed machine operation and maintenance, special type of work must hold relevant certificates.
6. When using machines and tools, the operating procedures must be strictly observed. Anyone who violates the rules will be fined 10-50 yuan, which will cause damages to machinery and tools. If the circumstances are serious, the operation right will be cancelled.
7. Evaluate once a month, and reward those who cherish materials, use, maintenance, equipment and tools correctly 10-50 yuan.
The above terms and conditions shall be supervised and implemented by the person in charge of on-site materials and electromechanical.
Site construction team management system
1, the team leader and captain of each construction type must complete it item by item under the unified coordination of the project manager and the builder according to the plan formulated by the company and the project department.
2. The construction team shall designate a full-time person to be responsible for the quality control and coordination of each type of work and each working procedure, including self-inspection, mutual inspection, mutual inspection and process crossing.
3, the construction personnel must be in strict accordance with the construction specifications, careful operation, to ensure that the quality reaches excellent standards.
4. Check and compare according to the division of labor of each construction section. Those who pass 90% will not be rewarded or punished; More than 90% reward 10-20 yuan; If it exceeds 90%, it will be fined 10-20 yuan; Those who fail to reach 80% will be ordered to be laid off.
5. If work stoppage or rework losses are caused by quality accidents, the construction team shall be fined twice the loss amount1~ in addition to compensating the economic losses of the parties and ordering them to leave.
6, if the construction team does not obey the management of the company and the project department, refining abuse, illegal operation, openly and secretly against on-site management, the project department shall report to the head office for approval and replace the construction team.
The site construction party is responsible for supervising the implementation of the above terms.
Engineering safety production guarantee measures
First, the division of building objects and construction projects
1. The measures to ensure the safety of foundation production are as follows: obvious warning devices should be set up for earthwork excavation, and the operating distance between two people should be kept at 2 ~ 3m, and excavation should be carried out layer by layer from top to bottom. The excavated trench and foundation pit shall be sloped, and solid wall support shall be provided when necessary. The excavated soil should be piled outside the ditch 1m, and the height should not exceed 1.5m, so that the cart can transport materials smoothly.
2. Measures to ensure the main body's safe production: it is forbidden to stand on the brick wall for construction, and the tools used for bricklaying should be placed in a safe place. Brick cutting should face the wall. After the work, the broken bricks and mortar shall be cleaned up, and the formwork support shall not use unqualified materials and shall be firm. Template support should be carried out according to the process. When the vertical pole exceeds 4m, a workbench shall be set. When it is less than 4m, it can be operated with a horse stool, and it is not allowed to stand on the column template or beam bottom template. The template removal shall be approved by the construction technicians, and the operation shall be performed in sections in sequence. The dismantled formwork shall be transported to the designated place in time for centralized stacking, and the vertical pole and wall reinforcement shall be bound. When the column reinforcement exceeds 4m, a workbench shall be set up and the column beam skeleton shall be fixed with temporary support. When kidnapping the foundation reinforcement, it is not allowed to reduce the bracket or horse stool at will. When binding steel bars of high-rise buildings, external racks or safety nets should be set up. When binding, hang up the safety belt, lift the steel skeleton, and no one is allowed to stand below. When the skeleton falls below the ground 1m, it is allowed to approach, and the hook can be unhooked when it is in place. After the concrete pouring of frames, beams and columns is completed, the operation platform is put into operation. Arch structure should be poured at the same time, and the arch feet on both sides should be symmetrical. Protective measures should be set for pouring ring beams.
Second, the scene environment
Scaffolds, protective facilities, safety signs and warning signs on the construction site shall not be removed without authorization. In holes, pits, ditches, elevators, funnels and other dangerous places, there should be protective facilities or obvious signs, as well as traffic signs. In dangerous areas, signs of "Danger" or "No Entry" should be hung.
Third, machinery.
In mechanical operation, the cuffs should be tied tightly, the braids of female workers should be pulled into the hats, and the bases of machinery and power machines should be stable. Protective devices should be installed in dangerous parts of rotation. Before work, check the machinery, instruments and tools, and make sure they are in good condition before use. Construction machinery and electrical equipment shall not run with illness or overload.
Fourth, labor protection:
When entering the construction site, you must wear a safety helmet, and it is forbidden to wear slippers or barefoot. When working at high altitude, cliffs and steep slopes with protective facilities, you must wear safety belts to protect female employees during menstruation, pregnancy, childbirth and lactation. When a female worker is not competent for her original job during pregnancy, she should do light work according to the doctor's certificate.
Verb (abbreviation of verb) safety protection measures
The entrances and exits that are in danger of cross operation should have protective sheds and isolation facilities. There should be protective railings, baffles or safety nets for operations more than 3 meters above the ground, and communication devices should be provided for aerial operations touching the ground, and special personnel should be in charge.
Six, fire prevention, poisoning prevention, etc.
Special warehouses for storing various paints and other flammable and toxic substances should keep a certain distance from other buildings. Workers suffering from skin diseases, conjunctival diseases and allergies to asphalt shall not engage in asphalt work, and the interval between shifts shall be appropriately increased.
Seven, winter
The coal used for heating in winter construction shall meet the requirements of fire prevention, and a special person shall be appointed to be responsible for the management, and measures shall be taken to prevent carbon monoxide poisoning.
Management system for special operators
1. All special operators (such as electricians, welders, climbers, riggers, elevator operators for construction, etc.). ) You must hold relevant certificates according to the requirements of the Ministry of Construction within the scope stipulated by the state.
2, special operations personnel, in addition to the three-level safety education, should also receive special targeted safety education for special operations personnel, strict safety technical operation procedures, and the relevant training departments training assessment rear can work at his post.
3, special operations personnel by the enterprise once a year to review education and participate in physical examination, by the enterprise security department is responsible for the assessment, from the date of issuing certificates to the issuing authority for review procedures every year.
4. When the type of work is changed, it shall be approved by the relevant department of enterprise security and put on record. When a general type of work is changed to a special type of work, it shall receive the safety technical education of the special type of work, and only after passing the examination by the relevant departments can it hold relevant certificates.
5, special operations personnel must have a strong sense of responsibility, familiar with the business technology and safety knowledge of this type of work and inspection standards and operating procedures, do not take risks foolhardy, handle problems in time when found.
6, special operations personnel must take good care of their certificates, if there is any loss, report in time.
7, all special operations personnel must abide by the above management system.
Noise prevention measures
In order to prevent the construction noise from exceeding the standard and affecting the lives of the surrounding residents, the following noise prevention measures are specially formulated for this project:
Do not use noisy machinery, such as circular saws and planers, before 7: 00, from 12 to 14 and after 1 in the morning.
2, reasonable arrangement of construction, try to reduce overtime at night.
3, in case of special circumstances, continuous construction, produce a small amount of noise will affect the lives of residents, should be reported to the company leaders and relevant departments for approval.
4. Install noisy machines away from residential buildings.
-
- Previous article:What about Wuhan rongxianghe cleaning service co., ltd?
- Next article:Dance teacher contract
- Related articles
- Can malt oral cavity brush medical insurance?
- When will Fengqing County¡¯s public institution recruiters work in 2015?
- What about Wuhan COFCO Meat Food Co., Ltd.?
- How about Courtyard by Marriott Puxi, Yu Nian Development Real Estate (Shanghai) Co., Ltd.
- Does the life teacher of the experimental school affiliated to Peking University Nanning have to work the night shift?
- How about Zhejiang Fang Yi Pharmaceutical Co., Ltd.
- What are Qingdao Chengyang Zhaogezhuang Electronics Factory?
- How about running a freight lesbian in Jiaxing?
- Where to find the business directory of foreign companies in Changzhou?
- Brief introduction of Nanyang talent network