It refers to the work content that a post needs to complete and the scope of responsibility that it should bear. Whether it is part-time or part-time, it refers to different positions. Job responsibility is a visual job description, which can be divided into different types of positions. The following are my job responsibilities in the decoration engineering department. Welcome to share.

Responsibilities of Decoration Engineering Department: 1 1. Responsible for compiling and implementing the overall progress plan of decoration engineering, supervising the implementation of the plan, effectively controlling the progress of the project and ensuring that the progress meets the requirements of the company;

2, responsible for the overall implementation and control of engineering decoration, scientific organization and management of people, money, things and other production factors entering the construction site;

3, presided over the preparation of project supervision planning, examination and approval of project supervision implementation details, and is responsible for managing the daily work of project supervision institutions;

4. Be responsible for the on-site organization and management and technical coordination of the project, formulate and arrange necessary safety and quality measures, and effectively control the quality and safety of the project;

5, responsible for personnel management in the process of engineering, coordinate the relationship between the parties, solve unexpected problems;

6, organize the preparation of supervision stage report, project supervision summary;

7, responsible for organizing the phased acceptance and completion acceptance in the process of construction, completion filing procedures and project settlement;

8, presided over the project supervision information.

Responsibilities of Decoration Engineering Department: 2 1. Responsible for collecting and studying laws, policies and industry trends related to decoration;

2. Participate in the design and cost of decoration engineering;

3. Be responsible for the on-site implementation of design drawings;

4. Organize and coordinate the relationship between various aspects and departments in the construction process to solve contradictions;

5. Understand customer needs, formulate project objectives, and ensure that key control links of the project, such as project objectives, progress, quality objectives and guarantee measures, are achieved with customers;

6, after the completion of the construction, organize the implementation of the project construction part to conduct a comprehensive acceptance;

7. Responsible for the training and management assessment of personnel and supervisors in various engineering departments.

Responsibilities of Decoration Engineering Department 3 1. Be responsible for the overall management of the project site and feedback the progress and difficulties to the company in time;

2. Review the construction organization design, supervise the implementation of the schedule, control the construction progress and complete the construction period;

3. Responsible for managing the construction team and coordinating internal and external relations;

4. According to the actual situation of each project construction of the enterprise, prepare and implement the completed project plan;

5. Cooperate with the cost department to control the budget estimate, budget and project cost from the planning scheme to the construction drawings;

6. Participate in the technical disclosure of construction drawings before commencement, and participate in the work of the blue prints.the design;

7. Strengthen project quality control, and be responsible for the whole process from project construction management to completion acceptance;

8. Do a good job in management of materials, equipment and personnel;

Responsibilities of Decoration Engineering Department 4 1. Participate in demand analysis, cost budget and business negotiation of decoration projects, assist in determining business terms such as project implementation and delivery, and coordinate internal resources;

2, according to the project plan, organize supervision, construction units and engineering personnel to review the construction drawing, and put forward relevant opinions;

3. Organize on-site construction management, implement the quality plan, schedule control and cost control of the project, and ensure the smooth progress of the project construction;

4. Grasp the progress of the project, communicate and negotiate with relevant parties of Party A in technical and commercial aspects, report to the management of the company in time, and coordinate and solve it in time;

5. Handle objections and complaints in construction in time to continuously improve service satisfaction;

6. Supervise and manage the construction site and conduct daily safety disclosure;

7. Establish, collect, sort out, summarize and hand over the construction project files, and coordinate the construction progress contract payment with finance.

Responsibilities of Decoration Engineering Department 5 1, fully responsible for the daily operation and management of Decoration Engineering Department.

2. Summarize the experience of construction management, prepare the annual work plan of decoration engineering department, formulate the responsibilities of each post, and formulate the construction plan of each project.

3. Regular professional skills training for employees.

4, responsible for coordination with various departments. Strengthen communication and cooperation with various departments, and strive to achieve the overall goal of the company.

5, presided over the department work meeting, coordinate the work of employees, convey the spirit of the group meeting, arrange the main tasks.

6, supervise and inspect the implementation of the construction management system, on-site inspection of the quality and safety of decoration engineering, coordinate and solve existing problems. Supervise the construction progress of each decoration project to ensure that each decoration project is completed with good quality and quantity.

7, responsible for the decoration engineering contract review.

8, timely report to the leaders in charge of the work, complete other work instructions issued by the superior.

Responsibilities of Decoration Engineering Department 6 1. Fully responsible for the daily operation and management of the decoration engineering department.

2. Summarize the construction and management experience, prepare the annual work plan of the Decoration Engineering Department, and formulate the construction plan of each project.

3. Be responsible for coordinating communication and cooperation with all departments, and strive to achieve the overall goal of the company.

4. Supervise and inspect the implementation of the construction management system, inspect the quality and safety of decoration projects on site, coordinate and solve existing problems, and urge the construction progress of various decoration projects.

5. Be responsible for reviewing relevant contracts of various decoration projects.

Responsibility of decoration engineering department 7 1. Do a good job in the construction organization plan of each decoration project, arrange the work of the decoration project manager, schedule the construction team, ensure the normal construction and do a good job in construction management.

At least 2.4 years working experience in mold engineering management.

3, completes the decoration engineering internal control monitoring, seriously participate in the contract quotation review, to ensure the realization of the project profit.

4. The vice president of engineering is responsible for the adjustment of process specifications and the application of new materials and new technologies.

5, responsible for the project management personnel assessment and entrusted audit.

6. Supervise subordinate departments to operate in accordance with prescribed procedures and norms.

7, responsible for spot checks on the construction site, audit the excellent rate, the implementation of rewards and punishments and rectification instructions.

8. Be responsible for the professional skills training and business guidance of subordinates, and do a good job in the performance appraisal of subordinates.

9. Responsible for the technical training of designers.

10, report to the competent leader on time, and complete the tasks assigned by superiors in time.

Responsibilities of Decoration Engineering Department 8 1. According to the current national and local construction specifications, formulate and improve the construction technical quality standards of our company.

2. Formulate and revise the project management system and process, construction team management system, etc.

3. Establish advanced project management system and construction operation system to ensure the leading level in the industry.

4. Establish an excellent management team, participate in and supervise the selection and employment of project managers in each division.

5. Formulate and revise the training plan of the construction team and supervise its implementation.

6. Supervise, inspect and evaluate the engineering and construction management status of each division.

7. Assist the project leader to solve major quality accidents and complaints.

8. Guide, supervise and assess the internal procurement indicators of each division, and promote the continuous improvement of internal procurement materials.

9. Preside over the daily work of project management, and supervise, guide and evaluate the implementation of project management and system in each division.

Responsibilities of Decoration Engineering Department 9 1. Strictly abide by the company's rules and regulations, obey the arrangement of the team leader, and carry out the work in accordance with the prescribed procedures and standards.

2. Participate in the negotiation of project contract and the confirmation of construction team.

3. Be responsible for the decoration work of the company, and review renovation contract, design scheme, design drawings and decoration budget.

4. Check the decoration materials and equipment, check the construction team, and accept the concealed decoration.

5. Check and supervise the technological practices and renovation progress in the renovation process, and control the renovation cost.

6. Check the decoration quality and do a good job of decoration settlement.

7. Do a good job in project completion acceptance, collect all the information and hand it over to relevant departments.

8. Responsible for communication and coordination with relevant departments of decoration and construction.

9. Responsible for communication and coordination with the administrative departments and cooperative units involved in the decoration construction process.

10. Complete other tasks assigned by the leaders.

Responsibilities of Decoration Engineering Department 10 1, responsible for the overall control of the quality and technical work of all construction projects of the company;

2. Manage the overall core technology of the company, and organize the formulation and implementation of major technical decisions and technical plans;

3. Solve the technical problems in the construction site;

4. Responsible for organizing the identification and handling of major quality accidents, inspecting the construction site irregularly, monitoring the project quality at any time, and calling relevant personnel to deal with the problems in time;

5. Examine and approve the construction organization design and construction scheme reported by the project department, and formulate the construction process parameters;

6. Participate in the blue prints.the design and scheme demonstration organized by Party A;

7, responsible for organizing the engineering foundation, the main division and unit engineering quality acceptance;

8, responsible for the implementation of national science and technology regulations and policies, establish and improve the corresponding management system;

9. Evaluate the project quality according to the self-inspection data reported by the construction site and the initial inspection data of the third-party inspection unit, and formulate corresponding emergency plans;

10, presided over the preparation of completion technical documents, participated in the completion acceptance, organized the construction technical summary and the writing of academic papers, and was responsible for reviewing and reporting to superiors.

Responsibilities of decoration engineering department 1 1 1. The project engineering manager works under the leadership of the engineering manager and deputy manager;

2. Responsible for the construction organization and arrangement of the project undertaken by the enterprise;

3 responsible for the recruitment, skills training, assessment, salary calculation and payment of construction workers in this department;

4. Responsible for civilized construction and safe construction on the construction site;

5. Be responsible for supervising the construction quality of the project undertaken;

6. Strictly abide by the enterprise's system on the use of building materials, after-sales service and customer relationship maintenance;

7. Assist designers to use new decorative materials and cooperate with designers to improve their creativity.

Responsibilities of decoration engineering department 12 1. Implement the company's management rules and regulations, and establish and improve the management system of the decoration department.

2, responsible for organizing all kinds of decoration engineering bidding work, participate in contract negotiation and contract signing.

3. According to the company's management rules and regulations, the construction team is selected through bidding, and the working procedures and management system are established to ensure the engineering construction requirements.

4. Responsible for the preparatory work of the proposed project, prepare the project schedule plan, manpower and material resources plan, machinery and equipment plan, and cooperate with the budget department to prepare the proposed project budget.

5. Be responsible for the preparation and improvement of relevant procedures and materials for the construction approach, handle the construction approach procedures, and organize the inspection project approval procedures.

6, responsible for the daily construction organization and management of the project construction site, actively coordinate the construction teams to carry out on-site construction in strict accordance with the schedule and quality stipulated in the contract, supervise and inspect the construction technology of each construction team, and rationally allocate personnel and distribute materials according to the number and priorities of construction tasks, so as to ensure that the project can be completed on time and minimize the project cost.

7. Be responsible for organizing and coordinating the relationship between all parties to the project (construction investors, supervision units, design units and construction teams), establishing the purpose of putting the interests of the company first, and consciously safeguarding the company's image and reputation.

8. Strictly abide by the company's safety production system, establish and improve the on-site safety construction and fire prevention system, and implement safety first.

9. Strictly supervise and control the project construction cost according to the project construction budget approved by the company to ensure the realization of the project cost control goal;

10, strengthen the standardized management of engineering data, and timely collect, sort out and archive documents, notices, minutes, negotiations and various technical data in the whole process of engineering construction.

1 1, responsible for the control and management of the project progress, and take timely measures and adjust the progress accordingly when finding that the construction period may be delayed, so as to ensure that the project is completed as planned;

12, responsible for the hidden inspection, pre-inspection and daily quality control inspection of engineering construction, to ensure the realization of engineering quality objectives, meet quality requirements, and pass the final project acceptance.

13, responsible for establishing and improving the management system of materials in and out of the construction site, ensuring clear material accounts and orderly warehouse management, strictly controlling the materials used by workers in the construction process, striving to reduce material loss, and controlling the specifications and quality of materials used in the project, and strictly controlling the project cost.

14, responsible for inspecting and supervising the maintenance of equipment and facilities on the construction site, and making handover and records of equipment and facilities in the construction process to prevent safety accidents or other quality accidents.

15, organize on-site finished product protection, timely organize the cleaning of completed projects, protect finished products, and prevent finished products from being damaged or lost.

16. Solve the sudden accident on site in time, report the emergency accident to the company in time, and strive to get the best solution in a short time to prevent the situation from expanding.

17, keep abreast of the project situation, timely report the changes, negotiations, project increase or decrease, contract changes proposed by Party A, adjust the scope of work accordingly, collect and sort out written materials, make corresponding arrangements for all aspects of work, and assist the budget department in making final accounts.

18, responsible for concealed engineering acceptance, completion acceptance procedures and handover work, making records and obtaining formal acceptance documents recognized by the other party.

19, responsible for the project warranty management and coordination from the completion of the project to the expiration of the warranty period.

20, strengthen the organization and management of civilized construction, and actively create a civilized construction model site.

Job Responsibilities of Decoration Engineering Department 13 Decoration Engineer Shanghai Yi Jinhui Real Estate Development Co., Ltd., Yi Jinhui Job Description:

1, responsible for the review and summary of various systems and related drawings for project decoration, and able to propose relevant reasonable plans for modification;

2. Be responsible for the review of scheme design, preliminary design and construction drawing design, and organize the disclosure and joint review of project drawings;

3, responsible for the illegal construction behavior of the construction unit to stop, correctly guide the work of each type of work, and actively cooperate with customers to carry out decoration projects according to schedule;

4. Be responsible for keeping close contact with the decoration unit and coordinating the decoration site;

5, responsible for following up the decoration unit according to the requirements of the drawings confirmed by the audit;

6. Master the review, follow-up and completion acceptance of relevant professional parts in decoration work;

7, responsible for strict supervision and familiar with the site materials and construction quality, supervise and urge the construction unit safety in production, and require the site construction to comply with fire control and related technical specifications;

8, understand the decoration site safety electricity, water, heat and other related requirements and responsibilities, and assume overall management responsibility.

Requirements:

1, bachelor degree or above.

At least 2.5 years experience in supervision and decoration management of large hotels, shopping malls and office buildings.

3, familiar with the decoration site specifications, process requirements, understand the relevant laws and regulations of fire control system, and have rich experience in site management.

4. Be quite familiar with the situation of each system, understand the construction situation, material use standards, construction site enclosure, drawing review and construction management in each decoration stage, and have the ability to independently review drawings and supervise the decoration site.

5. Have strong visual collocation ability, be proficient in operating AutoCAD, PowerPoint, Photoshop and other software, and have good communication and coordination skills and strong execution.

6. Hardworking, good communication skills, strong professionalism and teamwork spirit.

Responsibility of Decoration Engineering Department 14 Responsibility:

1, responsible for coordinating design, reviewing construction drawings of decoration and curtain wall installation, and arranging design, supervision and construction units to subcontract on-site construction;

2, responsible for decoration, curtain wall installation and construction quality of regular spot checks, inspection and related acceptance work;

3, responsible for organizing the decoration engineering scheme design, construction drawing design results came and disclosure work;

4. Responsible for the coordination, monitoring, progress and quality control of on-site decoration design changes;

5. Assist in sample selection and sample sealing of main decoration materials of the project, and provide technical drawings and materials required for bidding;

6, familiar with the civil plate.

Qualifications:

1, 30-40 years old, major in indoor and outdoor design and decoration, civil engineering or above;

At least 2.5 years management experience of Party A's decoration project in real estate company;

3, familiar with decoration, familiar with curtain wall installation construction technology, construction process and related acceptance specifications, cost control, understand the decoration, installation, building materials market, skilled operation of AUTOCAD drawing software and other office software;

4, strong construction site management, guidance, overall planning and coordination ability, strong sense of responsibility.

5. Complete project experience is preferred.

Responsibility of decoration engineering department: 15 1. Under the leadership of the chief technical engineer and the chairman of the board, participate in and cooperate with the design, business and bidding of the project, fully fulfill the commitments agreed in the construction contract on behalf of the company, and be the _ _ _ responsible person for completing the safety, quality, schedule, cost, data and economic indicators of the project during the performance period;

2, responsible for the technology and construction, and organize the project department to implement weekly, monthly and quarterly work, coordinate the progress of various projects, and ensure the quality;

3, familiar with national, industrial and local laws, norms, standards, construction quota, technology, strict implementation of project management regulations;

4. Familiar with the ability to grasp the overall decoration effect, the ability to control the safety quality, progress, cost, operation, prediction, analysis and control of the project, the ability to coordinate with Party A, supervision, general contractor, design and industry authorities, and the ability to deal with emergencies;

5. Be responsible for reviewing the "technical disclosure" of the builder and quality engineer and the "safety and environmental disclosure" of the safety officer, establishing a "dynamic contract management" account, negotiating with the team on the construction period, scope and quality requirements, and signing a "contract agreement" with the single and double contractor teams;

6. Be responsible for the registration of the basis for the change of quantities during the site construction, and assist the cost center to apply for a visa;

7. Be responsible for reporting the output value of Party A and confirming the output value of Party B every month, and compiling and implementing the three major plans of project progress, materials and personnel;

8. Be responsible for the progress, quality, safety, civilized construction and team coordination in the construction process, and report the project progress to the superior leaders in time;

Responsibilities of decoration engineering department 16 1. Abide by the company's rules and regulations, and strictly observe and implement the provisions in the supervision and management system. Strictly observe the company's business secrets.

Second, strictly implement the construction contract signed by the customer and the company and its attachments, and maintain the legal authority of the contract.

Third, in the construction process, in accordance with the relevant national standards and company quality regulations, strictly control the technological process and quality, strictly conceal the acceptance of the project, and fill in the acceptance records carefully.

Fourth, measure your work with customer satisfaction as the standard; Pay attention to words and deeds at work and establish a good image of the company in front of customers.

5. Have a good sense of service, adhere to the principle of "no bad customers, only bad services", and communicate with customers seriously.

Vi. Supervise the implementation of the company's rules and regulations, urge the construction team to comply with the Requirements of Construction Site Management Code, and report the implementation of the rules and regulations to the project manager in time.

Seven, responsible for coordinating the relationship between customers, designers, foreman, timely processing and answering all kinds of problems in the construction.

Eight, supervise the construction progress, check the progress of the project, to ensure that the project is completed on schedule.

9. Before the construction team enters the site, coordinate, contact and participate in the technical disclosure of customers, designers and foremen, arrange the construction team to enter the site, and fill in the on-site disclosure records.

Ten, decoration materials comes into play is responsible for contacting customers to the scene for acceptance of materials.

Eleven, in the process of engineering construction, the actual change and increase or decrease of the project put forward by the customer, the project supervision should contact the designer, foreman and customer in time, and the change of the project will be signed by the customer for confirmation.

Twelve, in case of special circumstances, the project must extend the time limit for a project, should take the initiative to inform the customer and carefully explain, after consultation between the two sides, * * * to extend the formalities.

Thirteen, more than half of the project period (carpentry convergent), take the initiative to contact customers, foreman and designers for project acceptance, and settle the interim payment as stipulated in the contract, at the same time, increase or decrease should also be settled.

Fourteen, after the completion of the whole project, supervision should actively contact customers, foreman for acceptance of the project; After acceptance, please fill in the project acceptance form, handle the project warranty form, and fill in the customer's evaluation and feedback.

;