How many steps are there in the renovation of new houses in Dongguan?

Water and electricity is the most important thing in house decoration, so we should pay special attention to it. Usually, the normal steps are:

The first step: according to the design drawing of the room and the specific needs of customers, design the direction of hydropower;

Step 2: Workers should make grooves on the wall or ground according to the direction.

Step 3: Bury pipelines (including wiring and connecting pipelines) and cassettes.

Step 4: detect the circuit, and carry out pressure test on the waterway.

Step 5: Install the switch panel after painting the wall or laying wallpaper.