See how the dyeing factory makes vats.

65438+

2. Check the delivery address and contact the customer to ensure that there is no problem with the transfer amount;

3. If the customer order indicates the processing price line, notify the business supervisor or the factory director;

4. If the order is for special fabric dyeing or has special requirements, or has doubts about fabric dyeing practices, it needs to be submitted to the team leader for review and decide whether to review with the development team leader before the production department can put into production;

5. Make clear the color matching information of the order (for example, for labdip, for incoming orders or previous orders), what lamps are used for the color matching information, and the yarn label should be indicated on the drum card;

6. Make it clear whether the order is color collision, white collision or laundry. If there is such a requirement, it should be indicated on the exhaust card;

7. If there is printing, it must be clear whether it is reactive printing, piment printing or wire drawing printing. If there is reactive printing, please contact the customer if it is too soft.

8. Need to know whether there is a requirement for wool feeding in the order. If there is wool feeding, you should contact the customer first, hand over the customer's wool feeling office to the factory director or dyeing department to decide the dosage of wool feeding agent, and indicate the wool feeding amount and dosage on the tube card;

9. If the order is a hydrodesulfurization or fermentation washing list, it shall be reviewed by the factory director;

10. If the order is normal dyeing and setting specifications, such as washing fastness and dry-wet rubbing fastness, production can be arranged. If there are special requirements, such as fastness to perspiration, fastness to light, fire prevention and pollution prevention, etc., it should be submitted to the factory director for review.

1 1. If the order is 1000 pounds, contact the customer whether the shirt body is the same yarn brand or how many batches of yarn, so as to calculate how to arrange the cylinder, follow up with different yarn brands to cut the gray cloth and dye the color for the dyeing department;

12. Check whether the order indicates the embryo arrival date, embryo filling period and delivery date. If not, publish a document to contact the customer for follow-up information. If it is less than one week from the embryo filling period to the delivery date, it will be submitted to the supervisor or factory director of the health control department for review.

13. When each large bill is full, an independent summary table should be made for each document for each department to follow up;

Second, billing.

1. Make a daily record of embryo arrival, carefully review the batch number, fabric type and yarn type of the opening list, and follow up and arrange reprocessing, matching dyeing and finishing as soon as possible;

2. What kind of cylinder (gn8 or gn 18) should be clamped with the dyeing department before large-scale color arrangement to determine the number of pounds dropped from the heavy cylinder of the cloth dryer;

3. If the cloth has special technological requirements, such as scratching, sanding, printing, eating wool, pre-shrinking machine, etc. , must be marked or stamped on the cylinder card;

4. The requirements of customer orders, such as specifications, cutting requirements, color matching information, lighting information, delivery date, etc., should be indicated in the notification process and remarks.

Third, follow up the production progress.

1. Track the daily progress of embryo collection, embryo arrangement and embryo arrangement;

2. Check the daily cylinder discharge record and follow up the dry cloth, setting and batch delivery;

3. Feed and recycle the customer's multicolor every day, and the batch of goods with ok multicolor will be sent to the shaping department for production, while the hot color will be returned to the batch color department by the dyeing department for repair;

4. Track the daily setting progress and check the quality and specifications of each tube of cloth, such as shrinkage and fastness. If there is no problem with the cloth inspection, the goods will be received and delivered;

5. Check the production progress every afternoon, and provide accurate emergency documents to the supervisor of life control department to arrange production;

6. Track the embryo arrangement cycle of each piece of paper. If the embryos are still not aligned five to seven days before the delivery date, we should send a document to the customer (indicating the number of embryos received and the number of embryos missing), asking the customer to reply on the document when the embryos are aligned, and stating that the company may not be able to deliver the goods within the specified time, but we will try our best to catch the goods, then submit the delivery date and follow up after the embryos are aligned (the document should be kept for documentary evidence). "

7. Follow up the dyeing of the head cylinder after ordering the dyeing of big pound color. Whether the cylinder type and dry cloth machine (candle cylinder or throwing and shrinking machine, screen machine) meet the specifications, be sure to communicate with the setting department and dyeing department to confirm the dyeing cylinder type and dry cloth model with the tail number;

8. We should know the authenticity of the delivery date of each customer by experience, follow up the progress of each order three days before delivery, calculate whether there is any problem with the delivery date, communicate with Jiang, the head of the production department, and follow up closely. If it involves sending a plane or accompanying money, you must inform the supervisor or the factory director.