Job Recruitment Website - Job information - What qualifications do environmental testing companies need?

What qualifications do environmental testing companies need?

Qualifications required by the environmental testing company: it is required to pass the qualification certification of the provincial quality supervision department and obtain the China people's * * * and national metrology certification before engaging in indoor environmental testing; At least a limited liability company; There are also requirements for registered capital; Personnel need at least one senior chemical analysis engineer and several chemical analysis engineers; The testing unit must have an independent laboratory; Fixed place.

Environmental testing companies need to pass the qualification certification of provincial quality supervision departments and obtain the metrological certification of People's Republic of China (PRC) and China before they can engage in indoor environmental testing.

At least one limited liability company must be registered, and different regions also have requirements for registered capital, with at least 500,000 registered capital.

After the completion of industrial and commercial registration, it is necessary to purchase instruments and equipment and recruit chemical analysis engineers. The instrument must be a national standard chemical analysis instrument certified by CMC. The basic instruments are: gas chromatograph, spectrophotometer, soap film flowmeter, analytical balance, atmospheric sampler, radon detector, drying box, etc.

Personnel need at least one senior chemical analysis engineer and several chemical analysis engineers.

After at least three months of trial operation, a complete laboratory management system has been established, and then an application for metrological certification has been made to the Provincial Quality Supervision Bureau.

Indoor environmental testing can only be carried out after measurement certification.

Engaging in environmental testing without metrological certification is regarded as illegally issuing notarized data, and the local quality supervision inspection team will investigate and deal with it.

The testing unit must have an independent laboratory, and the instruments for on-site testing should be labeled with the measurement label of the measuring unit; At least 500 thousand funds, fixed staff, more than 6 technicians in Shaanxi Province, including 3 engineers or above, fixed place, experimental management system, quality manual, program documents, etc. It takes about a year.

1, testing personnel should have intermediate or above titles or college education and have more than two years of professional experience. Testing personnel shall receive professional technical training organized or authorized by CNCA or State Environmental Protection Administration, Ministry of Health, Ministry of Construction and quality and technical supervision departments at or above the provincial level before taking up their posts.

2. The indoor environmental pollution testing company shall hold the national metrological certification qualification certificate, and the name of the certificate shall be the same as that of the entrusted testing unit.

Legal basis:

Measures for the administration of qualification identification of inspection and testing institutions

An institution applying for accreditation of inspection and testing institutions shall comply with Article 9 of the Administrative Measures for Accreditation of Inspection and Testing Institutions (No.12, 2004). Former AQSIQ 163).

Article 9 An inspection and testing institution applying for accreditation shall meet the following conditions:

(a) a legal person or other organization established according to law and able to bear corresponding legal responsibilities;

(2) Having inspection and testing technicians and management personnel suitable for their inspection and testing activities;

(3) It has a fixed workplace and the working environment meets the inspection and testing requirements;

(4) Having inspection and testing equipment and facilities necessary for carrying out inspection and testing activities;

(5) Having and effectively operating a management system to ensure the independence, impartiality, scientificity and integrity of inspection and testing activities;

(six) meet the special requirements of relevant laws and regulations or standards and technical specifications.