1.? Installation technology of color profiled steel plate
Roof gutter- Roof bottom plate-fixed seat-roof insulation cotton-roof outer plate-wall inner plate-wall insulation cotton-wall outer plate-edge-closing flashing plate.
2.? method of erection
2. 1.? Set up two 4m×3m scaffolds with steel pipes, each scaffold is equipped with four wheels, which is convenient for propulsion.
2.2.? Install the inner roof panel first. According to the technical requirements, each wave crest is fixed with a special self-tapping screw, the length is 30mm, and the color of the nut is the same as that of the color plate.
2.3.? Spread thermal insulation cotton, and seal the seam of thermal insulation cotton with special tape.
2.4.? Install fixing pieces, and fix the fixing pieces on purlins with self-tapping screws, one for each purlin.
2.5.? Put the first steel plate on the fixed fixture, and then press it tightly with the bottom groove of the central rib and the inner rib of each fixture, and make them fully engage.
2.6.? Lock the middle rib of the colored tile with a special edge locker.
2.7.? Position the following fasteners, one for each bearing surface, and engage the interlocking rib edges of the fasteners with the outer ribs of the installed steel plate.
2.8. Draw a line along the bottom of the steel plate and check whether both ends of the steel plate are in a straight line. Put the second plate on the second row of fasteners, with the inner rib on the outer rib of the first steel plate and the central rib on the vertical ground of the central rib of the fastener. Repeat the operation method of the first plate and install it in turn.
2.9.? The construction method of internal and external threaded connection of wallboard is similar to the installation of color plates in the roof.
2. 10.? Installation of gutter: the gutter is connected to the ground to be 9m, and it is pulled to the roof with hemp rope for installation. When installing the gutter, keep it straight.
- Previous article:What documents does a B-ultrasound doctor need to bring?
- Next article:What does Anhui teacher recruitment primary school take?
- Related articles
- How is the work in Langli Park of Lance Technology?
- How about Mulinsen College?
- When does Jilin General Aviation Vocational and Technical School start?
- Environmental geological problems of energy mines
- Treatment of Hesheng Silicon Power Plant in Xinjiang
- Is it true to recruit dishwashers for half a day?
- Weihai Yuhongxiang Silk Culture Technology Co., Ltd. Recruitment information, what about Weihai Yuhongxiang Silk Culture Technology Co., Ltd.
- How about Jiangsu Ji Ming Pharmaceutical Technology Co., Ltd.?
- What are the functions of erp module?
- In 2022, the recruitment of institutions in Panzhou City, Guizhou Province was not allowed.