Job Recruitment Website - Job information - What is the main task of middle pile survey?
What is the main task of middle pile survey?
The specific work includes: 1, setting out, that is, putting the straight line between turning points on the drawing to the ground, calculating the length and rotation angle of each line segment in advance indoors according to the initial measuring traverse on the ground or the coordinates of turning points on the drawing, and determining the center line on the spot according to the calculated data; 2. Middle pile layout, that is, laying out 100m pile, adding pile, control pile and curve main point pile on the center line of the line, including measuring the straight line length of the line, laying out the curve in detail and setting up the center line pile according to the specified requirements.
The pile number measurement in highway is to determine the plane position of the center line of the route, which is the basis of cross-section measurement, longitudinal section measurement and strip topographic map measurement, and also the basis of design and construction lofting.
- Previous article:How about Hainan Haitian Aquatic Feed Co., Ltd.
- Next article:What do you mean by advance approval in autumn?
- Related articles
- How to get to Foxconn Hongfu Precision Co., Ltd. from Chengdu-Du Yun District Gaoxinqing Apartment L Park? have much/many
- How about changji city Qirun Information Technology Co., Ltd.?
- Ba' nan nanquan recruitment
- What is the treatment of Baotou Garden Bureau?
- Is Jiang Lai-on-Henderson worth buying?
- Where can I get a health certificate in Beilun Xiaogang?
- Choose sunglasses tortoise shell color or black, which is more versatile.
- How about Ganzhou Shuixi Beyond Science and Technology?
- Is Tangshan Caofeidian District Comprehensive Insurance International Trading Group Co., Ltd. a state-owned enterprise?
- What is the Korean drama "The daughter skirt of the chaebol is torn down"?