Construction safety technical disclosure of formwork removal in building construction?

What is the technical disclosure about the safety of formwork removal in building construction? Want to know the answer, the following is the related content of safety technical disclosure about the demolition of building construction formwork compiled by Zhong Da consulting Bian Xiao, and the basic situation is as follows:

Generally speaking, after concrete is poured into the formwork, after a certain period of time, the concrete will gradually solidify and reach the corresponding strength. At this time, it is necessary to dismantle the formwork, so as to help the concrete to harden better and finally achieve the required strength of the building. At the same time, dismantling the formwork in time is also conducive to increasing the turnover times of the formwork and improving the construction efficiency of the building project.

Construction safety technology of dismantling formwork in building construction;

(1) The operator must wear a seat belt when ripping at high altitude; It is necessary to assign special personnel to conduct safety inspections around the population exit and the working area; No one is allowed to stand or walk in the lower part of the site except the operator.

(2) scaffolding is needed when removing nails. During the interval of formwork removal, all templates and removed parts should be transported away.

(3) In the process of dismantling the construction template, when potential safety hazards are found, the work of dismantling the template must be stopped immediately, and the template can only be dismantled after analysis and treatment meet the design requirements.

(4) When the formwork is dismantled, the formwork, support and other structures shall be dismantled immediately, and the nails nailed to it shall be neatly stacked, so as to avoid falling from a height and hurting people or hurting people from nails.

(5) When the wind reaches level 6 or above, the work of dismantling the construction formwork shall be stopped, and the formwork shall not be removed.

(6) In the process of template removal, the removed templates and accessories shall not be thrown from a height at will, but should cooperate with each other and be connected from top to bottom.

(7) In order to prevent the whole structure from collapsing, temporary support must be undertaken before the load-bearing formwork is dismantled. For the floor under construction, be careful not to dismantle the lower floor.