Job Recruitment Website - Job information - Where is Chongqing West Railway Station?
Where is Chongqing West Railway Station?
Chongqing West Railway Station is the main gateway hub and comprehensive railway super station in Chongqing. It is a newly-built "one master" in the "three masters and two auxiliary" passenger transport hub planned and constructed in Chongqing, and it is the origin and destination of trunk railways such as Chongqing-Guizhou, Chongqing-Kunming and Chongqing-Hunan.
It is also a comprehensive transportation hub integrating railways, long-distance buses, tracks, taxis, social vehicles and other modes of transportation. After it is completed and put into use, it is of great significance to enhance Chongqing's hub status and facilitate people to travel quickly. It is estimated that the passenger flow will reach 4210.8 million person/year.
Chongqing West Railway Station consists of two parts: the West Railway Station Building and the West Railway Station Comprehensive Transportation Hub Project.
Extended data:
Overall layout:
Chongqing West Railway Station adopts the elevated waiting mode, and the station building design adopts the mode of mainly entering and leaving the station, supplemented by entering and leaving the station. The station building has five floors and adopts the mode of "comprehensive transportation and three-dimensional layout".
Among them, the second floor above ground (1F and 2F floors) is the waiting hall of the main railway building, and the railway platform, ticketing hall and entrance hall are set in the middle of the first floor below ground. The station square is set in front of the platform, and the bus departure station, bus terminal and bus station are set on both sides of the square. In the waiting hall, there are 22 ticket gates, all equipped with automatic ticket gates.
In addition, there is a mezzanine on the second floor of the waiting hall as a business district. The station building is divided into three entrances in the east, south and north directions of the entrance hall, and there are two ticket offices around the east gate, where tickets can be purchased at the on-site window or online through the ticket vending machine; * * * There are 9 ticket collection offices, 46 manual ticket sales windows and 75 self-service ticket vending machines.
The basement level (B 1 and B2) is the platform level and exit level. The ground of the East Square is flush with the platform floor, with a railway passenger distribution hall and a railway ticketing hall in the middle. Public * * * transfer area (track area, taxi area), with 2,630 social parking spaces on two floors.
The third underground floor (B3 floor) is the area of Chongqing Rail Transit Ring Line and Chongqing Rail Transit Line 5; The negative fourth floor (B4 floor) is the area of Chongqing Rail Transit 12 line.
Baidu encyclopedia-Chongqing west railway station
Official website of Chongqing West Railway Station-About West Railway Station
- Related articles
- Many police officers check KTV male models for paid escort! What chaos still exists in KTV?
- Is the pollution from the copper smelting plant particularly serious? What kind of pollution is there?
- Which area does China-Australia Logistics Industrial Park belong to?
- Where is the Bao Yang Mountain Bridge?
- Wuxi New House Decoration Company Ranking
- What unit does Jinan Rail Transit Group belong to?
- How to draw flowers
- How about Huangshi Hengjiu Industry and Trade Co., Ltd.
- Is it easy for China Consulting Engineering Management Consulting Company to enter?
- Safety composition 500 words