Job Recruitment Website - Job information - Introduction of construction contract of high pressure jet grouting pile?

Introduction of construction contract of high pressure jet grouting pile?

High pressure jet grouting pile construction contract? The following Zhong Da Consulting brings the relevant contents of the high-pressure jet grouting pile construction contract for your reference.

Party A: Xingtai Highway and Bridge Construction Company

Party B: China Coal Huasheng Hydrogeological Survey and Engineering Company

In accordance with the Contract Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, following the principles of equality, voluntariness, fairness, honesty and credit, and in combination with the actual situation of this project, the following agreement is reached through consultation to clarify the responsibilities of both parties:

1. Project name: goaf treatment project of Xingfen expressway Xingtai-Hebei-Jinjie section (XFLJ-8 contract section).

2. Engineering tasks: φ 1 10mm drilling rig, 2 1268 linear meter, high-pressure grouting, 62120m3.

3. Project content:

(1) hoisting equipment;

(2) Self-contained diesel engine for power generation;

(3) drilling holes with a drilling machine;

(4) high-pressure grouting;

(5) The site shall be clean and civilized.

4. Project cost and settlement method

(1) construction unit price: φ 1 10 mm drilling rig, 195 yuan /m, high-pressure grouting 90 yuan /m3. The construction unit price includes labor cost, machinery cost, construction power generation oil, material cost, accident personal insurance, labor protection articles and all other labor-related expenses.

(2) If the geological conditions change (such as inconsistent with the geological survey report, encountering gravel layers, seeing ancient tombs, etc.). ), the cost is negotiable.

(3) The total project cost is 9.63 million yuan (in words: 9.63 million yuan only).

(4) During the construction period, Party A shall guarantee the fuel cost and labor cost required for normal construction.

(5) At the time of settlement, it shall be priced according to the actual workload. After Party B completes the construction, Party A shall settle Party B's project payment in one lump sum within 30 days. 5. Construction period: March 28th, 20 1 1 year to July 20th, 201/year.

6. Rights and obligations of Party A:

(1) Party A is responsible for formulating the overall construction scheme and quality technical standards, and coordinating the quality inspection and acceptance procedures.

(2) Party A shall provide qualified grouting pipe, cement, fly ash and other raw materials needed for engineering construction, and be responsible for transporting them to the construction site. (3) Party A shall provide the construction site, pile location, water source and sewage, etc. , to ensure smooth construction site.

(4) Party A has the right to supervise the project quality of Party B.. If quality problems are found, Party A has the right to punish Party B. ..

(5) Party A is responsible for coordinating and solving the external relations of Party B's construction to ensure the normal progress of Party B's construction. ..

7. Rights and obligations of Party B

(1) Party B must make a reasonable construction plan, obey the management of Party A, and strictly implement the construction documents, construction technical specifications and quality acceptance standards.

(2) Party B shall provide drilling rig, lifting equipment, high-pressure grouting pump, air compressor, water pump and other mechanical equipment required for construction.

(3) Party B must organize the construction according to the construction progress plan formulated by Party A. ..

(4) During the construction period, Party B has the obligation to conduct safety education for construction personnel and formulate safety protection measures. In case of an accident, Party B shall bear the losses.

(5) During the construction period, Party B shall not litter, pay attention to environmental protection and abide by the relevant regulations of Party A. ..

8. Matters not covered in this contract shall be negotiated separately by both parties.

9. This contract is made in quadruplicate, with each party holding two copies.

It will take effect as of the date of signature and seal by both parties.

Party A: (signature): Party B: (signature)

Date: Year Month Day Date: Year Month Day