Job Recruitment Website - Property management - 3. Model equipment maintenance application report

3. Model equipment maintenance application report

Project management is the effective management of all the work involved in the project by the project manager under the constraint of limited resources, through the cooperation between the project manager and the members of the project organization, using systematic viewpoints, methods and theories. This paper is a sample of equipment maintenance application report compiled by me for reference only.

Template of equipment maintenance application report 1:

Dear Temporary Owners Committee of Kang Hua Garden Community:

Hello! Kang Hua Garden Community has been built for more than seven years. During these seven years, our company first thanked the temporary owners' committee and the owners for their understanding and support of our work. Over the past seven years, Kang Hua Garden Community has been well received by the government and superior departments for its elegant living environment, perfect supporting facilities and excellent service? Civilized community? 、? Safe community? 、? Advanced unit? It is also the only demonstration community in Xunyang County.

In recent years, with the increase of service life, some of the original public facilities and equipment have been corroded, and the warranty period has expired, so it is impossible to maintain them, which has affected the normal use of some properties, mainly in the following aspects:

1. The original electronic call door of each unit in the community cannot be used normally. After investigation, our department found that the existing pagers in Ankang area have failed in different degrees after more than two years of use. Please consider whether to add them to your reply.

2.7. 18 Natural disasters caused the wall skin on the first floor of Unit 74 to fall off, and the owner requested to paint the wall (stairwell) on the first floor;

3. The water meter box and some public wrought iron in each unit building have been damaged;

4. The meter box originally installed on the first floor and the main switch of each floor need to be moved. (transferred to the third floor);

5. According to the notice of Xunyang county government, it is required to install 90 monitoring facilities in each unit of the community. After many times of coordination by our department, there are currently 30;

According to the relevant provisions of Article 87, Chapter VI of Shaanxi Property Management Regulations, the maintenance costs of the above four items shall be shared according to the construction area of the property, and the maintenance, renewal and transformation costs of the * * * parts of the property and facilities and equipment shall be shared. In order to create a warm, comfortable and civilized living environment for all owners, our department will reflect this matter to you!

In addition, in recent years, due to the rising prices and wages, our current multi-storey charges are still based on the charging standard of 0.3 yuan per square meter approved by Xunyang price in 2003. To this end, our Ministry issued the document 20041February 25th. According to Shaanxi jiafei [2004] No.72. Price guidance of Xunyang County Price Bureau and Xunyang County Construction Bureau. Especially suitable for the investigation of property services is 0.40 yuan.

Hereby report!

Yuan property department

20xx year x month x day

Attached is a list of some expenses:

1, painting the first floor wall, m2 /6.00 yuan;

2.80 water meter boxes (180X 1.7M2), wrought iron, etc. , the total cost is 43,840 yuan (including 28,440 yuan for water meter box, 0/5,400 yuan for wrought iron/kloc, this time made of stainless steel);

3.30 monitoring facilities, the current offer is 78,000 yuan;

4. There are 59 meter boxes, and the 17 main power switch needs to be moved to the third floor, and the cost of each set is 8000 yuan (all the above quotations are our consulting prices).

Suggestion:

1. Make the use of maintenance funds transparent and realize the use value of the property. Please ask the temporary industry committee to organize the owners to elect representatives to directly participate in the use of maintenance funds and the supervision of project quality.

2. For the above-mentioned projects that need to be replaced, the bidding method should be adopted.

Application Report of Equipment Maintenance Mode Part II:

Dear leaders of Xing 'an Education Bureau:

Since the implementation of the 20 12 thin reform project, the multimedia equipment of audio-visual education in our school has been fully enriched. Now equipped with six classes? Banbantong? There are five electronic lesson preparation computers for teachers, one in the central computer room 1 set, four in the computer room1set, projection computers in various laboratories, and 20M broadband Internet access. Now all the teachers and students in the school are used to teaching with advanced audio-visual equipment.

In order to ensure the normal application of related equipment, our school has increased the maintenance support of follow-up funds in recent years. However, at present, due to the increase of equipment and the increase of equipment operation years, the maintenance funds are also increasing day by day. Only 20M broadband costs 14400 yuan a year, while repairing projectors and purchasing related consumables cost more than 2000 yuan last year. At present, our school urgently needs to repair nearly 100 sets of desks and chairs. Due to the limited public funds for students in our school, it is difficult for our school to bear these expenses.

In order to ensure the normal operation of teaching equipment in our school in the future and the normal development of education and teaching activities in our school, we are applying for maintenance funds of 1 10,000 yuan for the maintenance of related equipment. I hereby report for your approval.

Xing' an junior high school

20xx year x month x day

Equipment maintenance mode application report Part III:

Dear college leaders,

The power supply of 9 student computer mainframes in the editing and publishing laboratory of the College of Liberal Arts is confirmed by the maintenance department of Jinhua Company. It was because of the resurgence of the weather that the short circuit burned out after the power supply. Jinhua company has sent someone to replace all the mainframes. At present, these devices are operating normally.

In addition, the projection image of the projector in the laboratory is very blurred, which can no longer meet the teaching needs. Appraised by relevant technicians of Jinhua Company, it is suggested to replace the projector bulb. Some teachers usually burn CDs, hoping to use CD-ROMs instead of ordinary CD-ROMs of their computers. In addition, students majoring in editing and publishing need a lot of photographic equipment in their study stage, but the high price is not affordable for every family, so they apply to the college to buy relevant photographic equipment for students to study and practice.

Attach the name of the specific replacement part. I hereby apply for your approval!

I am here to convey

welcome

Editing and publishing laboratory